Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Tender inviting in single bid system for Proposal for fabrication and installation of Steel Platform and associated works near 2nd Vert)ical Shaft at Chikla mine.(PUR/MOIL/CH/MECH/20-21/06) 10-08-2020 17-08-2020 17-08-2020 17-08-2020 03:30 PM Active View
2. REPAIRING OF RHS TRACK CHAIN ASSY OF TATAHITACHI 450-1 HYDRAULIC EXCVATOR OF DONGRI BUZURG MINE.(DB/MECH/20-21/JGM(MECH)/525) 06-08-2020 14-08-2020 14-08-2020 14-08-2020 04:30 PM Active View
3. Waterproofing to RCC slab of old B-Type and C-Type Quarters at Dongri Buzurg Mine.(DB/Civil/20-21/526 Date 04/08/2020) 06-08-2020 14-08-2020 14-08-2020 14-08-2020 04:30 PM Active View
4. Maintenance and operation of pumps for drinking water supply in camp area at Kandri Mine(MOIL/20-21/ET/92) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
5. Construction of Community hall at village Chakdehi Distt Mandla (MP) under CSR(MOIL/20-21/ET/105) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
6. Construction of additional floor at Saraswati Mandir an educational institute for Deaf-Mute Childerns at Nagpur under CSR(MOIL/20-21/ET/104) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
7. Construction of new water supply scheme at Chikla Mine(MOIL/20-21/ET/93) 05-08-2020 09-09-2020 09-09-2020 09-09-2020 03:30 PM Active View
8. Maintenance of gardens at Administrative Building and Mine Managers Bungalow at Beldongri Mine(MOIL/20-21/ET/98) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
9. Maintenance, watch and ward of various gardens at Munsar Mine(MOIL/20-21/ET/97) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
10. Const of cubical room and HT panel room and certralized CCTV room near Mine store at Chikla Mine(MOIL/20-21/ET/96) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
11. Construction of CC platform and Industrial shed near dry separation unit at Munsar Mine(MOIL/20-21/ET/95) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
12. Annual repairs to camp quarters at Kandri Mine.(MOIL/20-21/ET/94) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
13. Construction Switch room and NGR panel room and 11 kv cable trench of Chikla Mine(MOIL/20-21/ET/91) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
14. ET 90 for Operation and minor maintenance of water supply scheme at MOIL Bhawan CMD Bungalow CMS with A type quarters and West court with guest house Transit house and Bansivilla compound area MOI Nagpur(MOIL/20-21/ET/90) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
15. BLANKET RATE CONTRACT FOR TWO YEARS FOR SUPPLY OF LARSEN AND TOUBRO MAKE SWITCHGEARS PRODUCTS(PUR/MOIL/E-05/79-M DT.04.08.2020) 04-08-2020 24-08-2020 24-08-2020 24-08-2020 03:30 PM Active View
16. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR ATLAS COPCO MAKE ROCK BREAKER MODEL MB -1500.(PUR/MOIL/C-5/70/E-09/168-M Dt. 04/08/2020) 04-08-2020 26-08-2020 26-08-2020 26-08-2020 03:30 PM Active View
17. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR IR MAKE AIR COMPRESSOR MODEL IN-15-7 AND DYER IR24R, D144 INA FOR IMB PLANT BALAGHAT MINE(PUR/MOIL/C-5/65/E-10/169-M Dt. 04/08/2020) 04-08-2020 26-08-2020 26-08-2020 26-08-2020 03:30 PM Active View
18. Complete survey, Estimation of 3D Subsidence parameter and 3D Numerical Modelling of Subsidence parameters at Chikla Mine of MOIL over an area of 150.650 Ha with survey certification by MoEF recommended Instititions(MOIL/20-21/ET/72) 03-08-2020 19-08-2020 19-08-2020 19-08-2020 03:30 PM Active View
19. FABRICATION OF STEEL ORE PASSES FOR BALAGHAT MINE(AGENT/BGT/MECH/20-21/1362) 01-08-2020 26-08-2020 26-08-2020 26-08-2020 04:30 PM Active View
20. Design, Manufacture and supply plumber block for pinion Shaft of Production shaft winder at Balaghat Mine.(AGENT/BGT/MECH/20-21/1361) 01-08-2020 26-08-2020 26-08-2020 26-08-2020 04:30 PM Active View
21. Under ground filling and spreading of waste rock at 13.5th level North section at Balaghat Mine(MIN/BGT/AGT/LT/20-21/469 dt 29.07.2020) 31-07-2020 10-08-2020 10-08-2020 10-08-2020 04:30 PM Active View
22. Supply of empty cement bags for muffle blasting at Tirodi Mine.(403 Dated 15.07.2020) 31-07-2020 05-08-2020 05-08-2020 05-08-2020 03:30 PM Active View
23. Cleaning of Sump at 1650 L Underground at Ukwa Mine(AGT/Civil/UK/LT/20-21/443 Date 28.07.2020) 30-07-2020 10-08-2020 10-08-2020 10-08-2020 04:30 PM Active View
24. CLEANING OF DRAIN(AGT/Civil/UK/LT/20-21/442 Date 28.07.2020) 30-07-2020 10-08-2020 10-08-2020 10-08-2020 04:30 PM Active View
25. Installation of retaining wall from steel section for new dump screen installed near new Joplin Jig section at Balaghat Mine(AGENT/BGT/MECH/20-21/ 451) 29-07-2020 18-08-2020 18-08-2020 18-08-2020 04:30 PM Active View
26. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HOLMAN CLIMAX AIR WINCHES.(PUR/MOIL/C-5/46/E-12/174-M Dt. 29/07/2020) 29-07-2020 19-08-2020 19-08-2020 19-08-2020 03:30 PM Active View
27. PURCHASE OF PEOPLELINK EXTENSION MICROPHONE(PUR/MOIL/C-4/138/E-13/176-M DT.28.07.2020) 28-07-2020 14-08-2020 14-08-2020 14-08-2020 03:30 PM Active View
28. Tender For 10 Mbps Wired Wireless Internet Broadband Line 1 1 at Ukwa Mine(BG/SYSTEM/Network/2020-21/433) 23-07-2020 07-08-2020 07-08-2020 07-08-2020 03:30 PM Active View
29. Maintenance, Distribution and Collection of Cap Lamps at Kandri Mine through outsourcing for the period of one year(MOIL/20-21/ET/74) 23-07-2020 24-08-2020 24-08-2020 24-08-2020 03:30 PM Active View
30. WEBSITE SNGLE TENDER ENQUIRY IN TWO BID SYSTEM TO ENTER INTO BLANKET RATE CONTRACT FOR TWO YEARS-2020-22- FOR PURCHASE OF HOLMAN-ROCKWELL MAKE SPARES FOR ROCK DRILL AN AIR LEG MACHINES- HOLMAN AND ROCKEWELL ONLY.(PUR/MOIL/C-5/16/E-08/169-M Dt. 23/07/2020) 23-07-2020 05-08-2020 05-08-2020 05-08-2020 03:30 PM Active View
31. Purchase of Strata Monitoring Instrument MPBX for Chikla Mine(TE-04 DT.21072020) 21-07-2020 11-08-2020 11-08-2020 11-08-2020 04:30 PM Active View
32. PURCHASE OF SPARES FOR SIGNALLING SYSTEM OF 150HP WINDER FOR KANDRI MINE(PUR/KD/ELECT/20-21/) 21-07-2020 28-07-2020 28-07-2020 28-07-2020 04:30 PM Active View
33. OUTSOURCING OF GENERAL MAINTENANCE AND REGULAR CHECKUP OF DUMPERS AND TIPPERS ONLY REGISTERED CONTRACTORS WHO DOING THIS TYPE OF SIMILAR WORK SINCE ATLEAST FROM LAST YEAR(MOIL/HO/MECH/2020/56 DT 23.05.2020) 20-07-2020 25-07-2020 25-07-2020 25-07-2020 03:30 PM Active View
34. Designing and printing of Annual Report 2019-20 (Deluxe Version in English, Hindi and Marathi)(MOIL/20-21/ET/99) 20-07-2020 10-08-2020 10-08-2020 10-08-2020 03:30 PM Active View
35. OUTSOURCING OF GENERAL MAINTENANCE AND REGULAR CHECKUP OF DOZER AND EXCAVATOR(MOIL/HO/MECH/2020/57 DT. 23.05.2020) 19-07-2020 25-07-2020 25-07-2020 25-07-2020 03:30 PM Active View
36. Scanning and Digitization of Company Records(MOIL/20-21/ET/102) 18-07-2020 17-08-2020 17-08-2020 17-08-2020 03:30 PM Active View
37. Development of Vendor Invoice Tracking System(MOIL/20-21/ET/100) 18-07-2020 17-08-2020 17-08-2020 17-08-2020 03:30 PM Active View
38. Maintenance and operation of water supply scheme at Dongri Buzurg Mine(MOIL/20-21/ET/89) 17-07-2020 17-08-2020 17-08-2020 17-08-2020 03:30 PM Active View
39. Construction of RCC sump and laying of pipe line for supply of water to new A type quarters and Medical Administrative building at MOIL Nagpur(MOIL/20-21/ET/103) 17-07-2020 17-08-2020 17-08-2020 17-08-2020 03:30 PM Active View
40. Ultrasonic and Magnetic Particle NDT Testing of CSG Components of all winders at Balaghat mine(AGENT/BGT/MECH/NDT/20-21/395) 16-07-2020 05-08-2020 05-08-2020 05-08-2020 04:30 PM Active View
41. Maintenance repair of HT/LT overhead lines for the three months at Balaghat Mine(BGT/ELECT/20-21/376) 14-07-2020 31-07-2020 31-07-2020 31-07-2020 04:30 PM Active View
42. Repairing of Bucket assembly 5.6 Cu M -- 4 Nos of TATAHitachi 1200-3 Hydraulic Excavator of DB Mine.(DB/MECH/20-21/JGM(MECH)/321) 14-07-2020 21-07-2020 21-07-2020 21-07-2020 04:30 PM Active View
43. Replacement of 6mm thick liner plates at 14.5th Level loading station of Production shaft at Balaghat Mine(AGT/BGT/MECH/WINDER/20-21/374) 13-07-2020 04-08-2020 04-08-2020 04-08-2020 04:30 PM Active View
44. Replacement of liner plates of the transfer chute, bunker and repair of transfer chute/bunker at various location at IMB plant of Balaghat Mine(AGENT/BGT/MECH/IMBP/20-21/ 371) 11-07-2020 28-07-2020 28-07-2020 28-07-2020 04:30 PM Active View
45. Construction of Drain around Service Winze beside I st Vertical Shaft at Munsar Mine(MUN/CIVIL/NIT/20-21/51 DT 08.07.2020) 10-07-2020 15-07-2020 15-07-2020 15-07-2020 04:30 PM Active View
46. Purchase of Steel Cages - 5 Nos.(2 LOTS.) (Only Through e-procurement)(WE-25(ET-88) DT.10/07/2020) 10-07-2020 03-08-2020 03-08-2020 04-08-2020 03:30 PM Active View
47. Comprehensive Annual Maintenance Contract CAMC of Computers, Printers, UPSs installed at Tirodi and Sitapatore Mine(BGT/SYSTEM/AMC/2020-21/354) 07-07-2020 17-07-2020 17-07-2020 17-07-2020 03:30 PM Active View
48. Purchase of PEARL COKE with Transportation - 6900 MT(MOIL/20-21/ET-87 dt.06.07.2020) 06-07-2020 05-08-2020 05-08-2020 06-08-2020 03:30 PM Active View
49. Repairing kachha road at North and South Section mine road at Tirodi Mine.(TRD/CIVIL/2020-21/528 Dated 21.06.2020) 04-07-2020 09-07-2020 09-07-2020 09-07-2020 03:30 PM Active View
50. Retaining wall for installation of pump shed and foundation for 170HP pump150HP pump north C section at Tirodi Mine.(TRD/CIVIL/2020-21/481 Dated 19.06.2020) 04-07-2020 09-07-2020 09-07-2020 10-07-2020 03:30 PM Active View
51. New installation of pump foundation and retaining wall for 170HP, 150HP north section at Tirodi Mine.(TRD/CIVIL/2020-21/467 Dated 11.06.2020) 04-07-2020 09-07-2020 09-07-2020 09-07-2020 03:30 PM Active View
52. Cleaning of septic tank with vacuum cleaning machine at camp/colony area at Tirodi Mine.(TRD/CIVIL/2020-21/527 Dated 21.06.2020) 04-07-2020 08-07-2020 08-07-2020 09-07-2020 03:30 PM Active View
53. Expression of Interest (EoI) for Setting up X- Ray based sorting system(PUR-MOIL-X RAY OCS/ET-85) 01-07-2020 29-09-2020 29-09-2020 29-09-2020 03:30 PM Active View
54. Purchase of Flexible Trailing Copper Conductor Cable(WE-21 DT.01.07.2020 (e-Tender no.MOIL/20-21/ET/86)) 01-07-2020 29-07-2020 29-07-2020 30-07-2020 03:30 PM Active View
55. BLANKET RATE CONTRACT FOR TWO YEARS FOR SUPPLY OF SIEMENS MAKE SWITCHGEARS PRODUCTS(PUR/MOIL/C-3/13/E-06/80-M DT.29.06.2020) 01-07-2020 15-07-2020 15-07-2020 15-07-2020 03:30 PM Active View
56. Loading transportation and unloading of manganese ore ROM at Beldongri Mine(Bel/Min/20-21/600 Dated 28.06.2020) 30-06-2020 09-07-2020 09-07-2020 09-07-2020 03:30 PM Active View
57. Tnder inviting in single bid system for Construction of switch and NGR panel room and 11KV cable teach at Chikla mine.(TE/CH/CIVIL/20-21/309) 30-06-2020 09-07-2020 09-07-2020 09-07-2020 03:30 PM Active View
58. Comprehensive Annual Maintenance Contract CAMC of Computers, Printers, UPSs installed at Balaghat Mine(BGT/SYSTEM/AMC/2020-21/315) 29-06-2020 10-07-2020 10-07-2020 10-07-2020 03:30 PM Active View
59. Comprehensive Annual Maintenance Contract CAMC of Computers, Printers, UPSs installed at Ukwa Mine(BGT/SYSTEM/AMC/2020-21/317) 29-06-2020 10-07-2020 10-07-2020 10-07-2020 03:30 PM Active View
60. Cleaning of Underground Sumps and Underground Level Drains under Monsoon Preparatory Works at Munsar Mine(ADGM/Mining/LT/2020-21/46 Date 26.06.2020) 27-06-2020 06-07-2020 06-07-2020 06-07-2020 04:30 PM Active View
61. Tender inviting in single bid system for Providing Water by Tanker in Residential Colonies at Chikla mine.(TE-CIVIL20-21-280) 27-06-2020 11-07-2020 11-07-2020 11-07-2020 04:00 PM Active View
62. Cleaning of surface drains and making of earthen bunds for North and south section for Monsoon preparatory works at Tirodi Mine.(TRD/CIVIL/2020-21/524 Dated 20/06/2020) 26-06-2020 30-06-2020 30-06-2020 01-07-2020 03:30 PM Active View
63. Repairing of Track Components of Side Dump Loader no.9 in 12th Level Underground of Balaghat Mine(AGT/BGT/MECH/SDL/20-21/291) 26-06-2020 15-07-2020 15-07-2020 15-07-2020 04:30 PM Active View
64. Tender for Laying of 6 inch and 4 inch GI pipe line for compressed air in underground at balaghat mine(AGT/BGT/MECH/PIPE/20-21/290) 26-06-2020 15-07-2020 15-07-2020 15-07-2020 04:30 PM Active View
65. Fabrication of Miscellaneous Items for Balaghat Mine(BGT/MECH/MISC ITEM/20-21/289) 25-06-2020 06-07-2020 06-07-2020 06-07-2020 04:30 PM Active View
66. Purchase of Pneumatic Stopper with Telescopic Air Leg for various Mines - 2 Lots.(Only Through e-procurement)(WE-14(ET-84) DT.25/06/2020) 25-06-2020 15-07-2020 15-07-2020 16-07-2020 03:30 PM Active View
67. Removal of waste rock from the dump at 265 MRL near Jawahar Shaft at Chikla Mine.(TE/CHIKLA/MECH/2020-21/94) 24-06-2020 30-06-2020 30-06-2020 30-06-2020 03:30 PM Active View
68. Operation Maintenance, watch and ward of Solid Waste Management Plant at Munsar Mine(MUN/CIVIL/AGT/NIT/20-21/44 DT.24.06.2020) 24-06-2020 30-06-2020 30-06-2020 30-06-2020 04:30 PM Active View
69. Purchase of Compressed Oxygen Gas and Dissolved Acetylene Gas Cylinders(MOIL/20-21/ET-83 dt.24.06.2020) 24-06-2020 16-07-2020 16-07-2020 17-07-2020 03:30 PM Active View
70. Purchase of Cable Bolting Machines for Various Mines - 6 Nos.(1 Lot) (Only Through e-procurement)(WE-18(ET-81) DT.24/06/2020) 24-06-2020 20-07-2020 20-07-2020 21-07-2020 03:30 PM Active View
71. Purchase of Pneumatic Rock Drill Machines and Pusher Leg for various Mines (4 Lots.) (Only Through e-procurement)(WE-19(ET-82) DT.24/06/2020) 24-06-2020 16-07-2020 16-07-2020 17-07-2020 03:30 PM Active View
72. Annual Underground Sand cleaning work at Balaghat Mine(MOIL/20-21/ET/70) 19-06-2020 20-07-2020 20-07-2020 20-07-2020 03:30 PM Active View
73. Hiring of machinery for loading, unloading and transportation of Hutch from Hutch settling pond and hutch drain at Ukwa Mine(MOIL/20-21/ET/69) 19-06-2020 20-07-2020 20-07-2020 20-07-2020 03:30 PM Active View
74. Loading and unloading of steel section and various material with stacking at NOS Kandri Mine(MOIL/20-21/ET/71) 19-06-2020 20-07-2020 20-07-2020 20-07-2020 03:30 PM Active View
75. Handling of Manganese Ore in to Trucks for dispatch by Manual and Mechanized means at Ukwa Mine(MOIL/20-21/ET/68) 19-06-2020 20-07-2020 20-07-2020 20-07-2020 03:30 PM Active View
76. PURCHASE OF HT PANELS VARIOUS TYPES - 7 LOTS (only through e-procurement)(WE-22(ET-78) DT.18/06/2020) 18-06-2020 13-07-2020 13-07-2020 14-07-2020 03:30 PM Active View
77. e Procurement of HDPE Pipes, Bends and Pipe Ends(PUR/MOIL/C-1/199/WE-05/ET/80) 18-06-2020 14-07-2020 14-07-2020 15-07-2020 03:30 PM Active View
78. Providing Installation and testing of Piston type Accumulator with fittings in 150 HP winder(A-III/KAN/20-21/382) 17-06-2020 30-06-2020 30-06-2020 01-07-2020 04:30 PM Active View
79. Purchase of Smart Parking System at MOIL BHAWAN, Nagpur(M.S) - 1 Set.(1 Lot) (Only Through e-procurement)(WE-23(ET-77) DT.17/06/2020) 17-06-2020 07-07-2020 07-07-2020 08-07-2020 03:30 PM Active View
80. Picking and collection of SM Grade SPL 463 and SPL 481 from various dumps of Sitapatore Mine(MOIL/20-21/ET/67) 16-06-2020 16-07-2020 16-07-2020 16-07-2020 03:30 PM Active View
81. Production of 25 percent Mn. SM Grade ore BGL-523 from U/G old sub grade mineral reject material at Balaghat Mine(MOIL/20-21/ET/66) 16-06-2020 22-07-2020 22-07-2020 22-07-2020 03:30 PM Active View
82. Picking and collection of manganiferous rock from surface bed reject area at Parsoda Mine(MOIL/20-21/ET/65) 16-06-2020 16-07-2020 16-07-2020 16-07-2020 03:30 PM Active View
83. Repairing of Bucket Assy 5.6 cum 4 nos of TATAHitachi 1200 NO.3 Hyd Excavator operating at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/236) 15-06-2020 23-06-2020 23-06-2020 23-06-2020 04:30 PM Active View
84. Procurement of 1 no. Elecrically Operated Mono- block pump for IMB Plant at Dongri Buzurg mine(PUR/DB/20-21/ 277) 15-06-2020 10-07-2020 10-07-2020 10-07-2020 04:30 PM Active View
85. Terrace water proofing to RCC slab of old B type quarters 05 blocks at Chikla Mine(MOIL/20-21/ET/47) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
86. Maintenance and Operation of Sewage Treatment Plant at Munsar Mine.(MOIL/20-21/ET/50) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
87. Providing and fixing heat guard (Cool roof) for work shop building of Munsar Mine.(MOIL/20-21/ET/51) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
88. Construction of Security watch tower (2 nos) for surveillance and strengtheing of internal security at Kandri Mine(MOIL/20-21/ET/52) 15-06-2020 31-07-2020 31-07-2020 31-07-2020 03:30 PM Active View
89. Operation of pumps for drinking water supply at Wahitola, Kaichi and Chargaon camp at Munsar Mine(MOIL/20-21/ET/48) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
90. Concreting of x-cut between Ch.34 to Ch.42 at -300 Level for stope preparation at Gumgaon Mine(MOIL/20-21/ET/63) 15-06-2020 15-07-2020 15-07-2020 15-07-2020 03:30 PM Active View
91. Additional excavation in manganiferous rock between Ch.37 to Ch.42 at -300 Level at Gumgaon Mine(MOIL/20-21/ET/64) 15-06-2020 30-06-2020 30-06-2020 30-06-2020 03:30 PM Active View
92. Underground development at 9th Level and 8th Level North at Balaghat Mine(MOIL/20-21/ET/61) 15-06-2020 15-07-2020 15-07-2020 15-07-2020 03:30 PM Active View
93. Additional excavation in Mangeniferous rock at 1750 Level and 1650 Level at Ukwa Mine(MOIL/20-21/ET/62) 15-06-2020 15-07-2020 15-07-2020 15-07-2020 03:30 PM Active View
94. Maintenance and Operation of Solid waste Management plant at Munsar Mine.(MOIL/20-21/ET/49) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
95. Construction of New Administrative building including compound wall and vehical parking shed at Kandri Mine(MOIL/20-21/ET/53) 15-06-2020 31-07-2020 31-07-2020 31-07-2020 03:30 PM Active View
96. Repairing of RCC roof of Laboure and staff quarters of Gudma Camp colony ,prem Nagar(AGT/Civil/UK/LT/20-21/224) 13-06-2020 20-06-2020 20-06-2020 20-06-2020 04:30 PM Active View
97. TRANSPORTATION OF 538 MT OF BOTTOM FLY ASH FROM ADANI POWER PLANT, TIRORA TO CHIKLA MINE FOR UNDERGROUND BACKFILLING WORKS.(TE-04 Dt.13062020) 13-06-2020 25-06-2020 25-06-2020 25-06-2020 04:00 PM Active View
98. Dewatering of Satak open pit during rainy season(Bel/Mech/NIT/2020/445 Dated 10.06.2020) 12-06-2020 22-06-2020 22-06-2020 22-06-2020 03:30 PM Active View
99. Operation of pump at Beldongri Mine during Monsoon(Bel/Mech/NIT/2020/444 Dated 10.06.2020) 12-06-2020 22-06-2020 22-06-2020 22-06-2020 03:30 PM Active View
100. TWO BID SYSTEM FOR PURCHASE OF Failsafe Electro Hydraulic Thruster Brake suitable for 250HP motor FOR KANDRI MINE.(PUR/MOIL/GR.III/KD/2020-21/335) 12-06-2020 30-06-2020 30-06-2020 30-06-2020 04:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.