Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. NEW FLAT BOTTOM RAILWAY RAILS, 90 LBS 45 KG MTRS 31-05-2013 08-07-2013 09-07-2013 09-07-2013 3.30 PM Active View
2. PROVIDING AND APPLYING DISTEMPERING IN WEST COURT HOUSE 30-05-2013 06-06-2013 07-06-2013 07-06-2013 3.00 PM Active View
3. PURCHASE OF SPARES FOR HYDRAULIC FILTER PRESS 30-05-2013 20-06-2013 21-06-2013 21-06-2013 3.30 PM Active View
4. PURCHASE OF OLDHAM 102 TYPE MAKE CAP LAMP ETC 29-05-2013 13-06-2013 14-06-2013 14-06-2013 3.00 PM Active View
5. PURCHASE OF SEAL KIT FOR HYDRAULIC CYLINDER 28-05-2013 16-06-2013 17-06-2013 17-06-2013 3.00 PM Active View
6. Recovery of LGHS Lumpy Ore from North dump at Tirodi Mine 27-05-2013 05-06-2013 05-06-2013 05-06-2013 3.00 pm Active View
7. REMOVAL OF WASTE DUMP AND HANDLING, TIRODI MINE 27-05-2013 05-06-2013 05-06-2013 05-06-2013 3.00 PM Active View
8. PURCHASE OF PEARL COKE 27-05-2013 27-06-2013 04-07-2013 04-07-2013 3:30PM Active View
9. PURCHASE OF MULTIFILAMENT FILTER CLOTH 24-05-2013 13-06-2013 14-06-2013 14-06-2013 3:30PM Active View
10. Providing and Planting 4000 No. Tree Plantation in MSRPF compus at Hingna Nagpur. 23-05-2013 29-05-2013 30-05-2013 30-05-2013 3:30PM Active View
11. HUTCH DRAIN CLEANING OF JIG SECTION OF OCF AT BALAGHAT MINE 23-05-2013 31-05-2013 31-05-2013 31-05-2013 3:00PM Active View
12. Recovery of SM Grade ore from North Side of Viraswami dump at Tirodi Mine. 22-05-2013 31-05-2013 31-05-2013 31-05-2013 3:00PM Active View
13. Breaking, sizing and sorting of lumpy ore, S. M. Gr. 25 per Mn MSL-447 at Munsar Mine 21-05-2013 23-05-2013 24-05-2013 24-05-2013 4:30 PM Active View
14. Screening, picking, collection and stacking of 25 per Mn small ore MSL-498 through trommel at Munsar Mine from Pandadia Dump. 21-05-2013 23-05-2013 24-05-2013 24-05-2013 4:30PM Active View
15. Pushing and unloading of ROM and rock tubs in underground and on surface at Gumgaon Mine 20-05-2013 27-05-2013 28-05-2013 28-05-2013 3:00PM Active View
16. Purchase of Cement 43 Grade OPC Equivalent PPC conforming to IS specifications with latest amendment 20-05-2013 20-06-2013 27-06-2013 27-06-2013 3:30PM Active View
17. Transportation of sand from Kalaphata Ghat of MOIL situated on Pench river at Kandri Mine 17-05-2013 23-05-2013 24-05-2013 24-05-2013 3:00PM Active View
18. Construction of Sump near Guest House, East Court, MOIL, Nagpur 17-05-2013 24-05-2013 27-05-2013 27-05-2013 3:30PM Active View
19. PURCHASE OF MEASURING POCKET AND LAUNDER ASSEMBLY, 2 SETS. 17-05-2013 27-06-2013 28-06-2013 28-06-2013 3:30PM Active View
20. Picking and collection of UK-4445 and UKL-448 from Hanging wall dump from Ch.6800 to Ch.8600 at Ukwa Mine 16-05-2013 22-05-2013 22-05-2013 22-05-2013 3:00PM Active View
21. Cleaning of surplus ROM of OC development to recover Ferro grade and LGHS ore at Gudma Section of Ukwa Mine 16-05-2013 24-05-2013 24-05-2013 24-05-2013 3:00PM Active View
22. Underground development at 70 ft L and 170 ft L at Munsar Mine 16-05-2013 14-06-2013 17-06-2013 17-06-2013 3:00PM Active View
23. Transportation of sand from kanhan River to Sand stowing plant at Gumgaon Mine 15-05-2013 21-05-2013 22-05-2013 22-05-2013 3:00 PM Active View
24. Painting and allied works on third floor MOIL Bhawan at Nagpur 15-05-2013 27-05-2013 28-05-2013 28-05-2013 3:30PM Active View
25. Construction of 02 sets Toilet block near BDC and Workshop at Kandri Mine. 14-05-2013 27-05-2013 28-05-2013 28-05-2013 3:30pm Active View
26. Construction of shed near Pit office of Vertical shaft at Kandri Mine. 14-05-2013 27-05-2013 28-05-2013 28-05-2013 3:30pm Active View
27. Construction of 02 Nos Vehicle shed near work shop at Kandri Mine. 14-05-2013 27-05-2013 28-05-2013 28-05-2013 3:30pm Active View
28. Construction of drain septic tank, soak pits, chambers at Kaichi camps at Munsar Mine. 14-05-2013 27-05-2013 28-05-2013 28-05-2013 3:30pm Active View
29. Hiring of MIn 1000 KVA, 415V, DG SET for Balaghat Mine 13-05-2013 30-05-2013 30-05-2013 30-05-2013 3:00PM Active View
30. Collection of Mn fines from different sorting areas at Munsar Mine 11-05-2013 16-05-2013 17-05-2013 17-05-2013 4:00PM Active View
31. Water proofing treatment to RCC Roof slab of vehical garage Bungalow No. 1 MOIL Nagpur 10-05-2013 22-05-2013 23-05-2013 23-05-2013 3:30PM Active View
32. Providing and constraction of water drain for the quarters near Hospital Upper camp Chikla Mine. 10-05-2013 22-05-2013 23-05-2013 23-05-2013 3:30PM Active View
33. Providing New gate along with Name Board for Z.P. Girls School Katol Road Nagpur, Under MOIL CSR 09-05-2013 18-05-2013 20-05-2013 20-05-2013 3:30PM Active View
34. Water proofing treatment by Dr.Fixit torch shield roll over Manglore tiled roof atTirodi Mine 09-05-2013 22-05-2013 23-05-2013 23-05-2013 3:30PM Active View
35. Drilling of 2 Nos. Borewells at Tirodi Mine 09-05-2013 22-05-2013 23-05-2013 23-05-2013 3:30PM Active View
36. PURCHASE OF SULPHURIC ACID 09-05-2013 30-05-2013 31-05-2013 31-05-2013 3:30PM Active View
37. Cleaning of Surplus ROM at Sitapatore and Sukli Mine 08-05-2013 17-05-2013 17-05-2013 17-05-2013 3:00PM Active View
38. Recovery of 25 percent SM Grade lumpy and small ore from Jhiriya dump by off the pit working at Dongri Buzurg Mine 08-05-2013 17-05-2013 17-05-2013 17-05-2013 3:00PM Active View
39. PURCHASE OF CHAIN PULLEY BLOCK ASSEMBLY, 11 NOS. CAP. 3 TONNES, 4 NOS. AND CAP. 5 TONNES, 7 NOS. 06-05-2013 02-06-2013 03-06-2013 03-06-2013 3:30PM Active View
40. Removal of old waste rock and handling the same by mech. means at Munsar Mine 03-05-2013 09-05-2013 10-05-2013 10-05-2013 3:00 PM Active View
41. Loading and Unloading steel section, cement bags and other materials with stacking at Balaghat Mine 02-05-2013 10-05-2013 10-05-2013 10-05-2013 3:00PM Active View
42. PURCHASE OF 1.10 KW UNBALANCE VIBRATOR MOTOR, MAKE ELEKTROMAG JOEST VIBRATION PVT. LTD., 2 NOS. 02-05-2013 30-05-2013 31-05-2013 31-05-2013 3:30PM Active View
43. PURCHASE OF 3.3 KV, SOFT STARTER PANEL FCMA TECHNOLOGY BASED SUITABLE FOR OPERATION OF 422 HP CENTRIFUGAL WATER PUMP SET, 1 NO. 02-05-2013 30-05-2013 31-05-2013 31-05-2013 3:30PM Active View
44. CORRIGENDUM - PURCHASE OF 3.3 KV SOFT STARTER PANEL ETC 02-05-2013 16-06-2013 17-06-2013 17-06-2013 3.30 PM Active View
45. PURCHASE OF RUBBER TUB BUFFER. 01-05-2013 21-05-2013 22-05-2013 22-05-2013 3:30PM Active View
46. Geo Technical Investigation works for proposed 2nd Shaft at Gumgaon, Munsar, Chikla Ukwa Mine 29-04-2013 07-05-2013 08-05-2013 08-05-2013 3:30PM Active View
47. Reduction of Manganese ore on conversion basis at EMD Plant, Dongri Buzurg Mine 29-04-2013 27-05-2013 27-05-2013 27-05-2013 3:30PM Active View
48. Equipping Platform and Ladders for providing manway at Production Shaft at Balaghat Mine. 27-04-2013 27-05-2013 27-05-2013 27-05-2013 3:30PM Active View
49. PURCHASE OF SAFETY HELMETS ISI MARK AND DGMS APPROVED. 26-04-2013 16-05-2013 17-05-2013 17-05-2013 3:30PM Active View
50. Drilling of Borwells at Chikla Mine 25-04-2013 29-04-2013 30-04-2013 30-04-2013 3:30PM Active View
51. Construction of Nagar Bhawan Community hall at Village Khapa Tah- Saoner Distt- Nagpur. Under MOIL CSR 25-04-2013 13-05-2013 15-05-2013 15-05-2013 3:30PM Active View
52. PURCHASE OF SAFETY CANVAS BOOTS DUCKBACK BRAND WITH ISI MARK AND DGMS APPROVED. 25-04-2013 16-05-2013 17-05-2013 17-05-2013 3:30PM Active View
53. Recovery of LGHS lumpy ore from North Magazine dump at Tirodi Mine 23-04-2013 03-05-2013 03-05-2013 03-05-2013 3:00PM Active View
54. FRVE HEADER BAR FOR ANODES, 231 NOS. AND FRVE HEADER BAR FOR CATHODES WITH WOODEN WEDGE, 238 NOS. 23-04-2013 28-05-2013 29-05-2013 29-05-2013 3:30PM Active View
55. Picking and collection of UK-4445 and UKL-448 22-04-2013 02-05-2013 02-05-2013 02-05-2013 3:00 PM Active View
56. Recovery of BGL-462 20-04-2013 20-05-2013 21-05-2013 21-05-2013 3:00PM Active View
57. PURCHASE OF COTTON HAND GLOVES 18-04-2013 07-05-2013 08-05-2013 08-05-2013 3:30PM Active View
58. PURCHASE OF BEML MAKE ENGINE FOR BEML MAKE BE-700 HYDRAULIC EXCAVATOR, 1 NO. 16-04-2013 07-05-2013 08-05-2013 08-05-2013 3:30 PM Active View
59. Laying of Pipe line for water supply scheme from Awalajari to Suraksha Mandir via. Shankar tekri at Balaghat Mine. 16-04-2013 25-04-2013 26-04-2013 26-04-2013 3:30PM Active View
60. PURCHASE OF CLT 754 TRANSMISSION ASSEMBLY WITHOUT PTO FOR BEML MAKE BH35-2 DUMPER, 1 NO. 16-04-2013 23-05-2013 24-05-2013 24-05-2013 3:30PM Active View
61. Picking and collection of UK-4445 and UKL-448 15-04-2013 17-05-2013 17-04-2013 17-04-2013 3:00 Active View
62. Picking and Collection of UKL-448 from the FW Dump at Ch. 6800 at Ukwa Mine 15-04-2013 17-04-2013 17-04-2013 17-04-2013 3:00pm Active View
63. Transportation of sand at Munsar, Kandri and Beldogri Mine 15-04-2013 14-05-2013 15-05-2013 15-05-2013 3:00 PM Active View
64. PURCHASE OF MULTI FUNCTION PRINTER, 8 NOS. AND COLOR LASER PRINTER, 1 NO. 15-04-2013 09-05-2013 10-05-2013 10-05-2013 3:30 pm Active View
65. PURCHASE OF LINE MATRIX PRINTERS, 5 NOS. 15-04-2013 09-05-2013 10-05-2013 10-05-2013 3:30pm Active View
66. Construction of Toilet at Ch-10800, Ch-11600. Magazine and Security check post at Ukwa Mine 12-04-2013 25-04-2013 26-04-2013 26-04-2013 3:30PM Active View
67. PURCHASE OF CUMMINS MAKE ENGINE SUITABLE FOR BH35 2, DUMPER BEML MAKE, 1 NO. 12-04-2013 05-05-2013 06-05-2013 06-05-2013 3:30PM Active View
68. 80 V 443 AH Lead Acid Traction Batteries - 19 Sets - Only through e-procurement 12-04-2013 23-05-2013 24-05-2013 24-05-2013 3:30PM Active View
69. Picking and Collection of ore from dump,reject,dilute ROM at Munsar Mine 08-04-2013 15-04-2013 16-04-2013 16-04-2013 3:00 PM Active View
70. Designing and printing of Annual Report s Deluxe Version in English, Hindi and Marathi , Shareholder version in English, translation of text from English to Hindi and Marathi and handling charges 06-04-2013 26-04-2013 26-04-2013 01-05-2013 12:00PM Active View
71. Construction of Boundary wall around Mine Magazine at Munsar Mine. 05-04-2013 15-04-2013 16-04-2013 16-04-2013 3:30 PM Active View
72. Exploratory core drilling of NQ size 47mm. core Diameter. at Nandapuri of MOIL Ltd. 05-04-2013 20-04-2013 20-04-2013 20-04-2013 3:00PM Active View
73. PURCHASE TERMINAL CONNECTOR 05-04-2013 30-04-2013 01-05-2013 01-05-2013 3:30 PM Active View
74. Picking and collection of ore from dumps, Rejects, Diluated rom at Gumgaon Mine 04-04-2013 04-05-2013 06-05-2013 06-05-2013 3:00 PM Active View
75. Handling of Boulders and Cleaning of grizzly at Bunker of IMB plant at Dongri Buzurg Mine 03-04-2013 12-04-2013 12-04-2013 12-04-2013 3:00 PM Active View
76. Landscaping and designing and making mural for developing and beautification of Ambazari Hill Top Nagpur Under CSR 02-04-2013 09-04-2013 10-04-2013 10-04-2013 3:30 PM Active View
77. PURCHASE OF SAFETY RUBBER ANKLE BOOTS FOR MINERS. 01-04-2013 21-04-2013 22-04-2013 22-04-2013 3:30PM Active View
78. PURCHASE OF SAFETY GUMBOOTS RUBBER and PVC 01-04-2013 21-04-2013 22-04-2013 22-04-2013 3:30PM Active View
79. Construction of drain septic tank, soak pits, chambers at Kaichi camps at Munsar Mine. 30-03-2013 09-04-2013 10-04-2013 10-04-2013 3:30PM Active View
80. TRANSPORTATION OF COAL 28-03-2013 28-04-2013 29-04-2013 29-04-2013 3:30PM Active View
81. PURCHASE OF ELECTRICAL MEASURING INSTRUMENTS. 28-03-2013 16-04-2013 17-04-2013 17-04-2013 3:30PM Active View
82. Construction of Administrative Building at Munsar Mine and Gumgaon Mine. 28-03-2013 16-04-2013 18-04-2013 18-04-2013 3:30PM Active View
83. PURCHASE OF SIEMENS MAKE 850 AMPS D.C. DRIVE MODULE FOR DOUBLE DRUM CAGE WINDER, 1 NO. 26-03-2013 30-04-2013 01-05-2013 01-05-2013 3:30pm Active View
84. Construction of New Workshop Building near 6th level at Balaghat Mine 26-03-2013 16-04-2013 18-04-2013 18-04-2013 3:30pm Active View
85. PURCHASE OF KIRLOSKAR MAKE 10 HP, 80 VOLTS, D.C. TRACTION MOTOR FOR 4 T BATTERY LOCOMOTIVES, 4 NOS. 26-03-2013 25-04-2013 26-04-2013 26-04-2013 3:30PM Active View
86. PURCHASE OF BENN MAKE 10 HP, 80 VOLTS, D.C. TRACTION MOTOR FOR 4 T BATTERY LOCOMOTIVES, 6 NOS. 26-03-2013 23-05-2013 24-05-2013 24-05-2013 3:30PM Active View
87. PURCHASE OF 188 KW 250 HP 1500 RPM D.C. MOTOR FOR DOUBLE DRUM CAGE WINDER, 1 NO. 26-03-2013 28-05-2013 29-05-2013 29-05-2013 3:30pm Active View
88. Corrigendum - PURCHASE OF 188 KW 250 HP 1500 RPM D.C. MOTOR FOR DOUBLE DRUM CAGE WINDER, 1 NO. 26-03-2013 28-05-2013 14-06-2013 14-06-2013 3:30pm Active View
89. Underground Development work at -270 feet L at Chikla Mine 25-03-2013 26-03-2013 26-03-2013 26-03-2013 3:30PM Active View
90. TRANSPORTATION OF COAL 22-03-2013 21-04-2013 22-04-2013 22-04-2013 3:30PM Active View
91. Renovation work at Gymnasium Hall Police line Balaghat Under MOIL CSR 21-03-2013 04-04-2013 05-04-2013 05-04-2013 3:30PM Active View
92. PURCHASE OF LCD PROJECTOR, MAKE-PANASONIC, MODEL- PT-LB1, 1 NO. 20-03-2013 04-04-2013 05-04-2013 05-04-2013 3:30PM Active View
93. SUPPLY OF BLACK GITTI FOR UG CONCRETING WORK AT UKWA MINE 16-03-2013 25-03-2013 25-03-2013 25-03-2013 3:00PM Active View
94. PURCHASE OF LABORATORY CHEMICALS 15-03-2013 31-03-2013 01-04-2013 01-04-2013 3:30PM Active View
95. PURCHASE OF RIDGID MAKE HEAVY DUTY STRAIGHT PIPE WRENCHES. 15-03-2013 04-04-2013 05-04-2013 05-04-2013 3:30PM Active View
96. PURCHASE OF ELECTRIC EXHAUST FAN 450 MM SWEEP IN METAL BODY WALL MOUNTING TYPE, 50 NOS 14-03-2013 04-04-2013 05-04-2013 05-04-2013 3:30PM Active View
97. PURCHASE OF ISI APPROVED AND ISI MARKED 5 C x 25 SQ.MM. FLEXIBLE TRAILING COPPER CONDUCTOR CABLE OF 1100 VOLTS GRADE 14-03-2013 04-04-2013 05-04-2013 05-04-2013 3:30PM Active View
98. PURCHASE OF ELECTRIC CEILING FAN 1200 MM SWEEP, 325 NOS. 14-03-2013 07-04-2013 08-04-2013 08-04-2013 3:30PM Active View
99. PURCHASE OF PNEUMATIC ROCK DRILL MACHINES, 39 NOS. AND PNEUMATIC PUSHER LEGS, 59 NOS. 11-03-2013 02-04-2013 03-04-2013 03-04-2013 3:30PM Active View
100. PURCHASE OF PNEUMATIC STOPPER MACHINE WITH TELESCOPIC AIR LEG, 17 NOS. 11-03-2013 04-04-2013 05-04-2013 05-04-2013 3:30PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.