Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Construction of Retaining Wall and Platform for Railway siding at Kandri Mine(Civil /HO/16-17/ KAN/85) 30-01-2017 01-03-2017 01-03-2017 01-03-2017 03:30 PM Active View
2. Construction of Motor Garage at Munsar Mine(MOIL/16-17/ET/172) 30-01-2017 01-03-2017 01-03-2017 01-03-2017 03:30 PM Active View
3. Construction of Precast Boundary wall around mine lease in Kaichi camp at Munsar Mine(MOIL/16-17/ET/173) 30-01-2017 01-03-2017 01-03-2017 01-03-2017 03:30 PM Active View
4. HIRING OF 50 MT CAPACITY MOBILE CRANE WITH 360 DEGREE REVOLVING TELESCOPIC EXTENDED BOOM OF UNLOADING AND ASSEMBLING OF BH60M Dumper- 3 Nos AT DONGRI BUZURG MINE (A-II/CHK/DB/16-17/ 864 dtd 28.01.2017) 28-01-2017 30-01-2017 30-01-2017 30-01-2017 2:30 PM Active View
5. RENOVATION OF OLD MINE MANAGER BUNGLOW TO CONVERT TO TRANSIT ROOM(TRD/CIVIL/A/2016-17/3069A DT 21.01.2017) 25-01-2017 31-01-2017 31-01-2017 31-01-2017 04:30 PM Active View
6. Concrete lining of cross cut in new wide ore body at -200 L at Gumgaon Mine(Mining/Gum/16-17/3498 Date 23.01.2017) 25-01-2017 01-02-2017 01-02-2017 01-02-2017 04:30 PM Active View
7. Washing, Picking and collection of material from waste/reject (crude) from west side of 6 B section at Tirodi Mine(Gr.II/GM(M)/CONT/WASH/66/TRD/2016-17/50) 25-01-2017 01-02-2017 01-02-2017 01-02-2017 03:30 PM Active View
8. WEBSITE LIMITED TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF PRINTER RIBBON CARTRIDGES FOR TVS MSP-255 MARATHON PRINTER, EPSON-FX-2175 PRINTER, TVS MSP 430 PRINTER, LIPI 6605 LINE MATRIX(PUR/MOIL/C-1/203/E-73/1918-M Dt.25.01.2017) 25-01-2017 17-02-2017 17-02-2017 17-02-2017 03:30 PM Active View
9. Pattern Making casting machining and dynamic Balacing of Pump spares for 75 HP Maxflow make Pump at 8th Level Under ground of Balaghat Mine(DGM/BGT/MECH/PUMP/16-17/7389) 24-01-2017 03-02-2017 03-02-2017 03-02-2017 04:30 PM Active View
10. PURCHASE OF VIBRATOR ASSEMBLY (MAKE-MS TRF LIMITED, JAMSHEDPUR) - 1 SET. (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/212/E-72/1913-M DT.24/01/2017) 24-01-2017 13-02-2017 13-02-2017 13-02-2017 03:30 PM Active View
11. Designing supply fabrication installation and commissioning of Electronic Belt Weigher system for IMB Plant Balaghat Mine(DGM/BGT/MECH/IMBP/16-17/7394) 24-01-2017 14-02-2017 14-02-2017 14-02-2017 04:30 PM Active View
12. PURCHASE OF VIBRATOR ASSEMBLY (MAKE-MS TRF LIMITED, JAMSHEDPUR) - 1 SET. (AS PER ANNEXURE - A ENCLOSED). (PUR/MOIL/C-4/212/E-72/1913-M DT.24/01/2017) 24-01-2017 27-02-2017 27-02-2017 27-02-2017 3:30 PM Active View
13. Designing supply fabrication installation and commissioning of Electronic Belt Weigher system for IMB Plant Balaghat Mine (DGM/BGT/MECH/IMBP/16-17/7394) 24-01-2017 24-02-2017 24-02-2017 24-02-2017 4:30 PM Active View
14. Designing supply fabrication installation and commissioning of Electronic Belt Weigher system for IMB Plant Balaghat Mine (DGM/BGT/MECH/IMBP/16-17/7394) 24-01-2017 01-03-2017 01-03-2017 01-03-2017 4:30 PM Active View
15. Construction of Doctor cabin(Bel/Civil/AGT/16-17/2966) 23-01-2017 30-01-2017 30-01-2017 30-01-2017 04:30 PM Active View
16. Development Works and Laying of Paver Block for the parking zone infront of Integrated Manganese Beneficiation Plant, IMB at Balaghat Mine(Civil/BGT/T.E./2016-17/7391 Dated 23.01.2017) 23-01-2017 31-01-2017 31-01-2017 31-01-2017 04:00 PM Active View
17. Construction and erection of Precast Pre stressed concrete elements for underground supports at Balaghat Mine(Civil/HO/16-17/BGT/81) 23-01-2017 23-02-2017 23-02-2017 23-02-2017 03:30 PM Active View
18. Construction of Water Supply Scheme at Dongribuzurg Mine.(MOIL/16-17/ET/166) 23-01-2017 23-02-2017 23-02-2017 23-02-2017 03:30 PM Active View
19. Construction of Partition walls for stacking Yard ,Retaining walls at Ferro Manganese Plant of Balaghat Mine.(Civil/HO/16-17/BGT/80) 23-01-2017 23-02-2017 23-02-2017 23-02-2017 03:30 PM Active View
20. Construction of Vehicle Shed With washing pit at Gumgaon Mine.(MOIL/16-17/ET/164) 23-01-2017 23-02-2017 23-02-2017 23-02-2017 03:30 PM Active View
21. LOADING AND UNLOADING OF STEEL SECTIONS, CEMENT BAGS AND OTHER MATERIAL WITH STACKING AT BALAGHAT MINE STORE(Gr.-I/CGM(PR)/CONT/LOADING/27/BGT/2016-17/15) 21-01-2017 30-01-2017 30-01-2017 30-01-2017 03:30 PM Active View
22. Handling and Despatch of ore at Munsar Mine (MOIL/16-17/ET/160) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
23. Handling and Despatch of ore at Beldongri Mine (MOIL/16-17/ET/157) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
24. Handling and Despatch of ore at Tirodi Mine (MOIL/16-17/ET/155) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
25. Handling and Despatch of ore at Kandri Mine (MOIL/16-17/ET/159) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
26. Handling and Despatch of ore at Sitapatore Mine (MOIL/16-17/ET/156 ) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
27. Handling and Despatch of ore at Gumgaon Mine (MOIL/16-17/ET/158 ) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
28. Handling and Despatch of ore at Dongri Buzurg Mine (MOIL/16-17/ET/154) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
29. Handling and Despatch of ore at Chikla Mine (MOIL/16-17/ET/153 ) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
30. Handling and Despatch of ore at Balaghat Mine (MOIL/16-17/ET/152) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
31. Repair of water supply pipeline from Bhatera Pumping Station to Balaghat Mine and installation of air valves at Bhatera Pumping Station towards water supply scheme at Balaghat Mine(83/Civil/BGT/2016-17/7281 Date 17.01.2017) 20-01-2017 27-01-2017 27-01-2017 27-01-2017 04:00 PM Active View
32. Development Works infront of Siding Office and Sample Preparation Room at Balaghat Mine(Civil/BGT/T.E/2016-17/7278 Date 17.01.2017) 19-01-2017 25-01-2017 25-01-2017 25-01-2017 04:00 PM Active View
33. PURCHASE OF OFFICE FURNITURE, MAKE GODREJ - 14 ITEMS.(AS PER ANNEXURE - A ENCLOSED.(PUR/MOIL/C-4/54/E-70/1884-M DT.19/01/2017) 19-01-2017 08-02-2017 08-02-2017 08-02-2017 03:30 PM Active View
34. Obtaining Environmental Clearance for Gumgaon, Kodegaon and Tegai manganese mine over an area of 126.84 Hec.(. Sr.DGM(Mines)/ EC-Gumgaon/2016-17/ 03) 18-01-2017 27-01-2017 27-01-2017 27-01-2017 03:00 PM Active View
35. Making kaccha road inside the NEERI plantation area from Dr Juwarkar statue upto Incline haulage road at Gumgaon Mine(CIVIL/16-17/GUM/3460 Date 16.01.2017) 18-01-2017 27-01-2017 27-01-2017 27-01-2017 04:30 PM Active View
36. Obtaining Environmental Clearance for Satak manganese mine over an area of 5.62 Hec(Sr.DGM(Mines)/ SE/EC-Satak/2016-17/02) 18-01-2017 27-01-2017 27-01-2017 27-01-2017 03:00 PM Active View
37. Renovation works of Mine Magzine at Gumgaon Mine(CIVIL/16-17/GUM/3459 Date 16.01.2017) 18-01-2017 27-01-2017 27-01-2017 27-01-2017 04:30 PM Active View
38. BLANKET RATE CONTRACT FOR ONE YEAR FOR SUPPLY OF VARIOUS TYPE OF PAINTS, THINNER etc.(WE-107 DT.18/01/2017(e-Tenderno.MOIL/16-17/ET/168)) 18-01-2017 14-02-2017 14-02-2017 14-02-2017 03:30 PM Active View
39. Construction of Sub-Station Building for Housing L.T. and H.T. Switchgear along with Transformer Room for II nd Vertical Shaft at Ukwa Mine.(Civil /HO/16-17/ UK/82 Dt 17/01/2017) 18-01-2017 17-02-2017 17-02-2017 17-02-2017 03:30 PM Active View
40. Purchase of Agitator Assembly(PUR/MOIL/C-11/43/WE-105 (MOIL/16-17/ET/165)) 18-01-2017 27-02-2017 27-02-2017 27-02-2017 03:30 PM Active View
41. Drop raise from 3rd to 4th and its allied work at Munsar Mine(GM(M)-III/CONT/40/UG-DEV/MUN/16-17/48) 17-01-2017 24-01-2017 24-01-2017 24-01-2017 03:30 PM Active View
42. Outsourcing the assignment of tub pushing in OCF at Munsar mine (Mun/Mine/HO/Agent/16-17/3875) 16-01-2017 25-01-2017 25-01-2017 25-01-2017 4:30 PM Active View
43. Outsourcing the assignment of tub pushing in OCF at Munsar mine (Mun/Mine/HO/Agent/16-17/3875) 16-01-2017 25-01-2017 25-01-2017 25-01-2017 4:30 PM Active View
44. Dismantlling of old quarters of kaichi camp at Munsar Mine. (Mun/ C/HO/Agent/16-17/ 3874 ) 16-01-2017 25-01-2017 25-01-2017 25-01-2017 4:30 PM Active View
45. Collection and stacking of Mn ore through Vibrating screen at Munsar Mine (GM(M)-III/CONT/VBS/47/MUN/16-17/49) 16-01-2017 24-01-2017 24-01-2017 24-01-2017 3:30 PM Active View
46. Picking and collection of SM gr. (KDL-435) and (KDL-446) through off the pit working at Kandri Mine (GM(M)-III/CONT/50/SM/KAN/16-17/49) 16-01-2017 10-02-2017 10-02-2017 10-02-2017 3:30 PM Active View
47. Additional excavation in manganiferrous rock for concreting of cross-cut, manways and ore pass etc in underground at Munsar Mine (GM(M)-III/CONT/UG-DEV/41/GUM/16-17/48) 16-01-2017 10-02-2017 10-02-2017 10-02-2017 3:30 PM Active View
48. Annual repairs and maintenance contract for Domestic electrical installation of residential and non-residential building of Munsar mine (ELECT/MUN/ADGM/16-17/1235) 15-01-2017 30-01-2017 30-01-2017 30-01-2017 3:30 PM Active View
49. Fabrication of roof bolt on labour rate basis at Gumgaon Mine (MECH/GUM/16-17/3442 DT 14.01.2017) 14-01-2017 23-01-2017 23-01-2017 23-01-2017 4:30 PM Active View
50. Construction of barbed wire fencing at near 6 No. at Tirodi Mine (TRD/CIVIL/A/2016-17/2969 Dt 12.01.2017) 14-01-2017 21-01-2017 21-01-2017 21-01-2017 4:30 PM Active View
51. Purchase of Gravel (Black Gitti) for U/G Concreting work at Ukwa Mine (Gr.-I/CGM(PR)/CONT/GITTI/26/UK/2016-17/14) 13-01-2017 23-01-2017 23-01-2017 23-01-2017 3:30 PM Active View
52. PURCHASE OF SPARES FOR KIRLOSKAR MAKE COMPRESSOR (PUR/MOIL/C-5/38/E-63/1725-M ) 12-01-2017 25-01-2017 25-01-2017 25-01-2017 3:30 PM Active View
53. PURCHASE OF SAPRES FOR DRUM COUPLING (PUR/MOIL/C-5/33/E-64/1752-M) 12-01-2017 25-01-2017 25-01-2017 25-01-2017 3:30 PM Active View
54. Const of retaining cum barricade wall back side of pit office at Gumgaon Mine (Civil/16-17/GUM/3417 Date 10.01.2017) 12-01-2017 20-01-2017 20-01-2017 20-01-2017 4:00 PM Active View
55. Pathway and brick paving in front of Bio diversity park at Gumgaon Mine (Civil/16-17/Gum/3416 Date 10.01.2017) 12-01-2017 20-01-2017 20-01-2017 20-01-2017 4:00 PM Active View
56. PURCHASE OF SPARES FOR VENTRA LOCOMOTIVE (PUR/MOIL/C-5/58/E-65/1753-M ) 12-01-2017 30-01-2017 30-01-2017 30-01-2017 3:30 PM Active View
57. Operation and minor maintenance of water supply scheme at MOIL Bhawan, CMD Bungalow, C.M.S. with Type A Quarters and West Court with Guest House, Transit House and Bunsivilla compound area, MOIL, Nagpur. (Civil /HO/16-17 /HO/79 Dt- 11/01/2017) 12-01-2017 27-01-2017 27-01-2017 27-01-2017 3:30 PM Active View
58. Washing, picking and collection of material from East side of A dump (waste dump) at Tirodi Mine(MOIL/16-17/ET/145) 12-01-2017 31-01-2017 31-01-2017 31-01-2017 03:30 PM Active View
59. Wired Wireless Internet Leased Line at MOIL Limited ( Sys/Internet/2016-17/16 ) 12-01-2017 02-02-2017 02-02-2017 02-02-2017 3:30 PM Active View
60. e-procurement of Belt Conveyor Roller/Idler -38 Items (WE-106 e-tender No.MOIL/16-17/ET-162, Dt.12.01.17) 12-01-2017 28-02-2017 28-02-2017 28-02-2017 3:30 PM Active View
61. Requirement of chock sleeper at Gumgaon Mine (Mining/Gum/16-17/3418 dATE 10.01.2017) 11-01-2017 20-01-2017 20-01-2017 20-01-2017 4:30 PM Active View
62. e-procurement of Cage Suspension Gear - 3 items. (WE-100 e-tender No.MOIL/16-17/ET-161, Dt.11.01.17) 11-01-2017 14-02-2017 14-02-2017 14-02-2017 3:30 PM Active View
63. Supplying, providing, installation and commissioning of Centralized UPS and required wiring for computers of office buildings at Balaghat, Tirodi in MP and Chikla, Dongri Buzurg, Gumgaon, Munsar and Kandri Mine in Maharashtra. (SDGM(E)/86/ HO/16-17/ 280) 10-01-2017 30-01-2017 30-01-2017 30-01-2017 3:30 PM Active View
64. Construction of Gard Room, Waiting Room near Mine Gate at Kandri Mine. (CIVIL/HO/16-17/KAN/77 Dt 09/01/2017) 10-01-2017 31-01-2017 31-01-2017 31-01-2017 3:30 PM Active View
65. Washing, Picking and collection of material from South West side of A dump at Tirodi Mine (Gr.II/GM(M)/CONT/R-Dump/61/TRD/2016-17/48) 09-01-2017 18-01-2017 18-01-2017 18-01-2017 3:30 PM Active View
66. Picking and collection of material from diluted ROM at South Pit of Tirodi Mine. (Gr.II/GM(M)/CONT/CL-ROM/62/TRD/2016-17/49) 09-01-2017 18-01-2017 18-01-2017 18-01-2017 3:30 PM Active View
67. Hiring of Services of Architect and Design Engineering Firm for proposed Construction of surface Infrastructure Buildings for 2 Vertical Shaft at Munsar Mine.(The Project Cost is estimated to Rs. 4,00,00,000/- approximately) (Civil /HO/16-17/ Mun/76 Dt 09 09-01-2017 09-02-2017 09-02-2017 09-02-2017 3:30 PM Active View
68. Underground Development work at -470 L of vertical section at Chikla Mine. (Gr.II/GM(M)/CONT/UG-DEV/60/CH/2016-17/47) 07-01-2017 17-01-2017 17-01-2017 17-01-2017 3:30 PM Active View
69. Breaking of steam coal into size range 25-75mm and stacking at Ferro Manganese Plant, Balaghat Mine. (BGT/FMP/TE/2016-17/834 Dated 04.01.2017) 06-01-2017 12-01-2017 12-01-2017 12-01-2017 4:30 PM Active View
70. Making and Supply of Stemming Material (Mud Plug) at Balaghat Mine (Gr.-I/CGM(PR)/CONT/MUD PLUG/25/BGT/2016-17/13) 06-01-2017 16-01-2017 16-01-2017 16-01-2017 3:30 PM Active View
71. Hiring of Architectural and Structural consultant for Construction of Guest House at Kandri Mine. ( The Project cost is estimated to Rs. 95,00,000 /- approximately)(CIVIL/HO/16-17/KAN/75 Dt- 05/01/2017) 06-01-2017 19-01-2017 19-01-2017 19-01-2017 03:30 PM Active View
72. Construction of Sewerage Treatment Plant at MOIL Bhavan Nagpur(Civil/HO/2016-17/74) 06-01-2017 31-01-2017 31-01-2017 31-01-2017 03:30 PM Active View
73. Sinking of new fan drift and allied development at Chikla Mine (MOIL/16-17/ET/150) 06-01-2017 07-02-2017 07-02-2017 07-02-2017 3:30 PM Active View
74. Steam Coal 650 MT(PUR/MOIL/C-11/102/WE-92 (MOIL/16-17/ET/148)) 05-01-2017 25-01-2017 25-01-2017 25-01-2017 03:30 PM Active View
75. Sodium Carbonate(PUR/MOIL/C-11/4/WE-96 (MOIL/16-17/ET/146)) 05-01-2017 03-02-2017 03-02-2017 03-02-2017 03:30 PM Active View
76. Picking and collection of 3rd grade and LGHS ore from diluted ROM at South pit of Tirodi Mine(MOIL/16-17/ET/147) 05-01-2017 31-01-2017 31-01-2017 31-01-2017 03:30 PM Active View
77. e-procurement of G.I.Wire Netting and S.S.Screen Cloth -9 items(WE-97 e-tender No.MOIL/16-17/ET-151, Dt.05.01.2017) 05-01-2017 09-02-2017 09-02-2017 09-02-2017 03:30 PM Active View
78. Picking and collection of small 25 per Mn (GML-464) from dumps through off the pit working at Gumgaon Mine(GM(M)-III/CONT/48/R-DUMP/GUM/16-17/47) 04-01-2017 11-01-2017 11-01-2017 11-01-2017 03:30 PM Active View
79. Underground concreting for stope block preparation at Munsar Mine(GM(M)-III/CONT/UG-CONC/49/MUN/16-17/46) 04-01-2017 11-01-2017 11-01-2017 11-01-2017 03:30 PM Active View
80. Rate Contract For One Year For Supply Of COMPRESSED OXYGEN GAS AND DISSOLVED ACETYLENE GAS(C-11/115/WE-93 (MOIL/16-17/ET/149)) 04-01-2017 25-01-2017 25-01-2017 25-01-2017 03:30 PM Active View
81. PURCHASE OF GREASE GUNS.(PUR/MOIL/C-1/203/E-68/1794-M Dt.04/01/2017) 04-01-2017 27-01-2017 27-01-2017 27-01-2017 03:30 PM Active View
82. Dump cutting for construction of New OCF at Munsar Mine(GM(M)-III/CONT/DUMP/MUN/16-17/44) 03-01-2017 10-01-2017 10-01-2017 10-01-2017 03:30 PM Active View
83. Collection and stacking of Mn ore through Vibrating screen at Munsar Mine(GM(M)-III/CONT/VBS/MUN/16-17/45) 03-01-2017 10-01-2017 10-01-2017 10-01-2017 03:30 PM Active View
84. Drilling of Borehole with pump and pipe line at Gudma camp Ukwa Mine(A andSr DyGM(M)/Civil/UM/16-17/2803) 03-01-2017 17-01-2017 17-01-2017 17-01-2017 04:30 PM Active View
85. Loading and unloading of explosives for blasting at Tirodi Mine.(Gr-II/GM(M)/CONT/EXP/56/TRD/2016-17/43) 31-12-2016 10-01-2017 10-01-2017 10-01-2017 03:30 PM Active View
86. Cleaning of surplus ROM of Pit No. 5 at Sitapatore and Sukli Mine(Gr-II/GM(M)/CONT/CL-ROM/58/SITA/2016-17/44) 31-12-2016 10-01-2017 10-01-2017 10-01-2017 03:30 PM Active View
87. Picking and collection of material from contaminated Low grade ROM at Dongri Buzurg Mine(GR.-II/GM(M)/CONT/CL-ROM/57/DB/2016-17/46) 31-12-2016 10-01-2017 10-01-2017 10-01-2017 03:30 PM Active View
88. Picking and collection of material from waste dumps at Sitapatore mine(GR.-II/GM(M)/CONT/R-DUMP/59/SITA/2016-17/45) 30-12-2016 10-01-2017 10-01-2017 10-01-2017 03:30 PM Active View
89. Hiring of Hydrologist and structural consultant services for water supply scheme at Gumgaon Mine(CIVIL/HO/16-17/GUM/73 DT. 28/12/2016) 29-12-2016 17-01-2017 17-01-2017 17-01-2017 03:30 PM Active View
90. Renovation of existing old Temples near Main Entrance Gate at MOIL Bhawan and East Court, MOIL, Nagpur.(Civil /HO/16-17 /HO/70 Dated - 27/12/2016) 28-12-2016 04-01-2017 04-01-2017 04-01-2017 03:30 PM Active View
91. Widening of existing approach Tar Road, Construction of entrance display board including implementation of mechanized automated gate at Main Security Check Post at Balaghat Mine.(Civil /HO/16-17 /BGT/72 Dated - 27/12/2016) 28-12-2016 12-01-2017 12-01-2017 12-01-2017 03:30 PM Active View
92. Construction of toilets at various places in Mine area at Balaghat Mine(Civil /HO/16-17 /BGT/71 Dated - 27/12/2016) 28-12-2016 12-01-2017 12-01-2017 12-01-2017 03:30 PM Active View
93. MAINTAINANCE OF MINE MANAGER BUNGLOW ADMINISTRATIVE BUILDING AND GARDEN SITAPATORE MINE(S-S/CIVIL/HO/2016-17 DATE 18/12/2016) 23-12-2016 31-12-2016 31-12-2016 31-12-2016 04:00 PM Active View
94. Unloading of raw materials at Ferro Manganese Plant Balaghat Mine(BGT/FMP/TE/2016-17/806 Date 22.12.2016) 23-12-2016 03-01-2017 03-01-2017 03-01-2017 04:30 PM Active View
95. Cleaning of surplus underground ROM at Beldongri Mine(GM(M)-III/CONT/46/ROM/BEL/2016-17/43) 23-12-2016 30-12-2016 30-12-2016 30-12-2016 03:30 PM Active View
96. Construction of retaining wall along the road side from 100 level to mine canteen at Chikla mine(Civil /HO/16-17 /CH/69 Dated - 23/12/2016) 23-12-2016 04-01-2017 04-01-2017 04-01-2017 03:30 PM Active View
97. Maintenance of existing fire protection system for MOIL Bhawan Nagpur(Civil /HO/16-17 /HO/68 Dated - 23/12/2016) 23-12-2016 04-01-2017 04-01-2017 04-01-2017 03:30 PM Active View
98. Laying of WBM road from old B type to rest house at Gumgaon Mine(CIVIL/16-17/GUM/3243 DATE 12.12.2016) 22-12-2016 28-12-2016 28-12-2016 28-12-2016 04:30 PM Active View
99. Picking and collection of Ferro grade ore from dumps at Munsar Mine(GM(M)-III/CONT/44/DUMP/MUN/2016-17/42) 22-12-2016 29-12-2016 29-12-2016 29-12-2016 03:30 PM Active View
100. Preperation of kaccha road inside the Neeri plantation area at Gumgaon Mine(CIVIL/16-17/GUM/3295 DATE 21.12.2016) 22-12-2016 30-12-2016 30-12-2016 30-12-2016 04:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.