Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. PURCHASE OF SPARES FOR KIRLOSKAR PUMP (PUR/MOIL/C-11/21/E-51/735-M) 10-07-2013 30-07-2013 30-07-2013 31-07-2013 3:30pm Active View
2. Purchase of Wheel and Axle Assembly of Mine Tub for various Mines -3 Items (PUR/MOIL/C-12/14/WE-14) 10-07-2013 21-08-2013 22-08-2013 22-08-2013 3:30pm Active View
3. Compressor 1000 CFM with VFD, 2 Nos. (Only Through e-procurement) (WE-18 DT.04.07.2013) 10-07-2013 20-08-2013 20-08-2013 20-08-2013 3:30PM Active View
4. WEBSITE SINGLE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR ANGLE GRINDER (PUR/MOIL/C-5/57/E-53/742-M) 09-07-2013 25-07-2013 26-07-2013 26-07-2013 3:30PM Active View
5. PURCHASE OF DOLOMITE (PUR/MOIL/C-11/113/WE-26) 09-07-2013 08-08-2013 19-08-2013 19-08-2013 3:30PM Active View
6. School Bus, 4 Nos. (Only Through e-procurement) (WE-2 DT.04/07/2013) 09-07-2013 13-08-2013 13-08-2013 13-08-2013 3:30PM Active View
7. PURCHASE OF SPARES FOR HIND RECTIFIER (PUR/MOIL/C-11/35/E-45/725-M) 08-07-2013 28-07-2013 29-07-2013 29-07-2013 3:30PM Active View
8. PURCHASE OF HONEYWELL DIGITAL TYPE MULTI GAS DETECTOR DGMS APPROVED 8 Nos. (PUR/MOIL/C-1/186/E-47/696-M ) 08-07-2013 28-07-2013 29-07-2013 29-07-2013 3:30PM Active View
9. Supply of Black Gitti at Gumgaon Mine (GM(M)-III/CONT/05/GITTI/GUM/2013-14/15) 06-07-2013 14-07-2013 15-07-2013 15-07-2013 3:00 PM Active View
10. PICKING AND COLLECTION OF UKL-448 FROM F/W DUMPS AT CH.8600 AT UKWA MINE (Gr.-I/GM(S AND E)/CONT/R-DUMP/22/UK/13-14/13) 06-07-2013 15-07-2013 15-07-2013 15-07-2013 3:00PM Active View
11. WEBSITE SINGLE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR BATTERY OPERATED VENTRA LOCOMOTIVES (PUR/MOIL/C-5/58/E-48/707-M) 06-07-2013 23-07-2013 24-07-2013 24-07-2013 3:30PM Active View
12. WEBSITE SINGLE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR BATTERY OPERATED VENTRA LOCOMOTIVES (PUR/MOIL/C-5/58/E-48/707-M) 06-07-2013 23-07-2013 24-07-2013 24-07-2013 3:30PM Active View
13. PURCHASE OF ELECTRONIC TYRE INFLATOR WITH A BUILT-IN COMPRESSOR, 5 NOS. (PUR/MOIL/C-4/296/E-49/710-M) 06-07-2013 28-07-2013 29-07-2013 29-07-2013 3:30PM Active View
14. Tilting Tubs, 250 Nos. (Only Through e-procurement) (WE-3 DT.26/06/2013) 04-07-2013 30-07-2013 30-07-2013 30-07-2013 3:30PM Active View
15. Cable Bolting Machines, 5 Nos. (Only Through e-procurement) (WE-9 DT.26/06/2013) 04-07-2013 31-07-2013 31-07-2013 31-07-2013 3:30pm Active View
16. Portable Screw Compressor (450 CFM), 2 Nos. (Only through e-procurement) (WE-17 DT.27/06/2013) 04-07-2013 02-08-2013 02-08-2013 02-08-2013 3:30PM Active View
17. Annual Repairs to Camp Quarters at Ukwa Mine. (Civil/HO/13-14/UK/36) 02-07-2013 10-07-2013 11-07-2013 11-07-2013 3:30PM Active View
18. Plantation program of planting 5000 no.of plants at Kandri mines of MOIL Limited (GM(SandE)/SD-affore./13-14/174) 02-07-2013 10-07-2013 10-07-2013 10-07-2013 3:00PM Active View
19. Plantation program of planting 6000 no.of plants at Gumgaon mines of MOIL Limited (GM(SandE)/SD-affore./13-14/175) 02-07-2013 10-07-2013 10-07-2013 10-07-2013 3:00PM Active View
20. Oil and Lubricants (Only Through e-procurement) (WE-30 DT.28/06/2013 ) 02-07-2013 24-07-2013 24-07-2013 24-07-2013 3:30PM Active View
21. Oil and Lubricants (Only Through e-procurement) (WE-30 DT.28/06/2013 ) 02-07-2013 24-07-2013 24-07-2013 24-07-2013 3:30PM Active View
22. CONVERSION OF TATA 410/31 BUS IN TO MOBILE EYE CARE UNIT. (DGM(MECH)/NIT/2013-14/245) 02-07-2013 17-07-2013 17-07-2013 17-07-2013 3:00PM Active View
23. PURCHASE OF SPARES FOR AIRLINE LUBRICATOR ASSY. (PUR/MOIL/C-11/128/E-43/655-M) 01-07-2013 21-07-2013 22-07-2013 22-07-2013 3:30PM Active View
24. PURCHASE OF SPARES FOR LUBRICATION SYSTEM JIG VALVES (PUR/MOIL/C-11/133/E-44/658-M) 01-07-2013 21-07-2013 22-07-2013 22-07-2013 3:30PM Active View
25. Picking and sorting of SM grade LGHS small ore from dump through off the pit working at Kandri Mine (DGM(M)/KAN/Mines/13-14/40) 29-06-2013 06-07-2013 06-07-2013 06-07-2013 4:30PM Active View
26. Designing, Engineering, Supplying, Installation, Commissioning and Testing of 2x1000KVA, 11KV/433V and1x1000KVA,11KV/3.3KV Composite Indoor Substation for Vertical Shaft Project Of Munsar Mine. (DGM(E)/6/ MAN/13-14/ 85) 29-06-2013 23-07-2013 24-07-2013 24-07-2013 3:30PM Active View
27. Designing, Engineering, Supplying, Installation, Commissioning and Testing of 2x1000KVA, 11KV/433V and1x1000KVA,11KV/3.3KV Composite Indoor Substation for Vertical Shaft Project Of Munsar Mine. (DGM(E)/6/ MAN/13-14/ 85) 29-06-2013 23-07-2013 24-07-2013 24-07-2013 3:30PM Active View
28. Water proofing treatment to A type, B type and C type quartes at Chikla Mine. (Civil/HO/13-14/CH/34) 28-06-2013 08-07-2013 09-07-2013 09-07-2013 3:30PM Active View
29. Tippers 9 Nos. (Only Through e-procurement) (WE-1 DT.26/06/2013) 28-06-2013 24-07-2013 24-07-2013 24-07-2013 3:30PM Active View
30. Development Works at Rabindranath Tagore School ( R.N.T.School ) Balaghat,Under MOIL C.S.R. (Civil/HO/13-14/BGT/CSR/35) 28-06-2013 10-07-2013 11-07-2013 11-07-2013 3:30PM Active View
31. Tippers 9 Nos. (Only Through e-procurement) (WE-1 DT.26/06/2013) 28-06-2013 24-07-2013 24-07-2013 24-07-2013 3:30PM Active View
32. Hydraulic Excavator 1 No. (Only Through e-procurement) (WE-23 DT.26/06/2013) 28-06-2013 23-07-2013 23-07-2013 23-07-2013 3:30PM Active View
33. PURCHASE OF M. S. ELECTRODES - 4 ITEMS (PUR/MOIL/C-3/22/E-42/641-M) 27-06-2013 18-07-2013 19-07-2013 19-07-2013 3:30PM Active View
34. PURCHASE OF SPARES/PARTS FOR SPIRAL CLASSIFIER (PUR/MOIL/C-11/135/E-41/633-M) 27-06-2013 16-07-2013 17-07-2013 17-07-2013 3:30PM Active View
35. PURCHASE OF SOLENOID VALVE AND SOLENOID COIL (PUR/MOIL/C-11/131/E-38/618-M) 26-06-2013 16-07-2013 17-07-2013 17-07-2013 3:30PM Active View
36. Construction of Dormitory for Drivers at Rest House Complex at Balaghat Mine. 25-06-2013 10-07-2013 11-07-2013 11-07-2013 3:30PM Active View
37. WEBSITE SINGLE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR 3T AND 4T BATTERY OPERATED LOCOMOTIVES (PUR/MOIL/C-5/44/E-37/537-M) 21-06-2013 04-07-2013 05-07-2013 05-07-2013 3:30PM Active View
38. Terrace Water proofing to Transit House, Annex Building of Guest House and Security Check Post at West Court premises,MOIL,Nagpur. 19-06-2013 24-06-2013 25-06-2013 25-06-2013 3:30PM Active View
39. Picking and collection of 3rd gr. dump lump, SM gr. LGHS and small ore from dump at Kandri Mine 19-06-2013 18-07-2013 19-07-2013 19-07-2013 3:00PM Active View
40. PURCHASE OF R.D. HOSES - 5 ITEMS 18-06-2013 07-07-2013 08-07-2013 08-07-2013 3:30PM Active View
41. Picking and collection of UK-4445 AND UKL-448 from Ch. 8600 to 9500 at Ukwa Mine 18-06-2013 28-06-2013 28-06-2013 28-06-2013 3:00PM Active View
42. WINZING BETWEEN CH.600 AND 700 AT CH. 9TH L AND 10TH L NORTH AT BALAGHAT MINE 18-06-2013 28-06-2013 28-06-2013 28-06-2013 3:00PM Active View
43. PURCHASE OF SHOT FIRING CABLE - 5550 MTRS 18-06-2013 23-07-2013 24-07-2013 24-07-2013 3:30PM Active View
44. Construction of approach road from state highway to Chargaon and Wahitola village.Under MOIL CSR 18-06-2013 09-07-2013 11-07-2013 11-07-2013 3:00PM Active View
45. PURCHASE OF SHOT FIRING CABLE - 5550 MTRS 18-06-2013 23-07-2013 24-07-2013 24-07-2013 3:30PM Active View
46. PURCHASE OF CEMENT CAPSULES 18-06-2013 09-07-2013 10-07-2013 10-07-2013 3:30PM Active View
47. LOADING OF MN. ORE INTO TRUCKS FOR DESPATCHES OF ORE AT UKWA MINE 17-06-2013 25-06-2013 25-06-2013 25-06-2013 3:00PM Active View
48. Construction of Community Centre at Tumsar Distt. Bhandara Under MOIL CSR. 17-06-2013 09-07-2013 11-07-2013 11-07-2013 3:30PM Active View
49. Recovery of SM grade BGL-462, Balaghat 15-06-2013 25-06-2013 25-06-2013 25-06-2013 3:00PM Active View
50. PURCHASE OF M.S.PIPES OF ASSORTED SIZES. 14-06-2013 04-07-2013 05-07-2013 05-07-2013 3:30PM Active View
51. Replacement of old A.C. Sheet roof with new profile UPVC Sheet roofing of Rajeev Gandhi Hall at Balaghat Mine. 14-06-2013 24-06-2013 25-06-2013 25-06-2013 3:30PM Active View
52. Recovery of LGHS ore from Magazine Dump by off the pit working at Dongri Buzurg Mine 14-06-2013 25-06-2013 25-06-2013 25-06-2013 3:00PM Active View
53. PURCHASE OF LEATHER SHOES PREFERABLY MILITARY PATTERN OR EQUIVALENT. 14-06-2013 04-07-2013 05-07-2013 05-07-2013 3:30PM Active View
54. PURCHASE OF LEATHER SHOES PREFERABLY MILITARY PATTERN OR EQUIVALENT. 14-06-2013 04-07-2013 05-07-2013 05-07-2013 3 Active View
55. PURCHASE OF PNEUMATICALLY OPERATED AIR WINCH CAPACITY - 1 TON, 8 NOS. 14-06-2013 11-07-2013 12-07-2013 12-07-2013 3:30PM Active View
56. PURCHASE OF ELECTRICALLY OPERATED SUBMERSIBLE EFFLUENT PUMP SETS, 3 NOS. 14-06-2013 11-07-2013 12-07-2013 12-07-2013 3:30PM Active View
57. PURCHASE OF TERMINAL CONNECTOR 14-06-2013 07-07-2013 08-07-2013 08-07-2013 3:30PM Active View
58. PURCHASE OF LEATHER SHOES PREFERABLY MILITARY PATTERN OR EQUIVALENT. (PUR/MOIL/C-1/185/E-36/531-M ) 14-06-2013 25-07-2013 26-07-2013 26-07-2013 3:30PM Active View
59. PURCHASE OF HMI SCREEN WITH POWER SUPPLY UNIT 13-06-2013 02-07-2013 03-07-2013 03-07-2013 3:30PM Active View
60. Picking and collection of SM gr. Mn ore MSL-478,437,447 and 498 from Pandadai and 270L at Munsar 12-06-2013 18-06-2013 19-06-2013 19-06-2013 3:00PM Active View
61. Picking and collection of SM gr.Mn ore MSL-478,437,447 and 498 from 135L and 270L East dump at Munsar Mine 12-06-2013 18-06-2013 19-06-2013 19-06-2013 3:00PM Active View
62. rendering technical assistance services as architectural consultant and Structural Design Consultancy for Construction of Residential Type A quarters at MOIL Nagpur 12-06-2013 25-06-2013 26-06-2013 26-06-2013 3:30PM Active View
63. Recovery of Ferro grade and LGHS lumpy ore from North Dump at Tirodi Mine 11-06-2013 20-06-2013 20-06-2013 20-06-2013 3:00PM Active View
64. Recovery of 25 percent Mn lumpy and small ore from contaminated low grade ROM at Dongri Buzurg Mine 11-06-2013 20-06-2013 20-06-2013 20-06-2013 3:00PM Active View
65. Recovery of 42-44 percent lumpy ore from contaminated ROM at Dongri Buzurg Mine. 11-06-2013 20-06-2013 20-06-2013 20-06-2013 3:30PM Active View
66. Recovery of Ferro grade and LGHS lumpy ore from North Dump at Tirodi Mine 11-06-2013 20-06-2013 20-06-2013 20-06-2013 3:00PM Active View
67. Recovery of 25 percent Mn lumpy and small ore from contaminated low grade ROM at Dongri Buzurg Mine 11-06-2013 20-06-2013 20-06-2013 20-06-2013 3:00PM Active View
68. Recovery of 42-44 percent lumpy ore from contaminated ROM at Dongri Buzurg Mine. 11-06-2013 20-06-2013 20-06-2013 20-06-2013 3:30PM Active View
69. Cleaning and excavation of drain from back side of boundary wall of MOIL Bhawan premises, H.O., Nagpur. 11-06-2013 17-06-2013 18-06-2013 18-06-2013 3:30PM Active View
70. Purchase of Tramline Accessories for various Mines 08 Items (PUR/MOIL/C-12/5/WE-15) 11-06-2013 07-08-2013 08-08-2013 08-08-2013 3:30PM Active View
71. Recovery of Ferro grade and LGHS lumpy ore from Jamrapani Area at Tirodi Mine 10-06-2013 18-06-2013 18-06-2013 18-06-2013 3:00PM Active View
72. Cleaning, collection and stacking of fines at Tirodi Mine 10-06-2013 18-06-2013 18-06-2013 18-06-2013 3:00PM Active View
73. Recovery of LGHS and SM grade ore from 320 Level South dump at Chikla Mine 10-06-2013 18-06-2013 18-06-2013 18-06-2013 3:00PM Active View
74. Recovery of LGHS and SM grade ore from 320 Level North dump at Chikla Mine 10-06-2013 18-06-2013 18-06-2013 18-06-2013 3:00PM Active View
75. Purchase of Tyres Tubes and Flaps and Solid Tyres 10-06-2013 25-07-2013 26-07-2013 26-07-2013 3:00PM Active View
76. Certification Audit of Sustainable Development Projects of MOIL Limited. 07-06-2013 14-06-2013 14-06-2013 14-06-2013 3:00pm Active View
77. Pushing and unloading of ROM and rock tubs in UG on surface at Gumgaon Mine 07-06-2013 12-06-2013 13-06-2013 13-06-2013 3:00PM Active View
78. Transportation of sand from Kanhan river to sand stowing plant at Gumgaon Mine 07-06-2013 12-06-2013 13-06-2013 13-06-2013 3:30PM Active View
79. Picking and sorting of 3rd gr dump lump, SM gr LGHS and small ore from dump at Kandri Mine 07-06-2013 12-06-2013 13-06-2013 13-06-2013 3:30PM Active View
80. Drilling of one No. borewell at Sitapotar Mine. 07-06-2013 19-06-2013 20-06-2013 20-06-2013 3:30PM Active View
81. Drilling of one No. borewell at Sitapotar Mine. 07-06-2013 19-06-2013 20-06-2013 20-06-2013 3:30PM Active View
82. PURCHASE OF HYDRAULIC HAND PALLET TRUCKS, 5 TON CAPACITY 3 NOS. AND 3 TON CAPACITY 2 NOS. 07-06-2013 04-07-2013 05-07-2013 05-07-2013 3:30 PM Active View
83. WEBSITE LIMITED TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF CROSS BIT, 57 MM DIA. SUITABLE FOR CABLE BOLTING MACHINE 07-06-2013 07-07-2013 08-07-2013 08-07-2013 3:30PM Active View
84. PURCHASE OF OFFICE FURNITURE AS PER ANNEXURE - A ENCLOSED 06-06-2013 20-06-2013 21-06-2013 21-06-2013 3:30PM Active View
85. TRANSPORTATION OF COAL 06-06-2013 06-07-2013 22-07-2013 22-07-2013 3:30PM Active View
86. Purchase of Vehicle and Inverter Batteries 05-06-2013 17-07-2013 18-07-2013 18-07-2013 3:30pm Active View
87. MONITORING THE ENV. PARAMETERS OF MAHARASHTRA AND M.P. 05-06-2013 14-06-2013 14-06-2013 14-06-2013 3:00PM Active View
88. Description Breaking of metal at FMP Balaght 05-06-2013 25-06-2013 25-06-2013 25-06-2013 3:30PM Active View
89. PURCHASE OF SS WIRE MESH PANELS 05-06-2013 25-06-2013 26-06-2013 26-06-2013 3:30PM Active View
90. PURCHASE OF ELECTRICALLY OPERATED AUXILIARY VENTILATION FANS, 17 NOS. 05-06-2013 30-06-2013 01-07-2013 01-07-2013 3:30PM Active View
91. PURCHASE OF MINE VENTILATION FAN WITH MOTOR AND STARTER, 1 NO. 05-06-2013 02-07-2013 03-07-2013 03-07-2013 3:30PM Active View
92. Construction of office room with verandah, toilet and Ammonium Nitrate room in magazine at Dongri Buzurg. Mine 04-06-2013 06-06-2013 07-06-2013 07-06-2013 3:30PM Active View
93. PURCHASE OF CARBON ELECTRODE PASTE 04-06-2013 04-07-2013 15-07-2013 15-07-2013 3.30 PM Active View
94. PURCHASE OF RUBBER TUB BUFFER. 03-06-2013 23-06-2013 24-06-2013 24-06-2013 3:30PM Active View
95. PURCHASE OF IRON ORE 03-06-2013 03-07-2013 11-07-2013 11-07-2013 3.30 PM Active View
96. PURCHASE OF SQUIRREL CAGE INDUCTION MOTOR WITH BRAKE ASSEMBLY 01-06-2013 20-06-2013 21-06-2013 21-06-2013 3:30 PM Active View
97. Trench cutting in ore stacks for sampling at Tirodi Mine 01-06-2013 11-06-2013 11-06-2013 11-06-2013 3:00PM Active View
98. Recovery of 4th grade small ore by washing and picking from East of D dump at Tirodi Mine 01-06-2013 11-06-2013 11-06-2013 11-06-2013 3:00PM Active View
99. Purchase of TCT Drill Rods 01-06-2013 10-07-2013 11-07-2013 11-07-2013 3:30PM Active View
100. PURCHASE OF HDPE PIPES, BENDS AND PIPE ENDS (PUR/MOIL/C-1/199/WE-13) 01-06-2013 29-07-2013 30-07-2013 30-07-2013 3.30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.