Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Major Repair work to Explosive Magazine at Balaghat Mine.(MOIL/MOIL LIMITED/CMC/10/23-24/ET/10) 18-07-2023 21-08-2023 21-08-2023 21-08-2023 03:30 PM Active View
2. Construction of Siding Office with Sample Room at Kandri Mine.(MOIL/MOIL LIMITED/CMC/11/23-24/ET/11) 18-07-2023 17-08-2023 17-08-2023 17-08-2023 03:30 PM Active View
3. Fabrication, installation and commissioning of water tight Doors 02 Nos at -450 feet level -550 feet level at Kandri Mine.(MOIL/MOIL LIMITED/CMC/4/23-24/ET/4) 18-07-2023 21-08-2023 21-08-2023 21-08-2023 03:30 PM Active View
4. Construction of weigh Bridge Foundation along with office Building at Tirodi Mine.(MOIL/MOIL LIMITED/CMC/12/23-24/ET/12) 18-07-2023 21-08-2023 21-08-2023 21-08-2023 03:30 PM Active View
5. Providing Plants with pot and Repairing the existing lawn in front of Administrative office at Balaghat Mine(CIVIL/BGT/LT/AGT/2023-24/656 Date 17.07.2023) 17-07-2023 28-07-2023 28-07-2023 28-07-2023 04:30 PM Active View
6. Lowering of 3Cx240sqmm LT PVC DWA cable at kandri Mine through Bore hole(AGENT/GRIII/ELECT/23-24/442, Dated 16.06.2023) 17-07-2023 28-07-2023 28-07-2023 28-07-2023 04:30 PM Active View
7. Additional excavation of ore body at -450L UG in Kandri Mine(KD/MINES/NIT/2023-24/989) 17-07-2023 24-07-2023 24-07-2023 24-07-2023 04:30 PM Active View
8. Cable bolting operation in -450L UG at Kandri Mine(KD/MINES/NIT/2023-24/993) 17-07-2023 25-07-2023 25-07-2023 25-07-2023 04:30 PM Active View
9. RCC of wall and roof in 7 No cross cut at -450L UG in Kandri Mine(KD/MINES/NIT/2023-24/991) 17-07-2023 24-07-2023 24-07-2023 24-07-2023 04:30 PM Active View
10. REQUEST FOR EXPRESSION OF INTEREST (EOI) FOR UNDERTAKING THE WORK OF VERTICAL SHAFT EQUIPPING AND FURNISHING AT OUR BALAGHAT AND GUMGAON MINE.(EOI/MOIL/CMC/TEC/BG-GM/2023/92) 17-07-2023 07-08-2023 07-08-2023 07-08-2023 03:30 PM Active View
11. Enhancement of hoisting capacity of Vertical Shaft by modification in winding engine, strengthening of headgear and design, supply and installation of Disc Brake System for Main Service Brake of 250 HP man-winding system at Gumgaon Mine(MOIL/MOIL LIMITED/CMC/14/23-24/ET/14) 17-07-2023 16-08-2023 16-08-2023 16-08-2023 03:30 PM Active View
12. Operation of 240/350 HP Pumps and related work at Dongri Buzurg Mine.(DB/MECH/23-24/408) 15-07-2023 18-07-2023 18-07-2023 18-07-2023 11:30 PM Active View
13. Supply of Medicines 277 items(PUR/MOIL/C-10/35/WE-17/ET-20) 15-07-2023 22-08-2023 22-08-2023 23-08-2023 03:30 PM Active View
14. Maintenance of Garden at various places at Chikla Mine.(Civil/CH/TE/23-24/509 Date-15.07.2023) 15-07-2023 25-07-2023 25-07-2023 25-07-2023 04:30 PM Active View
15. Driiling of bore weil (2 nos) at sukfi viltage under MolL CER.(TRD/CIVIL/23-24/1580 DATED 05/07/2023) 14-07-2023 21-07-2023 21-07-2023 21-07-2023 04:00 PM Active View
16. Drilling of bore well (2 nos) at Tirodi village under MOIL CER.(TRD/CIVIL/23-24/581 DATED 05/07/2023) 14-07-2023 21-07-2023 21-07-2023 21-07-2023 04:00 PM Active View
17. External painting to compound wall, shrub cutting, plumbing and other works at Rest House, Tirodi Mine.(TRD/CIVIL/23-24/627 DATED 11/07/2023) 14-07-2023 21-07-2023 21-07-2023 21-07-2023 04:00 PM Active View
18. Repairing of 6 Cyl. Diesel engine of Ashok Leyland tipper of Balaghat Mine.(AGT/BGT/MECH/MG/23-24/633) 13-07-2023 20-07-2023 20-07-2023 20-07-2023 04:30 PM Active View
19. Fabrication of Butterfly Valve Diaphragm along with the Spline Shaft of Air Pulsating Jig of IMB Plant of Balaghat Mine.(AGT/BGT/MECH/IMB/23-24/634) 13-07-2023 28-07-2023 28-07-2023 28-07-2023 04:30 PM Active View
20. Maintenance and Operation of Water supply Scheme at Balaghat Mine(CIVIL/BGT/LT/2023-24/602 Dt.07.07.2023) 12-07-2023 20-07-2023 20-07-2023 20-07-2023 04:30 PM Active View
21. Proposal for Out sourcing manpower for the Maintenance work of the OCF jig machinery dump screen and pilot plant(MINING/BGT/LT/AGT/2023-24/601 DT. 07.07.2023) 12-07-2023 20-07-2023 20-07-2023 20-07-2023 04:30 PM Active View
22. Repairing/replacement of partition plate for strengthening of Day Bunker and fabrication of platform for providing approach walkway from hydraulic floor to Day Bunker of Ferro Manganese plant, Balaghat Mine(MOIL/FMP/AGT/MECH/23 24/127 Date 05.07.2023) 12-07-2023 21-07-2023 21-07-2023 21-07-2023 04:30 PM Active View
23. Providing and supplying of out door Green Gym equipment for Kesri camp (New 100 Qr. Colony) at Chikla Mine.(HR/CH/TE/23-24/500 Date-12.07.2023) 12-07-2023 26-07-2023 26-07-2023 26-07-2023 04:30 PM Active View
24. Cleaning of ROM at Beldongri Group of Mine(AGENT AND Dy.G.M III-PRO/BEL/23-24/550) 11-07-2023 17-07-2023 17-07-2023 17-07-2023 04:30 PM Active View
25. Afforestation works at Ukwa Mine for Ch.3700 to ch.4800 Ukwa (Mining Lease Area 199.067 Hectare, 48.974Hac 69.581Hac purchase land)Under Sustainable Development at Ukwa Mine.(AGT/CIVIL/UK/LT/2023-24/609 dt.10.07.2023) 10-07-2023 17-07-2023 17-07-2023 17-07-2023 04:30 PM Active View
26. Interior and exterior painting works in Mine Manager Bungalow at Ukwa Mine.(AGT/CIVIL/UK/LT/2023-24/610 dt.10.07.2023) 10-07-2023 17-07-2023 17-07-2023 17-07-2023 04:30 PM Active View
27. Loading of tubs from OTC from 1750 level to 1650 Level and Transportation of loaded tubs upto shaft inset at 1650 level at Ukwa Mine.(AGT/MINING/UK/LT/2023-24/608 Dt.10.07.2023) 10-07-2023 17-07-2023 17-07-2023 17-07-2023 04:30 PM Active View
28. Pushing and unloading of tubs in U/G and on surface at 1st Vertical section at Ukwa Mine.(AGT/MINING/UK/LT/2023-24/607 Dt.10.07.2023) 10-07-2023 17-07-2023 17-07-2023 17-07-2023 04:30 PM Active View
29. Tub transportation at Nagra Section at Ukwa Mine(AGT/MINING/UK/LT/2023-24/606 dt.10.07.2023) 10-07-2023 17-07-2023 17-07-2023 17-07-2023 04:30 PM Active View
30. Extension of Electrical Substation Building near Barakholi at Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/1167 07.07.23) 08-07-2023 18-07-2023 18-07-2023 18-07-2023 04:30 PM Active View
31. Outsourcing of operator and general maintenance of Industrial Pump in Underground.(TE/CH/MECH/2023/527/461 dt. 06/07/2023) 07-07-2023 12-07-2023 12-07-2023 12-07-2023 03:30 PM Active View
32. Requirement of spares for Vibrating feeder Type 750 mm for Chikla Mine(TE/CH/MECH/23-24/10007595/425 Dt 01/07/2023) 07-07-2023 17-07-2023 17-07-2023 17-07-2023 03:30 PM Active View
33. Fabrication of Pinion Gear and Idler gear set for Tub Tippler of material handling plant.(TE/CH/MECH/23-24/76-24186/432 Dt001/07/2023) 07-07-2023 18-07-2023 18-07-2023 18-07-2023 03:30 PM Active View
34. Fabrication, erection and installation of 50 MT Road Weigh bridge size 3 X9 Meter at Pathri Ghat.(TE/CH/HO/MECH/CAP/2023/17/429 Dt 01/07/2023) 07-07-2023 18-07-2023 18-07-2023 18-07-2023 03:30 PM Active View
35. COMPREHENSIVE AMC OF COMPUTERS, PRINTERS, SCANNERs, UPSs, Network Unit at Tirodi Mine and Sitapatore Mine(TE/BGT/SYSTEM/AMC/2023-24/600) 07-07-2023 21-07-2023 21-07-2023 21-07-2023 04:00 PM Active View
36. Repairing of old elongated and damaged Lead cathode plates at EMD Plant DB Mine(MOIL/DB/EMD/ADGM/23-24/381) 06-07-2023 14-07-2023 14-07-2023 14-07-2023 04:30 PM Active View
37. Providing and Coating of FRVE of Neutralization tank at EMD Plant, DB Mine(MOIL/DB/EMD/ADGM/23-24/382) 06-07-2023 14-07-2023 14-07-2023 14-07-2023 04:30 PM Active View
38. REPLACEMENT AND INSTALLATION OF 3.3KV HT VCB PANEL AT 8TH LEVEL UNDERGROUND OF BALAGHAT MINE.(BGT/TE/ELECT/AJGM/23-24/575) 05-07-2023 13-07-2023 13-07-2023 13-07-2023 03:30 PM Active View
39. EXPRESSION OF INTEREST FOR PROVIDING CONSULTANCY FOR PRELIMINARY DESIGN, DETAILED COST ESTIMATE/ SCHEDULE, TENDER DOCUMENT AND ASSISTANCE IN EVALUATION OF BIDS IN RESPECT OF PROPOSED PRODUCTION AND VENTILATION SHAFTS AT DONGRI BUZURG MINE OF MOIL.(EOI/MOIL/CMC/TECH/DB/2023/89) 05-07-2023 02-08-2023 02-08-2023 02-08-2023 03:30 PM Active View
40. Repairing of Polder Pump-80HP of Bhatera Pump house of Blaghat Mine.(AGT/BGT/MECH/POLDER/23-24/560) 04-07-2023 27-07-2023 27-07-2023 27-07-2023 04:30 PM Active View
41. Repairing of Polder Pump-80HP of Bhatera Pump house of Blaghat Mine.(AGT/BGT/MECH/POLDER/23-24/560) 04-07-2023 27-07-2023 27-07-2023 27-07-2023 04:30 PM Active View
42. Erection of foundation concrete base and installation of additional 120HP and 150HP multistage pumps with 6 inch GI pipeline from pump house to second outlet shaft at 15th L Underground.(AGT/BGT/MECH/PUMP/23-24/561) 04-07-2023 12-07-2023 12-07-2023 12-07-2023 04:30 PM Active View
43. Limited Tender for Computer and peripherals (Printers, UPSs and LAN) Maintenance Contract of Dongri Buzurg Mine.(DB/SYSTEM/AMC/2023-24/444) 04-07-2023 13-07-2023 13-07-2023 13-07-2023 04:00 PM Active View
44. SHIFTING, FIXING, INSTALLATION OF 25 MTR HIGH MAST TOWER NEAR MINE STORE OF BALAGHAT MINE(BGT/TE/ELECT/AJGM/23-24/573) 04-07-2023 12-07-2023 12-07-2023 12-07-2023 03:30 PM Active View
45. Proposal for Tub Transport from all Level inset UG to surface at 2nd vertical shaft at Ukwa Mine(AGT/MIN/UK/LT/2023-24/551 Date- 28.06.2023) 03-07-2023 10-07-2023 10-07-2023 10-07-2023 04:30 PM Active View
46. Limited Tender for Computer and peripherals (Printers, UPSs and LAN) Maintenance Contract of CHIKLA Mine.(CH/SYSTEM/AMC/2023-24/441 Dt 04/07/2023) 03-07-2023 13-07-2023 13-07-2023 13-07-2023 04:30 PM Active View
47. Comprehensive Annual Maintenance Contract (CAMC) of Computers, Printers, UPSs installed at Balaghat Mine(TE/BGT/SYSTEM//AMC/2023-24/536) 01-07-2023 17-07-2023 17-07-2023 17-07-2023 04:00 PM Active View
48. Operation of 240/350 HP Pumps and related work at Dongri Buzurg Mine.(DB/MECH/2023-24/408) 01-07-2023 08-07-2023 08-07-2023 08-07-2023 04:30 PM Active View
49. Providing and laying plain cement concrete flooring at premises of Magazine at Chikla Mine.(Civil/CH/TE/23-24/416 Date-29.06.2023) 01-07-2023 15-07-2023 15-07-2023 15-07-2023 04:30 PM Active View
50. Design, Manufacturing and Supplying of Plumber Block-1No. of Pinion Gear Shaft of Production Shaft 550HP Winder of Balaghat Mine(AGT/BGT/MECH/PS/23-24/528) 30-06-2023 28-07-2023 28-07-2023 28-07-2023 04:30 PM Active View
51. Repairing of Float Sub-assemblies of LHD machine deployed at various underground levels of Balaghat Mine(AGT/BGT/MECH/LHD/23-24/529) 30-06-2023 21-07-2023 21-07-2023 21-07-2023 04:30 PM Active View
52. Empanelment of Advocates 29-06-2023 14-07-2023 14-07-2023 15-07-2023 11:00 AM Active View
53. Fabrication of Steel manway 1.5 M X0.84 Meter for Chikla mine.(TE/CH01/MECH/GEN/2023/310/395 dt 6/06/2023) 29-06-2023 05-07-2023 05-07-2023 05-07-2023 03:00 PM Active View
54. Fabrication of Tramline accessories for underground use at Chikla Mine.(TE/CH/MECH/23-24/76-26267/396 dt 26/06/2023) 29-06-2023 05-07-2023 05-07-2023 05-07-2023 03:30 PM Active View
55. Repairing of 4 Stage Hydraulic Pump of Universal Drill Machine UDM operating at 4th Level.(TE/CH/MECH/23-24/76-26350/397 dt. 26/06/2023) 29-06-2023 10-07-2023 10-07-2023 10-07-2023 03:30 PM Active View
56. Repairing of 3 Stage Hydraulic Pump of BEML make Side Dump Loader machine(TE/CH/MECH/23-24/76-26339/398 dt 26/06/2023) 29-06-2023 11-07-2023 11-07-2023 11-07-2023 03:30 PM Active View
57. Repair of 75 HP Flow more make Multistage Centrifugal pump at Chikla-B section 70 L Ug at Chikla(TE/CH/MECH/23-24/76-26411/399 dt. 26/06/2023) 29-06-2023 11-07-2023 11-07-2023 11-07-2023 03:30 PM Active View
58. Line Boring work of bucket and arm assy. and repairing of H-Link, Idler assy. and spare bucket of Hyd. Excavator of Balaghat Mine.(AGT/BGT/MECH/EXCV/23-24/520) 28-06-2023 14-07-2023 14-07-2023 14-07-2023 04:30 PM Active View
59. Fabrication of 1.5Mtrs Dia. X 2.4Mtrs Height Steel Manways-12 sets for underground at Balaghat Mine.(AGT/BGT/MECH/Man-way/23-24/521) 28-06-2023 11-07-2023 11-07-2023 11-07-2023 04:30 PM Active View
60. Hiring of Diesel Jeep-1No. for Balaghat Mine for a period of 4 months.(AGT/BGT/MECH/HIRING/23-24/516) 27-06-2023 07-07-2023 07-07-2023 07-07-2023 04:30 PM Active View
61. Requirement of Manpower for collection of canteen food items and serving it to Mine employees at Chikla Mine.(Civil/CH/TE/23-24/401 Date-27.06.2023) 27-06-2023 06-07-2023 06-07-2023 06-07-2023 04:30 PM Active View
62. Repairs to RCC Roof of Labour and staff quarters of Residential colonies at Ukwa Mine(AGT/CIVIL/UK/LT/2023-24/489 Date- 22.06.2023) 26-06-2023 01-07-2023 01-07-2023 01-07-2023 04:30 PM Active View
63. Repairing of Worn Our Wheels-65Nos. of G.B. Car Deployed in Underground Levels of Balaghat Mine.(AGT/BGT/MECH/GB-CAR/23-24/492) 24-06-2023 10-07-2023 10-07-2023 10-07-2023 09:00 AM Active View
64. PURCHASE OF SPARES OF LT MAKE WHEEL LOADERS-9020 OF BALAGHAT MINE.(PUR/MOIL/BGT/LT/23-24/494) 24-06-2023 30-06-2023 30-06-2023 30-06-2023 04:30 PM Active View
65. Repairing of Track Chain Assembly-2sets of Hydraulic Excavator Tata Hitachi-220 deployed at Balaghat Mine.(AGT/BGT/MECH/Excv./23-24/493) 24-06-2023 10-07-2023 10-07-2023 10-07-2023 04:30 PM Active View
66. SUPPLY OF SLURRY TRANSFER HOSE FOR IMB PLANT OF DONGRIBUZURG MINE(PUR/DB/MECH/2023-2024/376) 23-06-2023 13-07-2023 13-07-2023 13-07-2023 04:30 PM Active View
67. Expression of Interest (EOI) for Running School (CBSE) At Village Ukwa, District Balaghat (MP).(MOIL/HO/EOI/23-24/01) 23-06-2023 25-07-2023 25-07-2023 25-07-2023 04:30 PM Active View
68. Fabrication and casting of Bucket tooth point for TATA 1200V Hydraulic Excavator operating at D B Mine(DB/MECH/2023-24/375) 22-06-2023 19-07-2023 19-07-2023 19-07-2023 04:00 PM Active View
69. Laying of 60lbs rail at 12th level north at Balaghat Mine.(MINING/BGT/LT/AGT/2023-24/475 DT22.06.2023) 22-06-2023 28-06-2023 28-06-2023 28-06-2023 04:30 PM Active View
70. Drain cleaning along with tramline at 11th level south and 11th level north section at Balaghat Mine.(MINING/BGT/LT/AGT/2023-24/476 DT.22.06.2023) 22-06-2023 28-06-2023 28-06-2023 28-06-2023 04:30 PM Active View
71. Making of Artificial pillar of RCC at 12th level north section at Balaghat Mine(MINING/BGT/LT/AGT/2023-24/478 DT.22.06.2023) 22-06-2023 28-06-2023 28-06-2023 28-06-2023 04:30 PM Active View
72. Making and Supply of mud plug at Balaghat Mine.(MINING/BGT/LT/AGT/2023-24/477 DT.22.06.2023) 22-06-2023 28-06-2023 28-06-2023 28-06-2023 04:30 PM Active View
73. PURCHASE OF SPARE OF 240HP KIRLOSKAR MAKE CENTRIFUGAL PUMP. MODEL-RKB-125/3OK, 8STG AT BALAGHAT MINE.(PUR/MOIL/BGT/PUMP/23-24/457) 21-06-2023 04-07-2023 04-07-2023 04-07-2023 04:30 PM Active View
74. RCC work at 13.5 Level north in footwall extension areas of x-cut 29 at Balaghat Mine(MINING/BGT/LT/AGT/2023-24/466 Dt.21.06.2023) 21-06-2023 27-06-2023 27-06-2023 27-06-2023 04:30 PM Active View
75. Removal/handling of spillage at 16.5 level at Balaghat Mine(MINING/BGT/LT/AGT/2023-24/467 dt.21.06.2023) 21-06-2023 27-06-2023 27-06-2023 27-06-2023 04:30 PM Active View
76. Removal/handling of spillage at 15 level at Balaghat Mine.(MINING/BGT/LT/AGT/2023-24/465 Dt.21.06.2023) 21-06-2023 27-06-2023 27-06-2023 27-06-2023 04:30 PM Active View
77. Extra excavation of haulage road of 13.5L North section at Balaghat Mine(MINING/BGT/LT/AGT/2023-24/468 DT.21.06.2023) 21-06-2023 27-06-2023 27-06-2023 27-06-2023 04:30 PM Active View
78. Shifting, unloading and Laying of 3CX120Sqmm 11KV HT Cable magazine at Ukwa Mine(AJGM/UK/ELECT/2023-24/458) 21-06-2023 28-06-2023 28-06-2023 28-06-2023 04:30 PM Active View
79. Construction of New Security Incharge and Guard Room in front of Mine gate at Ukwa Mine.(MOIL/MOIL LIMITED/CMC/2/23-24/ET/2) 21-06-2023 20-07-2023 20-07-2023 20-07-2023 03:30 PM Active View
80. Construction of New Security Incharge and Guard Room in front of Mine gate at Ukwa Mine.(MOIL/MOIL LIMITED/CMC/2/23-24/ET/2) 21-06-2023 20-07-2023 20-07-2023 20-07-2023 03:30 PM Active View
81. Construction of New Security Incharge and Guard Room in front of Mine gate at Ukwa Mine.(MOIL/MOIL LIMITED/CMC/2/23-24/ET/2) 21-06-2023 24-07-2023 24-07-2023 24-07-2023 03:30 PM Active View
82. Construction of Two Wheeler Parking Shed in rear side of Administrative Building at Dongribuzurg Mine(DB/CIVIL/NIT/TE/23-24/1022 20.06.23) 20-06-2023 30-06-2023 30-06-2023 30-06-2023 04:30 PM Active View
83. Removal of Waste material from setting pond at Nagara plant at Ulkwa Mine(AGT/Min/UK/LT/2023-24/456 Date- 17.06.2023) 20-06-2023 28-06-2023 28-06-2023 28-06-2023 04:30 PM Active View
84. Outsourcing of Roof bolting operation in Gumgaon Mine.(Agent/Gum/Min/23-24/469, Date 20.06.2023) 20-06-2023 28-06-2023 28-06-2023 28-06-2023 04:30 PM Active View
85. Transportation of Bottom Ash from Waregaon Loading station (Khaparkheda Power Plant) to Gumgaon Mine.(Agent/Gum/Min/23-24/471, Date 20.06.2023) 20-06-2023 27-06-2023 27-06-2023 27-06-2023 04:30 PM Active View
86. Maintenance of Garden at Gumgaon Mine(AGT/GUM/civil/LT/23-24/730 DT 20/06/2023) 20-06-2023 01-07-2023 01-07-2023 01-07-2023 04:30 PM Active View
87. Replacement of MSRL cell tank at the place of existing tank at old cell bay of EMD Plant, DB Mine.(MOIL/DB/EMD/ADGM/TE /23-24/352) 20-06-2023 04-07-2023 04-07-2023 04-07-2023 04:30 PM Active View
88. Additional excavation of ore body at -450L U/G in Kandri Mine(KD/MINES/NIT/2023-24/728) 19-06-2023 26-06-2023 26-06-2023 26-06-2023 04:30 PM Active View
89. Cleaning, Maintenance and Up keeping of Rest House at Kandri Mine(KD/PER/NIT/2023-24/747) 19-06-2023 27-06-2023 27-06-2023 27-06-2023 04:30 PM Active View
90. Transportation of ROM tubs from underground at Kandri Mine(KD/MINES/NIT/2023-24/730) 19-06-2023 26-06-2023 26-06-2023 26-06-2023 04:30 PM Active View
91. Cleaning of road and removing of debris from main road at Balaghat Mine.(CIVIL/BGT/LT/AGT/2023-24/439 dT.16.06.2023) 17-06-2023 19-06-2023 19-06-2023 19-06-2023 04:30 PM Active View
92. Painting to Road side structure from Main gate to guest house, Front of new administrative Building and old Administrative Building at Balaghat Mine.(CIVIL/BGT/LT/AGT/2023-24/441 DT.16.06.2023) 17-06-2023 19-06-2023 19-06-2023 19-06-2023 04:30 PM Active View
93. Painting to Winder House Substation Workshop at 6Th Level Pit Top at Balaghat Mine(CIVIL/BGT/LT/AGT/2023-24/ 442 DT.16.06.2023) 17-06-2023 19-06-2023 19-06-2023 19-06-2023 04:30 PM Active View
94. Landscaping and beautification work at open area in Front of New Administrative Building at Balaghat Mine.(CIVIL/BGT/LT/AGT/2023-24/440 DT.16.06.2023) 17-06-2023 19-06-2023 19-06-2023 19-06-2023 04:30 PM Active View
95. The Manual collection of sand from Pench River Bank to sand stock yard at Kalaphata Ghat(Munsar/MINES/NIT/2023-24/439) 17-06-2023 24-06-2023 24-06-2023 24-06-2023 04:30 PM Active View
96. Fabrication of steel ore pass chute 1.00 Meter Dia. X 1.05 Meter height for Chikla Mine.(TE/CH/MECH/GEN/2023/273/336 date 11/06/2023) 16-06-2023 21-06-2023 21-06-2023 21-06-2023 03:30 PM Active View
97. REPAIR TO ROTOR OF 300HP, 3.3KV, 1481 RPM SQUIRREL CAGE INDUCTION MOTOR OF 300HP PUMP(BGT/TE/ELECT/AJGM/23-24/411) 16-06-2023 22-06-2023 22-06-2023 22-06-2023 03:30 PM Active View
98. Manual Collection of sand from Pench river Bank to sand yard at Kalaphata Ghat(KD/MINES/NIT/2023-24/701) 16-06-2023 23-06-2023 23-06-2023 23-06-2023 04:30 PM Active View
99. Repairing Works towards upgradation and renovation of toilet attached to Mine Managers Cabin in Main Administrative Block of Dongribuzurg Mine.(DB/CIVIL/NIT/TE/23-24/975 15.06.2023) 16-06-2023 23-06-2023 23-06-2023 23-06-2023 04:30 PM Active View
100. Waterproofing of roof slab of Administrative Building of EMD Plant, Dongribuzurg Mine.(DB/EMD/CIVIL/NIT/TE/23-24/978 15.06.23) 16-06-2023 23-06-2023 23-06-2023 23-06-2023 04:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.