Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Extension of existing coal shed at EMD plant premises at Dongri Buzurg mine(DB/Civil/20-21/220 Date 01/06/2020) 11-06-2020 20-06-2020 20-06-2020 20-06-2020 04:30 PM Active View
2. Deployment of 02 Nos Sweepers for Miscellaneous cleaning works at Ukwa Mine(AGT/CIVIL/UK/LT/20-21/187) 11-06-2020 20-06-2020 20-06-2020 22-06-2020 04:30 PM Active View
3. Providing and fixing aluminium sliding windows at Mine Office at Dongri Buzurg Mine.(DB/Civil/20-21/381 Date 29/05/2020) 11-06-2020 19-06-2020 19-06-2020 19-06-2020 04:30 PM Active View
4. Replacement of old damaged steel doors with new steel doors at Dongri Buzurg Mine(DB/Civil/20-21/219 Date 01/06/2020) 11-06-2020 23-06-2020 23-06-2020 23-06-2020 04:30 PM Active View
5. ELECTRIC WINCH FOR PULLING OF TUB FROM ORE DISCHARGE CHUTE UPTO CAGES AT -330L UNDERGROUND AT MUNSAR MINE(ADGM (Mines)/Grp-III/2020-21/344) 09-06-2020 24-06-2020 24-06-2020 24-06-2020 03:30 PM Active View
6. Proposal for outsourcing manpower for daily electrical maintenance work at Tirodi Mine.(TRD/EL./20-21/7400004572/373 Dated 05.06.2020) 08-06-2020 30-06-2020 30-06-2020 30-06-2020 03:30 PM Active View
7. Engine Overhauling of L and T Loader 9020 Sr No AD0055 operating at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/235) 08-06-2020 16-06-2020 16-06-2020 16-06-2020 04:30 PM Active View
8. TENDER DOCUMENTS FOR PROVIDING SUPPLYING OF RESTRICTED NEUTRAL SYSTEM FOR 1000KVA AND 500KVA, 11KV/433V TRANSFORMERS OF MUNSAR MINE(ELECT/MUN/ADGM/20-21/334) 08-06-2020 17-06-2020 17-06-2020 17-06-2020 03:30 PM Active View
9. DRILLING OF BORE HOLE 110 MM DIAMETER FROM 8TH TO 11 LEVEL FOR LAYING OF ELECTRICAL POWER CABLE AT PRODUCTION SHAFT IN UNDERGROUND AT BALAGHAT MINE(AGENT/MECH/B-HOLE/20-21/199) 06-06-2020 17-06-2020 17-06-2020 17-06-2020 04:30 PM Active View
10. Grass thatching of Bunglow No. 01 (Mine Manager Bunglow) at Tirodi Mine.(TRD/CIVIL/20-21/361) 06-06-2020 10-06-2020 10-06-2020 11-06-2020 05:30 PM Active View
11. Proposal for errection of new L.T. Line at Sitapatore Mine.(TRD/EL./20-21/7400004314/374 Dated 05.06.20) 06-06-2020 27-06-2020 27-06-2020 27-06-2020 03:30 PM Active View
12. Purchase of FRP TRANSLUCENT ROOF SHEET-400 Nos(MOIL/20-21/ET-60 dt.05.06.2020) 05-06-2020 29-06-2020 29-06-2020 30-06-2020 03:30 PM Active View
13. Construction of foundation for Chimney for 1500 KVA DG Set at Second vertical Shaft at Chikla mine.(CH/Civil/2020-21/316 date 01.06.2020) 04-06-2020 13-06-2020 13-06-2020 13-06-2020 03:30 PM Active View
14. PURCHASE OF VIBRATING FEEDER COMPLETE WITH DRIVE, MAKE-ENESTEE ENGINEERING LTD., MODEL-E-VF-1016-001- 1 NO. FOR BALAGHAT MINE (M.P) (AS PER ANNEXURE A ENCLOSED)(PUR/MOIL/C-4/239/E-3/35-M DT.03/06/2020) 04-06-2020 24-06-2020 24-06-2020 24-06-2020 03:30 PM Active View
15. PURCHASE OF WHEEL AND EXCEL ASSEMBLY WITH GEARBOX COMPLETE WITHOUT MOTOR - 1 SET, MAKE- M/S OVIS EQUIPMENT PVT.LTD., HYDERABAD, MODEL- 4 TON BATTERY OPERATED LOCOMOTIVE (SR.NO.603 AND 582) OPERATING AT BALAGHAT MINE(M.P) (AS PER ANNEXURE A ENCLOSED)(PUR/MOIL/C-4/4/E-4/36-M DT.03/06/2020) 04-06-2020 24-06-2020 24-06-2020 24-06-2020 03:30 PM Active View
16. DRILLING OF BORE HOLE 110 MM DIAMETER FROM 8TH TO 11 LEVEL FOR LAYING OF ELECTRICAL POWER CABLE AT PRODUCTION SHAFT IN UNDERGROUND AT BALAGHAT MINE(AGENT/BGT/B-HOLE/20-21/188) 04-06-2020 15-06-2020 15-06-2020 15-06-2020 04:30 PM Active View
17. Providing and installation of Effluent Treatment Plant in work shop area at Chikla Mine.(CH/Civil/2020-21/211 date 16.05.2020) 03-06-2020 10-06-2020 10-06-2020 10-06-2020 03:30 PM Active View
18. purchase of Pneumatically Operated Double Diaphragm Pumps for Various Mines - 10 Nos. (2 Lots)(WE-13(ET-57) DT.01/06/2020) 02-06-2020 24-06-2020 24-06-2020 25-06-2020 03:30 PM Active View
19. Obtaining Final Forest Clearance from Ministry of Environment, Forest and Climate Change over an area of 150.586 Ha., 3.986 Ha. and 4.734 Ha. within Mining lease of Tirodi, Ukwa and Sitapatore respectively(MOIL/20-21/ET/27) 02-06-2020 01-07-2020 01-07-2020 01-07-2020 03:30 PM Active View
20. Supply of Medicines 235 items(PUR/MOIL/C-10/35/WE-06/ET/59) 02-06-2020 09-07-2020 09-07-2020 10-07-2020 03:30 PM Active View
21. PURCHASE OF MOTOROLA MAKE MOTOTRBO SLR 5300 REPEATER ALONG WITH ACCESSORIES FOR DONGRI BUZURG MINE(DB/ELECT/20-21/211) 01-06-2020 26-06-2020 26-06-2020 26-06-2020 04:30 PM Active View
22. TENDER DOCUMENTS FOR SUPPLYING OF DGMS APPROVED FLP GATE END BOX FOR LHD, WITH ALL ACCESSORIES MUNSAR MINE 1 NO(ELECT/MUN/ADGM/20-21/269) 01-06-2020 22-06-2020 22-06-2020 22-06-2020 03:30 PM Active View
23. Purchase of SULPHURIC ACID with Transportation-400 MT(MOIL/20-21/ET-58 dt.01.06.2020) 01-06-2020 22-06-2020 22-06-2020 23-06-2020 03:30 PM Active View
24. Purchase of Cement Injection Pump Sets for Various Mines - 15 Nos.(2 Lots) (Only Through e-procurement)(WE-12(ET-56) DT.01/06/2020) 01-06-2020 29-06-2020 29-06-2020 30-06-2020 03:30 PM Active View
25. Requirement of manpower for collection of canteen food items and serving it to mine employees at Chikla Mine(MOIL/20-21/ET/29) 30-05-2020 29-06-2020 29-06-2020 29-06-2020 03:30 PM Active View
26. Purchase of Handheld XRF Machine for Head office, Nagpur(M.S) 2 Nos. (1 Lot) (Only Through e-procurement)(WE-7(ET-55) DT.30/05/2020) 30-05-2020 22-06-2020 22-06-2020 23-06-2020 03:30 PM Active View
27. Request for Empanelment (RFE) For Empanelment of Consultant/ Transaction Advisor(MOIL/RFE/CTA/20-21) 28-05-2020 18-06-2020 18-06-2020 24-06-2020 11:30 AM Active View
28. Replacement of sheave wheel 1 No at Kandri Mine(A-III/KAN/20-21/228) 27-05-2020 13-06-2020 13-06-2020 15-06-2020 04:30 PM Active View
29. Exploratory core drilling in ML area of Lugma village, ThParaswada, DistBalaghat over an area of 48.974 Ha(MOIL/20-21/ET/28) 27-05-2020 26-06-2020 26-06-2020 26-06-2020 03:30 PM Active View
30. Repairing of approach road from PWD road to New satak Mine at Beldongri MINE(Civil/Bel/20-21/310 Date 21/05/2020) 26-05-2020 02-06-2020 02-06-2020 02-06-2020 04:30 PM Active View
31. Loading transportation and unloading of Manganese ore ROM at Beldongri Mine(Min/BEL/20-21/299 dATE 20.05.2020) 25-05-2020 28-05-2020 28-05-2020 28-05-2020 04:30 PM Active View
32. Digging screening and stacking of fines from various places at Beldongri Mine(Min/BEL/20-21/309 Date 21.05.2020) 25-05-2020 28-05-2020 28-05-2020 28-05-2020 04:30 PM Active View
33. Cleaning of drain sewer lines of camp colonies of Balaghat Mine(Civil/BGT/LT/2020-21/140) 25-05-2020 04-06-2020 04-06-2020 04-06-2020 04:30 PM Active View
34. Procurement of Electrical C class material for Balaghat Mine(BGT/ELECT/20-21/130) 23-05-2020 12-06-2020 12-06-2020 12-06-2020 04:30 PM Active View
35. Providing, supplying and installation of Neutral grounding resistance and monitoring relay on 11kV/3.3kV surface transformer at Balaghat Mine.(BGT/ELECT/20-21/131) 23-05-2020 16-06-2020 16-06-2020 16-06-2020 04:30 PM Active View
36. CONSTRUCTION OF PARTITION WALLS FOR NEW OCF AT MUNSAR MINE.(MUN/CIVIL/NIT/20-21/22 DT 23.05.2020) 23-05-2020 30-05-2020 30-05-2020 30-05-2020 04:30 PM Active View
37. Repairing of Bucket cylinder and Arm Cylinder of LT make CK300 3 Hyd Excavator of Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/167) 22-05-2020 09-06-2020 09-06-2020 09-06-2020 04:30 PM Active View
38. Fabrication of Steel Ore-Passes and Manways for Underground Mines i.e. Balaghat, Ukwa, Chikla, Beldongri, Munsar, Kandri and Gumgaon Mine(MOIL/20-21/ET/26) 22-05-2020 22-06-2020 22-06-2020 22-06-2020 03:30 PM Active View
39. Repairing and Rewinding of 2 Nos. 1000KVA, 33KV/11KV, Outdoor type Oil Cooled Power transformers of Main Electrical Substation at Ukwa Mine(MOIL/20-21/ET/24) 22-05-2020 22-06-2020 22-06-2020 22-06-2020 03:30 PM Active View
40. Supply, Installation and Commissioning of Elevators in The Residential Towers (Two Nos.) at the CMS Compound, MOIL Ltd., Nagpur - 2 Nos.(2 Lots) (Only Through e-procurement)(WE-10(ET-46) DT.22/05/2020) 22-05-2020 15-06-2020 15-06-2020 16-06-2020 03:30 PM Active View
41. Purchase of Instruments for Rock Mechanics Lab at Head office, Nagpur - 10 Items.(10 Lots) (Only Through e-procurement)(WE-9(ET-45) DT.22/05/2020) 22-05-2020 11-06-2020 11-06-2020 12-06-2020 03:30 PM Active View
42. Repairing of LHS Track Chain Assy of TATAHitachi zx 450 Hyd Exc No.1 at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/168) 21-05-2020 29-05-2020 29-05-2020 29-05-2020 04:30 PM Active View
43. Repairing of Bucket Assembly of TATAHitachi Zx450 Hyd Excavator No.1 at operating at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/169) 21-05-2020 29-05-2020 29-05-2020 29-05-2020 04:30 PM Active View
44. Construction of barricade wall around open pits Gudma Chhitalwar Kasturi Chainage 1700 to 3500 at Ukwa Mine(MOIL/20.21/ET/43) 21-05-2020 06-07-2020 06-07-2020 06-07-2020 03:30 PM Active View
45. Replacement of Buntons, Sollars, Platform, Ladder and Fencing of Jawahar Vertical Shaft at Chikla Mine(MOIL/20-21/ET/25) 20-05-2020 19-06-2020 19-06-2020 19-06-2020 03:30 PM Active View
46. Tender for providing 6 mbps 1 is to 1 Internet Leased Line (ILL) at Beldongri Mine(ADGM/GrpIII/SYS/NW/2020-21/213) 20-05-2020 29-05-2020 29-05-2020 29-05-2020 04:30 PM Active View
47. Limited Tender for Computer and peripherals (Printers, UPSs and LAN) Annual Maintenance Contract of Chikla AND Dongri Buzurg Mine(TE/CH/SYSTEM/AMC/2020-21/159) 19-05-2020 06-06-2020 06-06-2020 06-06-2020 04:30 PM Active View
48. Underground concreting work to establish crosscut for preparation of Chute and manways at Chikla Mine(MOIL/20-21/ET/38) 19-05-2020 19-06-2020 19-06-2020 19-06-2020 03:30 PM Active View
49. Loading of explosives from Magazine and unloading at different location of Tirodi mine(MOIL/20-21/ET/42) 19-05-2020 19-06-2020 19-06-2020 19-06-2020 03:30 PM Active View
50. Making of stemming material Mug Plug used for blasting at Ukwa Mine(MOIL/20-21/ET/40) 19-05-2020 19-06-2020 19-06-2020 19-05-2020 03:30 PM Active View
51. Filling and Spreading of waste rock generated through rock development in 300 L between Ch. 34 to Ch. 40 in Gumgaon Mine(MOIL/20-21/ET/37) 19-05-2020 18-06-2020 18-06-2020 18-06-2020 03:30 PM Active View
52. Hiring of machinery for sub grade mineral reject of UG ROM handling from Magazine area at Kandri Mine(MOIL/20-21/ET/35) 19-05-2020 18-06-2020 18-06-2020 18-06-2020 03:30 PM Active View
53. Transportation of bottom ash from Adani Power Plant, Tiroda to Ukwa Mine of M S MOIL Ltd. for stowing purpose(MOIL/19-20/ET/34) 19-05-2020 18-06-2020 18-06-2020 18-06-2020 03:30 PM Active View
54. Retiling and Reroofing of Camp Quarters as Monsoon Preparatory Works at Kandri Mine.(Kan/Civil/NIT/2020-21/219 Date 17.05.2020) 18-05-2020 23-05-2020 23-05-2020 23-05-2020 04:30 PM Active View
55. Cleaning of Storm Water Drain of Surface and Underground Sump at Kandri Mine.(Kan/Civil/NIT/2020-21/320 Date 17.05.2020) 18-05-2020 23-05-2020 23-05-2020 23-05-2020 04:30 PM Active View
56. Hiring of Consultant for Estimation Drawings including working drawings and structural design for centralized store building with storage sheds yards and peripheral boundary wall at Balaghat Mine.(Civil/BGT/T E/2020-21/340) 18-05-2020 01-06-2020 01-06-2020 01-06-2020 04:30 PM Active View
57. Hiring of structural Consultant services for Construction of foundation work for installation of new gear box and motor for Cage winder of Home shaft at Balaghat Mine(Civil/BGT/T E/2020-21/338) 18-05-2020 01-06-2020 01-06-2020 01-06-2020 04:30 PM Active View
58. WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR RE-TILLING ROOF REPAIR INCLUDING LAYING OF POLYTHENE COVER OF CAMP QUARTER AT CHIKLA MINE.(TE-CH/CIVIL/20-21/210) 18-05-2020 25-05-2020 25-05-2020 25-05-2020 03:30 PM Active View
59. WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR UNDERGROUND FILLING SPREADING AT -170 LEVEL AT CHIKLA MINE(TE-03 Dt.18052020) 18-05-2020 28-05-2020 28-05-2020 28-05-2020 04:30 PM Active View
60. Renovation of Production Shaft by replacing Buntons at Balaghat Mine(MOIL/20-21/ET/23) 18-05-2020 25-06-2020 25-06-2020 25-06-2020 03:30 PM Active View
61. Fencing of Electrical Switchyard beside existing Compressor House at Munsar Mine.(MUN/CIVIL/NIT/19-20/19 DT.16.05.2020) 16-05-2020 23-05-2020 23-05-2020 23-05-2020 04:30 PM Active View
62. Maintenance and Upkeeping of ETP at EMD Plant,Dongri Mine 2020(MOIL/EMD/CH/Jt.GM/20-21/134) 15-05-2020 26-05-2020 26-05-2020 26-05-2020 11:00 AM Active View
63. Removal of waste rock and handling the same by mechanized means in the F W benches between Ch. 20 to 50 at Dongri Buzurg Mine(MOIL/20-21/ET/30) 15-05-2020 15-06-2020 15-06-2020 15-06-2020 03:30 PM Active View
64. Vertical development at 1750 Level and 1650 Level at Ukwa Mine(MOIL/20-21/ET/32) 15-05-2020 15-06-2020 15-06-2020 15-06-2020 03:30 PM Active View
65. Vertical development at 1850 Level at Ukwa Mine(MOIL/20-21/ET/33) 15-05-2020 15-06-2020 15-06-2020 15-06-2020 03:30 PM Active View
66. Picking and Collection of Ferro Grade 34 percent Mn. Lump Ore KD-4543 and 30 percent Mn. Lump ore KDL-435 from sub grade mineral reject of underground ROM at Kandri Mine(MOIL/20-21/ET/39) 15-05-2020 22-05-2020 22-05-2020 22-05-2020 03:30 PM Active View
67. Removal of waste rock and handling the same by mechanized means in the F W benches between Ch. 20 to 50 at Dongri Buzurg Mine(MOIL/20-21/ET/30) 15-05-2020 02-07-2020 02-07-2020 02-07-2020 03:30 PM Active View
68. Vertical development at 1850 Level at Ukwa Mine(MOIL/20-21/ET/33) 15-05-2020 19-06-2020 19-06-2020 19-06-2020 03:30 PM Active View
69. REPAIRIRNG OF MATHER and PLATT AT 250HP CENTRIFUGAL PUMP NO 1 SR N 81237467/30/1 OPEARTING AT DONGRI BUZURG MINE(DB/MECH/Workshop/20-21/110) 12-05-2020 05-06-2020 05-06-2020 05-06-2020 04:30 PM Active View
70. Procurement of Drill Pipe 89 mm for Di500 Drill Machine at DongriBuzurg mine(PUR/DB/20-21/109) 12-05-2020 09-06-2020 09-06-2020 09-06-2020 04:30 PM Active View
71. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER(PUR/MOIL/C-5/30/E-02/38-M Dt. 11/05/2020) 11-05-2020 15-06-2020 15-06-2020 15-06-2020 03:30 PM Active View
72. Engaging Housekeeping Agency for cleaning of MOIL Bhawan, CMD Bungalow, CMS premises etc(MOIL/20-21/ET/22) 11-05-2020 11-06-2020 11-06-2020 11-06-2020 03:30 PM Active View
73. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER(PUR/MOIL/C-5/30/E-02/38-M Dt. 11/05/2020) 11-05-2020 10-07-2020 10-07-2020 10-07-2020 03:30 PM Active View
74. Replacement of sheave wheel 1 No at Kandri Mine(A-III/KAN/20-21/228) 08-05-2020 23-05-2020 23-05-2020 23-05-2020 04:30 PM Active View
75. PURCHASE OF COLD VULCANIZING SOLUTION AND HARDNER FOR JOINTING OF CONVEYOR BELTS AT BALAGHAT MINE(PUR/MOIL/BGT/IMB/20-21/78 dated 07.05.2020) 08-05-2020 26-05-2020 26-05-2020 26-05-2020 04:30 PM Active View
76. Dismantling, shifting and reassembling of 20 Nos of Joplin jig assembly from old site to new shed constructed along the ferro plant of balaghat Mine(AGT/BGT/MECH/JIG/20-21/256) 07-05-2020 15-05-2020 15-05-2020 15-05-2020 04:30 PM Active View
77. Construction of Shed over Sand Stowing Plant near DSU at Munsar Mine(Mun/Civil/NIT/2020-21/12 Date 06.05.2020) 06-05-2020 16-05-2020 16-05-2020 16-05-2020 04:30 PM Active View
78. Providing Designing Fabrication Installation and commissioning of motorized gate for mine workshop at Chikla mine(TE-22 DT.02042020) 06-05-2020 20-05-2020 20-05-2020 20-05-2020 04:30 PM Active View
79. Purchase of Undercarriage assemblies for HEMM.(MOIL/20-21/ET-31 dt.06.05.2020) 06-05-2020 11-06-2020 11-06-2020 12-06-2020 03:30 PM Active View
80. Purchase of CEMENT-824 MT(MOIL/20-21/ET-41 dt.06.05.2020) 06-05-2020 08-06-2020 08-06-2020 09-06-2020 03:30 PM Active View
81. PURCHASE OF BARE CENTRIFUGAL PUMP (MAKE- MAXFLOW PUMPS INDIA PVT.LIMITED, PUMP MODEL - 149HPB7R) - 1 NO. FOR BALAGHAT MINE(MP) (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/78/E-1/35 -M DT.06/05/2020) 06-05-2020 12-06-2020 12-06-2020 12-06-2020 03:30 PM Active View
82. Design, Manufacturing and Supply of 200 mm Butterfly valve Assy. without actuator for APIC Jig as per OEM Dimension along with material for I.M.B. plant.(AGT/BGT/MECH/IMB/20-21/71 Dated 04.05.2020) 05-05-2020 05-06-2020 05-06-2020 05-06-2020 04:30 PM Active View
83. Laying of Paver Blocks from CC Road upto Administrative Building Entrance at Kandri Mine.(KAN/Civil/NIT/2020-21/214 Date 02.05.2020) 04-05-2020 11-05-2020 11-05-2020 11-05-2020 04:30 PM Active View
84. Procurement of Telephone Exchange 200 lines for Balaghat Mine(BGT/ELECT/20-21/204) 02-05-2020 01-06-2020 01-06-2020 01-06-2020 04:30 PM Active View
85. Laying of Paver block for approach pathway and allied civil works for sewage treatment plant at Munsar Mine(MUN/CIVIL/NIT/20-21/08 DT.02.05.2020) 02-05-2020 16-05-2020 16-05-2020 16-05-2020 04:30 PM Active View
86. Repairing of civil work for 6th level substation premises at Balaghat Mine(Civil/BGT/TE/2020-21/42) 01-05-2020 12-05-2020 12-05-2020 12-05-2020 04:30 PM Active View
87. Procurement of 650Metres of 4CX50SQMM aluminum Armoured Cable for Dongri Buzurg Mine(DB/ELECT/20-21/88) 30-04-2020 26-05-2020 26-05-2020 26-05-2020 04:30 PM Active View
88. Purchase of Aluminum and Copper Lugs and DC Glands for Dongri Buzurg Mine.(DB/ELECT/20-21/89) 30-04-2020 26-05-2020 26-05-2020 26-05-2020 04:30 PM Active View
89. Purchase of Hydraulic Rock Breaker Attachment for Excavator at Dongri Buzurg Mine(M.S) - 1 No. (1 Lot) (Only Through e-procurement)(WE-130(ET-19) DT.30/04/2020) 30-04-2020 26-05-2020 26-05-2020 27-05-2020 03:30 PM Active View
90. Purchase of Triple Deck Vibratory Screen for Chikla Mine- 1 No.(1 Lot.) (Only Through e-procurement)(WE-3(ET-21) DT.30/04/2020) 30-04-2020 20-05-2020 20-05-2020 21-05-2020 03:30 PM Active View
91. Purchase of Jaw Crusher, Size 750 X 375 mm for Chikla Mine- 1 No.(1 Lot.) (Only Through e-procurement)(WE-2(ET-20) DT.30/04/2020) 30-04-2020 28-05-2020 28-05-2020 29-05-2020 03:30 PM Active View
92. Purchase of Triple Deck Vibratory Screen for Chikla Mine- 1 No.(1 Lot.) (Only Through e-procurement)(WE-3(ET-21) DT.30/04/2020) 30-04-2020 01-06-2020 01-06-2020 02-06-2020 03:30 PM Active View
93. Purchase of Ammonium Nitrate-Prilled-119 MT(WE-128 DT.29.04.2020 (e-Tender no.MOIL/20-21/ET/18) 29-04-2020 21-05-2020 21-05-2020 22-05-2020 03:30 PM Active View
94. Maintenance and Watering of Plantation at Kandri Mine(KAN/Civil/NIT/2020-21/160 Date 21.04.2020) 28-04-2020 04-05-2020 04-05-2020 04-05-2020 04:30 PM Active View
95. Repairing rubber lining of MSRL Electrolytic Cell Tanks of EMD Plant, Dongri Buzurg Mine(MOIL/20-21/ET/7) 27-04-2020 27-05-2020 27-05-2020 27-05-2020 03:30 PM Active View
96. Recovery of Reduced Ore and EMD Powder and Washing of Bottom EMD at EMD Plant, Dongri Buzurg Mine(MOIL/20-21/ET/6) 27-04-2020 27-05-2020 27-05-2020 27-05-2020 03:30 PM Active View
97. Removal of waste rock from the dump at 265 MRL near Jawahar Shaft of Chikla mine(TE-23 DT.09042020) 27-04-2020 04-05-2020 04-05-2020 04-05-2020 04:30 PM Active View
98. Procurement of Electrical C class material for Balaghat Mine(BGT/ELECT/2020-21/31) 25-04-2020 11-05-2020 11-05-2020 11-05-2020 04:30 PM Active View
99. Renovation of old floor Tiles with water supply and sanitary fittings work for Guest room bath of MM bunglow at Balaghat Mine(Civil/BGT/LT/2020-21/10) 22-04-2020 12-05-2020 12-05-2020 12-05-2020 04:30 PM Active View
100. Monsoon preparatory work for cleaning of surface drain in industrial premises at Balaghat Mine.(Civil/BGT/LT/2020-2021/14) 22-04-2020 11-05-2020 11-05-2020 11-05-2020 04:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.