Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Purchase of High Head Slurry Dewatering Pump for Dongri Buzurg Mine(M.S) - 1 No.(2 Lots) (Only Through e-procurement(WE-58(ET-243) DT.27.08.2019) 27-08-2019 19-09-2019 19-09-2019 20-09-2019 03:30 PM Active View
2. Purchase of High Head Slurry Dewatering Pump for Dongri Buzurg Mine(M.S) - 1 No.(2 Lots) (Only Through e-procurement(WE-58(ET-243) DT.27.08.2019) 27-08-2019 24-09-2019 24-09-2019 25-09-2019 03:30 PM Active View
3. Supply of Welding Electrodes As per Annex C(T.E.No.PUR/DB/19-20/180) 26-08-2019 25-09-2019 25-09-2019 25-09-2019 04:30 PM Active View
4. Secondary recovery of UKL -471 20 percent from F W dump from Ch.4300 to Ch.6800 at Ukwa Mine(MOIL/19-20/ET/225) 26-08-2019 26-09-2019 26-09-2019 26-09-2019 03:30 PM Active View
5. Hiring of machinery for sub grade mineral reject from Underground handling from magazine area at Kandri Mine(MOIL/19-20/ET/224) 26-08-2019 26-09-2019 26-09-2019 26-09-2019 03:30 PM Active View
6. Hiring of machinery for loading unloading and transportation of Hutch from Hutch settling pond and hutch drain at Balaghat Mine(MOIL/19-20/ET/226) 26-08-2019 26-09-2019 26-09-2019 26-09-2019 03:30 PM Active View
7. Transportation of bottom ash from Adani power plant tiroda to Balaghat Mine(BGT/Minin/LT/2019-20/539 A) 23-08-2019 02-09-2019 02-09-2019 02-09-2019 04:30 PM Active View
8. Renovation of IMB plant office and toilet at D.B. Mine(DB/C/HO/19-20/1704 Dt 20/08/2019) 23-08-2019 10-09-2019 10-09-2019 10-09-2019 04:30 PM Active View
9. Renovation of old toilet of EMD plant office at Dongri Buzurg Mine.(DB/C/HO/19-20/1705 Dt 20/08/2019) 23-08-2019 10-09-2019 10-09-2019 10-09-2019 04:30 PM Active View
10. Purchase of High quality Electrical Insulating Transformer Oil - 5880 Litres.(2 Lots.)(Only Through e-procurement)(WE-60(ET-232) DT.22/08/2019) 22-08-2019 16-09-2019 16-09-2019 17-09-2019 03:30 PM Active View
11. PURCHASE OF FASTNERS WIRE NAIL AND ROSE NAILS(PUR/MOIL/BGT/FASTNER/19-20/536) 22-08-2019 18-09-2019 18-09-2019 18-09-2019 04:30 PM Active View
12. PURCHASE OF G I PIPE FITTINGS(PUR/MOIL/BGT/PIPE FITTINGS/19-20/537) 22-08-2019 18-09-2019 18-09-2019 18-09-2019 04:30 PM Active View
13. Providing and laying Hume pipe from sand stowing plant for collection of pebbles at lower level bench, Kandri Mine(MOIL/19-20/ET/215) 22-08-2019 20-09-2019 20-09-2019 20-09-2019 03:30 PM Active View
14. Tea, Snacks and Lunch for Technical Programs to be conducted at Munsar Training Centre for the year 2019-20(MUN/Civil/NIT/2019-20/VTC/93 Date 10.08.2019) 19-08-2019 21-08-2019 21-08-2019 21-08-2019 04:30 PM Active View
15. Removal of Spillage material accumulated in 16.5 level at Balaghat Min(Mining/LT/2019-20/64) 12-08-2019 21-08-2019 21-08-2019 21-08-2019 04:30 PM Active View
16. Repairs to roof of camp quarters at Balaghat Mine(Civil/BGT/LT/2019-20/492) 12-08-2019 26-08-2019 26-08-2019 26-08-2019 04:30 PM Active View
17. Retaining wall for Installation of new pump shed foundation for 170 150HP pump North section Tirodi(TRD/CIVIL/19-20/1103 DATED 03.08.2019) 11-08-2019 20-08-2019 20-08-2019 20-08-2019 03:30 PM Active View
18. Proposal of outsourcing of repairs and maintenace of auto electrical work.(TRD/Elect/19-20/1059 Date 01/08/2019) 11-08-2019 20-08-2019 20-08-2019 20-08-2019 03:30 PM Active View
19. Removal of garbage cleaning of septic tankDrain at Camp area at Tirodi Mine(TRD/CIVIL/19-20/1074A DATED 03.08.2019) 11-08-2019 20-08-2019 20-08-2019 20-08-2019 03:30 PM Active View
20. Major repairing of Terex Loader at Munsar Mine(A-III/MUN/19-20/1516) 10-08-2019 19-08-2019 19-08-2019 19-08-2019 04:00 PM Active View
21. Procurement Of Float Gear Box With Motor For 400mm Conveyor Belt For Chikla Mine(TE-05 DT.10082019) 10-08-2019 26-08-2019 26-08-2019 26-08-2019 04:30 PM Active View
22. Lowering of HT XLPE copper cable from Production shaft surface inset to 13.5Level at Balaghat Mine(BGT/ELECT/19-20/470) 09-08-2019 26-08-2019 26-08-2019 26-08-2019 04:30 PM Active View
23. Water proofing to service magazine building at Balaghat Mine(Civil/BGT/LT/2019-20/2390) 08-08-2019 20-08-2019 20-08-2019 20-08-2019 04:30 PM Active View
24. Repairing of Lead Cathodes Plates at EMD Plant Dongri Buzurg Mine(MOIL/EMD/DB/Jt.GM/2019-20/214) 07-08-2019 20-08-2019 20-08-2019 21-08-2019 10;30 AM Active View
25. Purchase of Organic Waste Converter Machine Along with Shredder and Weiging Machines with Annual Maintenance Contact - 10 Nos.(2 Lots) (Only Through e-procurement)(WE-48(ET-222) DT.06/08/2019) 06-08-2019 28-08-2019 28-08-2019 29-08-2019 03:30 PM Active View
26. Purchase of Special bearing Grease, Multipurpose usage, MOSIL Make BRB-100 or equivalent - 900 Kgs.(2 Lots) (Only Through e-procurement)(WE-54(ET-223) DT.06/08/2019) 06-08-2019 28-08-2019 28-08-2019 29-08-2019 03:30 PM Active View
27. Purchase of D.G.Set in The Range of 1250KVA To 1500KVA, 11KV with Erection and Commissioning for Chikla Mine(M.S) - 1 No.(2 Lots) and D.G.Set Rated 1000KVA, 11 KV with Erection and Commissioning for Dongri Buzurg Mine(M.S) - 1 No.(2 Lots)(WE-47(ET-221) DT 06-08-2019 03-09-2019 03-09-2019 04-09-2019 03:30 PM Active View
28. Confining the openings of B and C-Type Quarters of Officers Colony by providing MS grills, Munsar Mine.(Munsar/Civil/2019-20/82 Date 03.08.2019) 05-08-2019 13-08-2019 13-08-2019 13-08-2019 04:30 PM Active View
29. Construction of Shed for Jigging near Canteen Building at Munsar Mine.(Munsar/Civil/2019-20/79 Date 31.07.2019) 05-08-2019 10-08-2019 10-08-2019 10-08-2019 04:30 PM Active View
30. Development of approach road to Parsoda Mine.(Parsoda/Civil/NIT/19-20/86 Date 03.08.2019) 05-08-2019 13-08-2019 13-08-2019 13-08-2019 04:30 PM Active View
31. Making and Supplying of stemming material mud plug used to Blasting /fragment in underground at various working level at Balaghat Mine(BGT/Mining/LT/2019-20/50) 05-08-2019 13-08-2019 13-08-2019 13-08-2019 04:30 PM Active View
32. Construction of New generator house at North 6 No section at Tirodi Mine( MOIL/19-20/ET/184) 05-08-2019 23-08-2019 23-08-2019 23-08-2019 03:30 PM Active View
33. Procurement of HDPE Pipe 140 MM At Dongri Buzurg Mine.(PUR/DB/19-20/130) 05-08-2019 20-08-2019 20-08-2019 20-08-2019 04:30 PM Active View
34. Installation of centralised control for compressed air distribution system by installation of motorised valves and control panel at Balaghat Mine(MOIL/19-20/ET/216) 02-08-2019 02-09-2019 02-09-2019 02-09-2019 03:30 PM Active View
35. Request for Empanelment For Empanelment of Consultant/ Transaction Advisor For Due Diligence and advise on Transaction of Targets Assets( MOIL/RFE/CTA/2019-20) 02-08-2019 06-09-2019 06-09-2019 07-09-2019 11:00 AM Active View
36. Loading and unloading of steel section and various materials with stacking at Dongri Buzurg Mine(MOIL/19-20/ET/211) 02-08-2019 03-09-2019 03-09-2019 03-09-2019 03:30 PM Active View
37. Cleaning of excess ROM at Beldongri Mine(MOIL/19-20/ET/209) 02-08-2019 03-09-2019 03-09-2019 03-09-2019 03:30 PM Active View
38. Picking and collection of material DBL-456 25 percent and DBL-563 20 percent Mn from contaminated low grade at Dongri Buzurg Mine North West side part-5(MOIL/19-20/ET/213) 02-08-2019 03-09-2019 03-09-2019 03-09-2019 03:30 PM Active View
39. Providing unskilled manpower in C and S plant for housekeeping and smooth operation of C and S plant at Chikla Mine for the year 2019-20(MOIL/19-20/ET/210) 02-08-2019 03-09-2019 03-09-2019 03-09-2019 03:30 PM Active View
40. Cleaning of surface drain and making of earthen bound for monsoon preparation at Tirodi Mine(TRD/CIVIL/19-20/957,Dateed 12/7/2019) 01-08-2019 08-08-2019 08-08-2019 08-08-2019 03:30 PM Active View
41. Purchase of G.B.Car, Capacity- 4 MT For Balaghat Mine(M.P) - 15 Nos. (1 Lot) (Only Through e-procurement)(WE-52(ET/219) DT.01/08/2019) 01-08-2019 21-08-2019 21-08-2019 22-08-2019 03:30 PM Active View
42. Purchase of Cassette Type Air Conditioners 2 Ton - 4 Nos. (Lot No.1) for MOIL Gymnasium, West Court, Rajnagar, Nagpur and Cassette Type Air Conditioners 4 Ton - 4 Nos. (Lot No.2) for Auditorium of MOIL BHAWAN, Nagpur (M.S) (Only Through e-procuremen(WE-53 01-08-2019 11-09-2019 11-09-2019 12-09-2019 03:30 PM Active View
43. REWIRING OF MINE MANAGER BUNGALOW AT MUNSAR MINE(ELECT/MUN/ADGM/19-20/400) 31-07-2019 09-08-2019 09-08-2019 09-08-2019 03:30 PM Active View
44. Tea, Snacks and Lunch for Technical Programs to be conducted at Munsar Training Centre for the year 2019-20(Mun/Per/NIT/19-20/VTC/74 Date 30.07.19) 31-07-2019 10-08-2019 10-08-2019 10-08-2019 04:30 PM Active View
45. PURCHASE OF SPARES FOR 240 HP KIRLOSKAR PUMP AT BALAGHAT MINE FROM OEM / AUTHORIZED DEALER(PUR/MOIL/BGT/PUMP/19-20/439) 31-07-2019 19-08-2019 19-08-2019 19-08-2019 04:30 PM Active View
46. Laying of New 6 inch delivery pipeline from 13.5 level to 10 level Vertical and replacement of existing 300 HP pipeline from 10 level to surface vertical( AGT/BGT/MECH/PIPE/19-20/440) 31-07-2019 19-08-2019 19-08-2019 19-08-2019 04:30 PM Active View
47. Purchase of Water Softener plant for 3 TPH FBC boiler - 1 No.(1 Lot) at EMD Plant, Dongri Buzurg Mine(M.S)(Only Through e-procurement)(WE-50(ET/217) DT.31/07/2019) 31-07-2019 20-08-2019 20-08-2019 21-08-2019 03:30 PM Active View
48. Purchase of Agitator Shaft Assembly with Agitator blades(AISI 316-H) for Leaching Vessel - 1 Set (1 Lot.) for EMD Plant, Dongri Buzurg Mine (M.S) (Only Through e-procurement)(WE-51(ET/218) DT.31/07/2019) 31-07-2019 20-08-2019 20-08-2019 21-08-2019 03:30 PM Active View
49. Transportation of sand from Kanki Ghat to Balaghat mine for the purpose of sand stowing in underground Balaghat Mine(MOIL/19-20/ET/205) 31-07-2019 30-08-2019 30-08-2019 30-08-2019 03:30 PM Active View
50. Outsourcing of Dry Density Separation Plant operation at Munsar Mine for the period of 9 (Nine) Months( MOIL/19-20/ET/161) 31-07-2019 30-08-2019 30-08-2019 30-08-2019 03:30 PM Active View
51. Outsourcing of Maintenance and repairs of HT and LT overhead lines at Chikla Mine(TE MOIL/CH/19-20/02) 30-07-2019 13-08-2019 13-08-2019 13-08-2019 04:30 PM Active View
52. Production of 25 percent Mn SM grade ore BGL-523 from Underground old sub grade mineral reject material at Balaghat Mine(MOIL/19-20/ET/206) 30-07-2019 30-08-2019 30-08-2019 30-08-2019 03:30 PM Active View
53. Picking and collection of low grade contaminated Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine East side part-6(MOIL/19-20/ET/207) 30-07-2019 30-08-2019 30-08-2019 30-08-2019 03:30 PM Active View
54. Picking and collection of low grade contaminated Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine East side part-5(MOIL/19-20/ET/208) 30-07-2019 30-08-2019 30-08-2019 30-08-2019 03:30 PM Active View
55. STRUCTURAL AUDIT AND NON- DESTRUCTIVE TESTING(NDT) OF IMB PLANT STRUCTURE AT BALAGHAT MINE.(AGT/BGT/MECH/STRU/19-20/429) 29-07-2019 13-08-2019 13-08-2019 13-08-2019 04:30 PM Active View
56. PROVIDING AND APPLYING NEOPRENE RUBBER LINNING TO 2 LAKHS LITERS CELL FEED TANK AT EMD PLANT DB MINE(MOIL/EMD/DB/SDGM/2019-20/190) 27-07-2019 07-08-2019 07-08-2019 08-08-2019 10;30 AM Active View
57. Laying of lawn for prepration of Garden premises near Mine Entry premises at Balaghat Mine(Civil/BGT/LT/19-20/146) 24-07-2019 05-08-2019 05-08-2019 05-08-2019 04:30 PM Active View
58. providing 6 mbps 1 is to 1 Internet Leased Line(ADGM/ Group-III/ SYS/NW/ 2019-20/363) 23-07-2019 30-07-2019 30-07-2019 30-07-2019 03:30 PM Active View
59. Purchase of FRVE Header Bars for Anodes and Cathodes - 450 Nos.each (2 Lots) for EMD Plant, Dongri Buzurg Mine (M.S) (Only Through e-procurement)(WE-49(ET/212) DT.23/07/2019) 23-07-2019 13-08-2019 13-08-2019 14-08-2019 03:30 PM Active View
60. Purchase of PP Filter Press with Suitable Compressor, Reservoir and Piping etc.for EMD Plant, Dongri Buzurg Mine(M.S) - 1 No. (1 Lot) (Only Through e-procurement)(WE-24(ET/204) DT.23/07/2019) 23-07-2019 13-08-2019 13-08-2019 14-08-2019 03:30 PM Active View
61. Provision of 33 KV Outdoor Check Meter for 33 KV Line for Vertical Shaft (High Speed Shaft) at Gumgaon Mine(MOIL/19-20/ET/172) 23-07-2019 23-08-2019 23-08-2019 23-08-2019 03:30 PM Active View
62. TENDER FOR REPLACEMENT OF 11KV CTs AND PTs EXISTING METER CUBICAL OF MUNSAR MINE(ELECT/MUN/ADGM/19-20/353) 22-07-2019 31-07-2019 31-07-2019 31-07-2019 03:30 PM Active View
63. WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR FILLING SPREADING AT WESTERN SIDE OF -470 LEVEL AT CHIKLA MINE(TE-37 Dt.22072019) 22-07-2019 06-08-2019 06-08-2019 06-08-2019 04:30 PM Active View
64. WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR FILLING SPREADING AT WESTERN SIDE OF -470 LEVEL AT CHIKLA MINE(TE-37 Dt.22072019) 22-07-2019 06-08-2019 06-08-2019 06-08-2019 04:30 PM Active View
65. Hiring of Diesel Jeep for three months at Balaghat Mine(AGT/BGT/MECH/19-20/2087) 20-07-2019 05-08-2019 05-08-2019 05-08-2019 04:30 PM Active View
66. ERW Steel Pipes(PUR/MOIL/C-1/197/WE-44/ET/203) 19-07-2019 20-08-2019 20-08-2019 21-08-2019 03:30 PM Active View
67. Repairing of Stick and Bucket Pin Bore holes of TATA Hitachi Zx 450 Hydraulic Excavator no.1 and 2 Two Machines by line boring and bushing work.(DB/MECH/DRILL/19-20/108) 18-07-2019 24-07-2019 24-07-2019 24-07-2019 04:30 PM Active View
68. Premium Greaves make Worm Gear box Model U800 Reduction Ratio 70 is to 1 Right Handling(MOIL/EMD/CH/ASDGM/2019-20/113) 18-07-2019 30-07-2019 30-07-2019 31-07-2019 09:00 AM Active View
69. Purchase of D.G.Sets Rated 25 KVA - 3 Nos. and 7.5 KVA - 1 No.(4 Lots.) required for Various Mines (Only through e-procurement)(WE-46(ET/200) DT.18/07/2019) 18-07-2019 07-08-2019 07-08-2019 08-08-2019 03:30 PM Active View
70. G.I.Wire Netting and S.S.Screen Cloth(PUR/MOIL/C-1/203/WE-39/ET/201) 18-07-2019 19-08-2019 19-08-2019 20-08-2019 03:30 PM Active View
71. Purchase of SPRING STEEL SCREEN PANELS -15 items( WE-45 e-tender No.MOIL/19-20/ET-202, Dt.18.07.2019) 18-07-2019 13-08-2019 13-08-2019 14-08-2019 03:30 PM Active View
72. Repairing of 02 Nos. two number Track Chain Assembly of TATAHitachi Zx220 Hydraulic Excavator operating at Dongri Buzurg Mine.(DB/MECH/19-20/SDGM(MECH)/104) 17-07-2019 24-07-2019 24-07-2019 24-07-2019 04:30 PM Active View
73. Repairing of Idler Assembly- 1 No. and Sprocket Assembly -2 Nos. of TATA Hitachi Zaxis 450 No.2 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/19-20/SDGM(MECH)/105) 17-07-2019 24-07-2019 24-07-2019 24-07-2019 09:00 AM Active View
74. Work of repair and maintenance contract for domestic electrical installation of residential and non-residential buildings at Gumgaon mine(MOIL/19-20/ET/165) 17-07-2019 14-08-2019 14-08-2019 14-08-2019 03:30 PM Active View
75. PURCHASE OF STANDARDS FOR GBS (AAS)(PUR/MOIL/C-3/43/E-37/377-M DT.16.07.2019) 16-07-2019 31-07-2019 31-07-2019 31-07-2019 03:30 PM Active View
76. Major repairing works for Terex Loader at Munsar Mine(A-III/MUN/2019-20/1259 Date 15.07.19) 16-07-2019 29-07-2019 29-07-2019 29-07-2019 04:00 PM Active View
77. C.I.Gate, Foot and N R Valves(PUR/MOIL/C-1/202/WE-43/ET/199) 16-07-2019 19-08-2019 19-08-2019 20-08-2019 03:30 PM Active View
78. PURCHASE OF SHOT FIRING CABLE(PUR/MOIL/C-3/30/E-36/349-M DT.16.07.2019) 16-07-2019 16-08-2019 16-08-2019 16-08-2019 03:30 PM Active View
79. WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR FILLING SPREADING AT EASTERN SIDE OF -470 LEVEL AT CHIKLA MINE(TE-36 Dt.15072019) 15-07-2019 22-07-2019 22-07-2019 22-07-2019 04:30 PM Active View
80. C.I.Ball Valves(PUR/MOIL/C-1/202/WE-37/ET/197) 15-07-2019 07-08-2019 07-08-2019 08-08-2019 03:30 PM Active View
81. Butterfly Valves(PUR/MOIL/C-1/202/WE-38/ET/198) 15-07-2019 07-08-2019 07-08-2019 08-08-2019 03:30 PM Active View
82. Removingand Laying G.I. Pipe line in Weigh Bgidge to Well to IMB at Bgt Mine(Civil/BGT/LT/19-20/39) 14-07-2019 26-07-2019 26-07-2019 26-07-2019 04:30 PM Active View
83. Sapling at North Mine Dump area at Tirodi Mine(TRD/CIVIL/19-20/751 DATED 19.06.2019) 13-07-2019 23-07-2019 23-07-2019 23-07-2019 03:30 PM Active View
84. PROVIDING OF FENCING TO PROTECT SAPLING AT TIRODI MINE(TRD/CIVIL/19-20/750,DATED 18.06.2019) 13-07-2019 24-07-2019 24-07-2019 24-07-2019 03:30 PM Active View
85. Protection work for Foundation of production shaft at Balaghat Mine( CIVI/BGT/LT/19-20/45 DATE 12.07.2019) 13-07-2019 26-07-2019 26-07-2019 26-07-2019 04:30 PM Active View
86. Collection of garbage and dump into barren/abundant land at Balaghat Mine(Civil/BGT/LT/19-20/41) 13-07-2019 26-07-2019 26-07-2019 26-07-2019 04:30 PM Active View
87. Repairing of Track Components of Side Dump Loader no.8 in 10th Level Underground of Balaghat Mine( AGT/BGT/MECH/SDL/19-20/341) 13-07-2019 30-07-2019 30-07-2019 30-07-2019 04:30 PM Active View
88. Purchase of Class Items for Ferro Manganese Plant for year 19-20(TE/MOIL/FMP/MECH/19-20/113) 13-07-2019 13-08-2019 13-08-2019 13-08-2019 04:30 PM Active View
89. Tramline Accessories(PUR/MOIL/C-12/5/WE-42/ET/195) 12-07-2019 06-08-2019 06-08-2019 07-08-2019 03:30 PM Active View
90. Purchase of Vehicle Batteries(WE-36 DT.11.07.2019 (e-Tenderno.MOIL/19-20/ET/194)) 12-07-2019 08-08-2019 08-08-2019 09-08-2019 03:30 PM Active View
91. Purchase of Rubber Air Hoses(WE-41 DT.12.07.2019 (e-Tenderno.MOIL/19-20/ET/196)) 12-07-2019 08-08-2019 08-08-2019 09-08-2019 03:30 PM Active View
92. Replacement of Guide Rail of Vertical Shaft at Chikla Mine(MOIL/19-20/ET/189) 12-07-2019 12-08-2019 12-08-2019 12-08-2019 03:30 PM Active View
93. Extra excavation in manganiferrous rocks at stope no. Ch. 2275 to Ch. 2335 and Ch. 2455 to Ch. 2485 from -270 Level to -170 Level and hoisting of tubs from -270 Level to surface bunker through 2nd vertical shaft at Chikla Mine(MOIL/19-20/ET/177) 12-07-2019 13-08-2019 13-08-2019 13-08-2019 03:30 PM Active View
94. Trench cutting in ore stacks at Chikla Mine(MOIL/19-20/ET/176) 12-07-2019 13-08-2019 13-08-2019 13-08-2019 03:30 PM Active View
95. Secondary recovery of UKL -471 20 percent from F W dump from Ch.9000 to Ch.12000 at Ukwa Mine(MOIL/19-20/ET/183) 12-07-2019 13-08-2019 13-08-2019 13-08-2019 03:30 PM Active View
96. PURCHASE OF STEEL WIRE ROPE -12 MM (USHA MARTIN MAKE) FOR FERRO MANGANESE PLANT, BALAGHAT MINE(PUR/MOIL/C-3/23/E-35/348-M DT.12.07.2019) 12-07-2019 16-08-2019 16-08-2019 16-08-2019 03:30 PM Active View
97. WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR SCREENING OF SIDING DEBRIDGE TO PRODUCE 360MT ORE(Lumpy) AND 190MT FINES AT CHIKLA MINE(TE-35 Dt.11072019) 11-07-2019 18-07-2019 18-07-2019 18-07-2019 04:30 PM Active View
98. PVC PIPES - 12 mm AND 20 mm( PUR/MOIL/C-1/196/WE-40/ET/192) 11-07-2019 01-08-2019 01-08-2019 02-08-2019 03:30 PM Active View
99. IRON PAN AND ORE CLEANING HAMMER(PUR/MOIL/C-1/196/WE-33/ET/191) 11-07-2019 01-08-2019 01-08-2019 02-08-2019 03:30 PM Active View
100. Purchase of Man Winding Steel Wire Ropes( WE-15 DT.11.07.2019 (e-Tenderno.MOIL/19-20/ET/193) 11-07-2019 06-08-2019 06-08-2019 07-08-2019 03:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.