Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Providing and installation of tyre washer system at Chikla Mine(CIVIL/CH/T.E./21-22/1803) 28-08-2021 13-09-2021 13-09-2021 13-09-2021 04:30 PM Active View
2. Production of 25 percentMn. SM Grade ore (BGL-523) from U/G old sub grade mineral rejects material at Balaghat Mine(MINING/BGT/LT/AGT/21-22/717 DT. 26.08.2021) 27-08-2021 02-09-2021 02-09-2021 02-09-2021 04:30 PM Active View
3. REQUEST FOR EXPRESSION OF INTEREST FOR THE TRANSFER OF TECHNOLOGY FOR PRODUCTION OF ELECTROLYTIC MANGANESE METAL EMM AND OR DESIGN AND CONSTRUCTION OF A NEW ELECTROLYTIC MANGANESE METAL EMM PLANT.(SMG/EMM-EOI/21-22/01) 26-08-2021 15-11-2021 15-11-2021 15-11-2021 3:00 PM Active View
4. INSTALLATION OF ESE TYPE LIGHTING ARRESTOR FOR 33KV OUTDOOR SUBSTATION AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/704) 25-08-2021 31-08-2021 31-08-2021 31-08-2021 03:30 PM Active View
5. Repair of reduced Ore Shed at EMD Plant at DB Mine(DB/CIVIL/21-22/762 dt 21.08.2021) 25-08-2021 31-08-2021 31-08-2021 31-08-2021 04:30 PM Active View
6. C clas tender(PUR/MOIL/CH/C CLASS/21-22/783 Dt. 23.08.2021) 25-08-2021 25-09-2021 25-09-2021 25-09-2021 04:30 PM Active View
7. Collection of Garbage from camp colonies at Balaghat Mine(CIVI/BGT/LT/AGT/21-22/664 DT. 13/08/2021) 23-08-2021 30-08-2021 30-08-2021 30-08-2021 04:30 PM Active View
8. Cleaning of drain sewer line of camp colonies at Balaghat mine(CIVI/BGT/LT/AGT/21-22/669 DT. 17.08.2021) 23-08-2021 30-08-2021 30-08-2021 30-08-2021 04:30 PM Active View
9. Cleaning and shorting of surplus underground ROM at Ch 10000 BDC Section of Ukwa Mine(AGT/Min/UK/LT/21-22/ 678 Date 21.08.202) 23-08-2021 01-09-2021 01-09-2021 01-09-2021 04:30 PM Active View
10. 10 Mbps backup Internet Leased Line at BALAGHAT MINE(BGT/SYS/INTERNET/2021-22/677) 21-08-2021 06-09-2021 06-09-2021 06-09-2021 03:30 PM Active View
11. Repairing of Grouser shoe of BEML Dozer no-4 operating AT DONGRI BUZURG MINE(DB/MECH/21-22/JGM(MEC)/744) 20-08-2021 27-09-2021 27-09-2021 27-09-2021 04:30 PM Active View
12. WEBSITE SINGLE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR EIMCO ELECON MAKE SDL LHD UDM MACHINE(PUR/MOIL/C-5/ 27 /E- 53 / 90-M) 20-08-2021 09-09-2021 09-09-2021 13-09-2021 03:30 PM Active View
13. Construction of Guard Room at Mine Manager Bungalow at Ukwa Mine(Civil/UK/LT/21-22/951 Date- 16.08.2021) 19-08-2021 28-08-2021 28-08-2021 28-08-2021 04:30 PM Active View
14. Cleaning of accumulated sand form under ground at Kandri Mine(KD/mines/NIT/21-22/1530 dated 17.8.2021) 18-08-2021 27-08-2021 27-08-2021 27-08-2021 04:30 PM Active View
15. Maintenance and Operation of water Supply Scheme at Ukwa Mine(CIVIL/UK/LT/21-22/943) 17-08-2021 26-08-2021 26-08-2021 26-08-2021 04:30 PM Active View
16. PURCHASE OF C CLASS FASTENERS MATERIALS FOR KANDRI, MUNSAR, GUMGAON AND BELDONGRI MINE(TE-2 DT.16082021) 17-08-2021 04-09-2021 04-09-2021 04-09-2021 04:30 PM Active View
17. PURCHASE OF C CLASS MATERIALS FOR KANDRI, MUNSAR, GUMGAON AND BELDONGRI MINE(TE-3 DT.17082021) 17-08-2021 06-09-2021 06-09-2021 06-09-2021 04:30 PM Active View
18. PURCHASE OF C CLASS PIPE FITTINGS MATERIALS FOR KANDRI, MUNSAR, GUMGAON AND BELDONGRI MINE(TE-1 DT.16082021) 17-08-2021 03-09-2021 03-09-2021 03-09-2021 04:30 PM Active View
19. Construction of Cycle stand near IInd vertical shaft premises at Chikla Mine(CIVIL/CH/T.E./21-22/1634) 14-08-2021 28-08-2021 28-08-2021 28-08-2021 04:30 PM Active View
20. Purchasing of plants soil and fertilizer for new Afforestation for the year 2021 22 at Chikla Mine(CIVIL/CH/T.E./21-22/707) 14-08-2021 28-08-2021 28-08-2021 28-08-2021 04:30 PM Active View
21. Afforestation for the year 2021 22 at green belt jone thickness 7.5 M Width along lease boundary area at Chikla village in chikla mine(CIVIL/CH/T.E./21-22/702) 14-08-2021 28-08-2021 28-08-2021 28-08-2021 04:30 PM Active View
22. Afforestation for the year 2021 22 at green belt jone thickness 7.5 M Width along lease boundary area at Sitasoangi village in Chikla mine(CIVIL/CH/T.E./21-22/704) 14-08-2021 28-08-2021 28-08-2021 28-08-2021 04:30 PM Active View
23. Protection and Maintenance of plantation for New plantation 21 22 for three Months of security for plantation area green belt jone thickness 7.5 M Width along lease boundary area at Chikla Mine(CIVIL/CH/T.E./21-22/706) 14-08-2021 28-08-2021 28-08-2021 28-08-2021 04:30 PM Active View
24. TENDER DOCUMENTS FOR LOWERING OF 3C X 240 SQMM. CU. CABLE FROM 12TH LEVEL TO 13.5TH LEVEL AND 3C X 95 SQMM. CU. CABLE FROM 12TH LEVEL TO 15TH LEVEL AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/651) 13-08-2021 20-08-2021 20-08-2021 20-08-2021 03:30 PM Active View
25. Construction of Jaw Crusher Foundation in Nagara Plant at Ukwa Mine(AGT/CIVIL/UK/LT/21-22/632) 12-08-2021 19-08-2021 19-08-2021 19-08-2021 04:30 PM Active View
26. Waterproofing by means of laying torch shield on roof of old B and C type quarters at Kandri Mine.(KAN/CIVIL/NIT/21-22/1459 DT 10.08.2021) 10-08-2021 20-08-2021 20-08-2021 20-08-2021 04:30 PM Active View
27. Drilling of bore and fixing of Casing pipe for lowering electrical cable from surface to I st level of U/g for operating machinery at Kandri Mine.(KAN/CIVIL/NIT/21-22/1458 DT 10.08.2021) 10-08-2021 20-08-2021 20-08-2021 30-11--0001 04:30 PM Active View
28. Maintenance of Various gardens at Kandri Mine.(KAN/CIVIL/NIT/21-22/1435 DT 08.08.2021) 09-08-2021 17-08-2021 17-08-2021 17-08-2021 04:30 PM Active View
29. Operation of Pumps at Beldongri Mine(BL/MECH/21-22/ 1095) 09-08-2021 20-08-2021 20-08-2021 20-08-2021 04:30 PM Active View
30. Major Repairing of Tata Cummins Engine B5.9 180 20 model of Tata 4018 Trailer Moil Ltd Balaghat mine.(AGENT/BGT/MECH/MG/21-22/622) 09-08-2021 27-08-2021 27-08-2021 27-08-2021 04:30 PM Active View
31. PROCUREMENT OF OF CARRYING, IMPACT AND RETURN ROLLERS FOR CONVEYOR BELTS AT IMB PLANT OF BALAGHAT MINE.(PUR/MOIL/BGT/IMB/ROL/21-22/624) 09-08-2021 18-08-2021 18-08-2021 18-08-2021 04:30 PM Active View
32. PROCUREMENT OF COLD VULCANIZING SOLUTION AND HARDENER FOR CONVEYOR BELTS JOINING WORKS AT IMB PLANT BALAGHAT MINE.(PUR/MOIL/BGT/IMB/SOL/21-22/623) 09-08-2021 20-08-2021 20-08-2021 20-08-2021 04:30 PM Active View
33. FABRICATION OF GRIZZLY SEGEMENTS 8 NOS FOR IMB PLNAT AT DONGRI BUZURG MINE(DB/MECH/21-22/660) 08-08-2021 02-09-2021 02-09-2021 02-09-2021 04:30 PM Active View
34. Jigging washing and collection of reject ore from IMB Plant at Dongri Buzurg Mine(DB/SUR/21-22/1520) 07-08-2021 14-08-2021 14-08-2021 14-08-2021 03:30 PM Active View
35. Repairing Bucket Assy-6 nos of PC 450-1 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/21-22/JGM(MECH)/642) 03-08-2021 27-08-2021 27-08-2021 27-08-2021 04:30 PM Active View
36. Procurement of four numbers of SIEMENS Simatic ET 200SP Interface Modules for Chikla Mine(CH/ELECT/21-22/646) 03-08-2021 14-09-2021 14-09-2021 14-09-2021 04:30 PM Active View
37. Replacement of 6 mm/8mm/10 mm thick liner plates at 14.5 level loading station of Production shaft at Balaghat Mine(AGT/BGT/MECH/WIN/21-22/601) 02-08-2021 10-08-2021 10-08-2021 10-08-2021 04:30 PM Active View
38. Fabrication of 2 Nos of Vertical Brake Tie Rod for Holmes shaft Skip Winder at Balaghat Mine(AGENT/BGT/MECH/WIN/21-22/602) 02-08-2021 23-08-2021 23-08-2021 23-08-2021 04:30 PM Active View
39. Construction of first floor at new Medical Administrative Building along with site development work at MOIL Nagpur(MOIL/21-22/ET/57) 02-08-2021 03-09-2021 03-09-2021 03-09-2021 03:30 PM Active View
40. Construction of D.G.Set, Chimney foundation, switch and breaker room and shed over D.G.set at Balaghat Mine(MOIL/21-22/ET/56) 02-08-2021 01-09-2021 01-09-2021 01-09-2021 03:30 PM Active View
41. Laying of HDPE pipeline (OD-280 mm) for high head slurry pump at D.B.Mine for monsoon dewatering(MOIL/DB/MECH/2021-2022/628) 31-07-2021 10-08-2021 10-08-2021 10-08-2021 04:30 PM Active View
42. Supply of front caliper brake liners for BEML make BH60M dumper no 1 and no 2 Operating at Dongri Buzurg Mine(MOIL/PUR/DB/MECH/2021-2022/629) 31-07-2021 10-08-2021 10-08-2021 10-08-2021 04:30 PM Active View
43. e-procurement of ERW Steel Pipe(PUR/MOIL/C-1/197/WE-07/ET/64) 31-07-2021 06-08-2021 06-08-2021 06-08-2021 03:30 PM Active View
44. PURCHASE OF MISCELANEOUS ITEMS, WELDING ACCESSORIES , EMERY TAPE, WHITE CHINDI, GRINDING WHEEL ETC FOR GR-I BALAGHAT MINE(PUR/MOIL/BGT/ C CLASS/21-22/590) 29-07-2021 19-08-2021 19-08-2021 19-08-2021 04:30 PM Active View
45. Fabrication of Hose Fittings required in Underground at Balaghat Mine(AGT/BGT/MECH/HOSE FITTINGS/21-22/562) 28-07-2021 18-08-2021 18-08-2021 18-08-2021 04:30 PM Active View
46. PURCHASE OF SPARES FOR EIMCO ELECON MAKE SIDE DISCHARGE LOADER (SDL).(PUR/MOIL/C-5/ 27 /E- 52/ 72-M,Dt.27.07.2021) 27-07-2021 05-08-2021 05-08-2021 06-08-2021 03:30 PM Active View
47. PURCHASE OF SPARES FOR EIMCO ELECON MAKE SIDE DISCHARGE LOADER (SDL).(PUR/MOIL/C-5/ 27 /E- 52/ 72-M,Dt.27.07.2021) 27-07-2021 05-08-2021 05-08-2021 06-08-2021 03:30 PM Active View
48. e-Procurement of Diamond Drill Bits and Reamer Shells(PUR/MOIL/C-12/WE-02/ET/63) 27-07-2021 16-08-2021 16-08-2021 17-08-2021 03:30 PM Active View
49. Purchase of Roller For Conveyor Belt(DB/PUR/JGM/AGT/2021-22/589) 26-07-2021 24-08-2021 24-08-2021 24-08-2021 04:30 PM Active View
50. Shifting of Main ventilation fan from 160 level to 60 level of Chikla B section at Chikla Mine(CIVIL/CH/T.E./21-22/1439) 26-07-2021 10-08-2021 10-08-2021 10-08-2021 04:30 PM Active View
51. e-Procurement of Diamond Drilling Accessories(PUR/MOIL/C-12/23/WE-06/ET/62) 22-07-2021 17-08-2021 17-08-2021 18-08-2021 03:30 PM Active View
52. Cleaning of ROM recovered from North side of 5 No. Pit and Pit No.6 at Sitapatore Sukli Mine(MOIL/21-22/ET/59) 20-07-2021 20-08-2021 20-08-2021 20-08-2021 03:30 PM Active View
53. Repairing of Bucket Assy 5.6 CuM--4 NOS of Tata Hitachi 1200-3Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/21-22/JGM(MEC)/551) 19-07-2021 27-07-2021 27-07-2021 27-07-2021 04:30 PM Active View
54. Repairing of Bucket Assy of Tata Hitachi 450-1 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/21-22/JGM(MEC)/550) 19-07-2021 27-07-2021 27-07-2021 27-07-2021 04:30 PM Active View
55. Renovation of Holmes Shaft by replacing Buntons, Ladders, Platform and Fencing from surface to 12th Level at Balaghat Mine(MOIL/21-22/ET/54) 19-07-2021 19-08-2021 19-08-2021 19-08-2021 03:30 PM Active View
56. Design , Manufacturing and supply of New Double Helical Gear 1 No for the pinion shaft of Production shaft winding engine at Balaghat Mine.(AGENT/BGT/MECH/PS/21-22/516) 16-07-2021 05-08-2021 05-08-2021 05-08-2021 04:30 PM Active View
57. Renovation of Production Shaft by replacing Guide Rails at Balaghat Mine(MOIL/21-22/ET/55) 16-07-2021 16-08-2021 16-08-2021 16-08-2021 03:30 PM Active View
58. Drilling of 1 No. Bore Hole for Drinking Water Supply to Camp quarters near Dump (OCF) at Beldongri Mine(Civil/Bel/2021-22/886) 15-07-2021 21-07-2021 21-07-2021 21-07-2021 04:30 PM Active View
59. e-procurement of Safety Helmet(PUR/MOIL/C-1/189/WE-05/ET/61) 15-07-2021 16-08-2021 16-08-2021 17-08-2021 03:30 PM Active View
60. PURCHASE OF ROTATING ASSEMBLY FOR KIRLOSKA60 HP PUMP FOR IMB PLANT AT DONGRI BUZURG MINE(DB/MECH/21-22/MECH/397) 13-07-2021 05-08-2021 05-08-2021 05-08-2021 04:30 PM Active View
61. Fabrication Casting and Machining of Brass impeller Set of 120HP Mather and Platt multistage pump at Balaghat Mine(AGENT/BGT/MECH/PUMP/21-22/496) 13-07-2021 27-07-2021 27-07-2021 27-07-2021 04:30 PM Active View
62. Comprehensive Annual Maintenance Contract (CAMC) of Computers, Printers, UPSs installed at Balaghat Mine(BGT/SYSTEM/AMC/2021-22/487) 12-07-2021 26-07-2021 26-07-2021 26-07-2021 04:00 PM Active View
63. Comprehensive Annual Maintenance Contract of Computers, Printers, UPSs installed at Tirodi and Sitapatore Mine(BGT/SYSTEM/AMC/2021-22/488) 12-07-2021 26-07-2021 26-07-2021 26-07-2021 04:00 PM Active View
64. Purchase of Pipefitting, Manila Rope, Nylon Rope , Packing etc. for Gr-I Balaghat Mine.(PUR/MOIL/BGT/C CLASS/21-22/471) 10-07-2021 29-07-2021 29-07-2021 29-07-2021 04:30 PM Active View
65. OPERATION OF PUMPS FOR DRINKING WATER SUPPLY IN CAMP AREA AND OFFICER COLONY AT KANDRI MINE.(KAN/CIVIL/NIT/21-22/1077 DT 07.07.2021) 09-07-2021 17-07-2021 17-07-2021 17-07-2021 04:30 PM Active View
66. Purchase of Fasteners High Tension Bolts, Mild Steel Bolts, Wire Nails, Rose Nails, Teflon Tape ,M seal, Araldite , Holdite etc. for Gr-I Balaghat Mine(PUR/MOIL/BGT/C CLASS/21-22/470) 09-07-2021 29-07-2021 29-07-2021 29-07-2021 04:30 PM Active View
67. FABRICATION/PROCUREMENT OF PNEUMATIC CYLINDERS FOR HOLMES SHAFT 100 MT BUNKER GATE 2 NOS. AND FINGER GATE 2 NOS. OF ORE PASS AT BALAGHAT MINE.(PUR/MOIL/BGT/WINDER/21-22/465) 08-07-2021 28-07-2021 28-07-2021 28-07-2021 04:30 PM Active View
68. Interior and Exterior Painting works in Mine Manager Bungalow at Ukwa Mine(AGT/CIVIL/UK/LT/21-22/434) 07-07-2021 17-07-2021 17-07-2021 17-07-2021 04:30 PM Active View
69. REGULAR CLEANING UNBLOCKING OF MAIN BUNCKER ORE FLOW IN IMB PLANT AT DONGI BUZURG MINE(DB/MECH/21-22/JGM(MECH)/483) 05-07-2021 10-07-2021 10-07-2021 10-07-2021 04:30 PM Active View
70. Cons of additional transformer room at Ukwa Mine(Civil/UK/LT/21-22/710 Date 03.07.2021) 05-07-2021 14-07-2021 14-07-2021 14-07-2021 04:30 PM Active View
71. OUTSOURCING OF MAINTENANCE, DISTRIBUTION AND COLLECTION OF CAPLAMP FOR TWO MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/436) 05-07-2021 12-07-2021 12-07-2021 12-07-2021 03:30 PM Active View
72. Purchase of Black Gitti for UG concreting at Kandri Mine(KD/MINES/NIT/2021-22/ 1046) 05-07-2021 14-07-2021 14-07-2021 14-07-2021 04:30 PM Active View
73. Operation and Maintenance of new cells at EMD Plant Dongri Buzurg Mine(MOIL/DB/EMD/AJGM/TE /21-22/442) 29-06-2021 10-07-2021 10-07-2021 10-07-2021 04:30 PM Active View
74. Cleaning of Crushing Plant ROM By sorting, sizing and stacking at Munsar Mine(Munsar/Mining/LT/2021-22/50 Date 29.06.2021) 29-06-2021 06-07-2021 06-07-2021 06-07-2021 04:30 PM Active View
75. Comprehensive Annual Maintenance Contract (CAMC) of 127 Nos. of Air-Conditioners of MOIL Ltd Nagpur(MOIL/21-22/ET/52) 29-06-2021 28-07-2021 28-07-2021 28-07-2021 03:30 PM Active View
76. Purchase of DOLOMITE with Transportation - 4000 MT(MOIL/21-22/ET-04 dt.28.06.2021) 28-06-2021 07-07-2021 07-07-2021 08-07-2021 03:30 PM Active View
77. Annual repairs to camp quarters at Gumgaon Mine.(MOIL/21-22/ET/28) 28-06-2021 27-07-2021 27-07-2021 27-07-2021 03:30 PM Active View
78. Engagement of Architect and design engineering firm for Construction of residential quarters at various Mines Phase IV(MOIL/21-22/ET/30) 28-06-2021 27-07-2021 27-07-2021 27-07-2021 03:30 PM Active View
79. Operation of Pumps for dewatering at both Satak open pit(BEL/MECH/21-22/708) 25-06-2021 05-07-2021 05-07-2021 05-07-2021 04:30 PM Active View
80. Manufacturing of New Input Pinion shaft 1 No. for the Gear Train Unit in Production shaft winding engine at Balaghat Mine(AGENT/BGT/MECH/PS /21-22/380) 25-06-2021 15-07-2021 15-07-2021 15-07-2021 04:30 PM Active View
81. Operation of Pumps at Beldongri Mine(BEL/MECH/21-22/699) 24-06-2021 02-07-2021 02-07-2021 02-07-2021 04:30 PM Active View
82. Underground vertical development from 13.5 Level to 15.00 Level at Balaghat Mine(MOIL/21-22/ET/48) 23-06-2021 23-07-2021 23-07-2021 23-07-2021 03:30 PM Active View
83. Washing Picking and collection of Ferro grade and SM grade ore TD-4505 TDL-439 TDL-499 and TDL-469 from east side of South Staff Quarter dump at Tirodi Mine(MOIL/21-22/ET/51) 23-06-2021 08-07-2021 08-07-2021 08-07-2021 03:30 PM Active View
84. Cleaning of Underground ROM at Beldongri Mine(MOIL/21-22/ET/47) 23-06-2021 08-07-2021 08-07-2021 08-07-2021 03:30 PM Active View
85. Transportation of sand from Kalaphata Ghat situated on Pench river to Munsar Kandri and Beldongri Mine(MOIL/21-22/ET/45) 22-06-2021 22-07-2021 22-07-2021 22-07-2021 03:30 PM Active View
86. Transportation of sand from Gondegaon Mine WCL to Munsar Kandri and Beldongri Mine(MOIL/21-22/ET/46) 22-06-2021 22-07-2021 22-07-2021 22-07-2021 03:30 PM Active View
87. R C C roof repairs to camp quarters at Chikla Mine(CIVIL/CH/T.E./21-22/1029) 22-06-2021 03-07-0021 03-07-2021 03-07-2021 04:30 PM Active View
88. Production of Aggregates and M-Sand from waste rock generated during development of hang wall portion from CH.25 to CH.42 by contractual means at Dongri Buzurg Mine to make the best out of waste(MOIL/21-22/ET/43) 22-06-2021 27-07-2021 27-07-2021 27-07-2021 03:30 PM Active View
89. Handling and dispatch of ore at Sitapatore Mine.TRD/Civil/2020-21/364 Dated 18/06/2021) 19-06-2021 25-06-2021 25-06-2021 25-06-2021 03:30 PM Active View
90. OUTSOURCING FOR MONITORING AND OPERATION OF 33KV SUBSTATION FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-2/355) 18-06-2021 24-06-2021 24-06-2021 24-06-2021 03:30 PM Active View
91. Repair RCC Roof of Labour and Staff Quarter(AGT/CIVIL/UK/LT/20-21/342) 18-06-2021 26-06-2021 26-06-2021 26-06-2021 04:30 PM Active View
92. Purchase of Oil and Lubricants - 29 Items. (Only Through e-procurement)(WE-85(ET-49_and_ET-50) dt.15.06.2021) 16-06-2021 06-07-2021 06-07-2021 07-07-2021 03:30 Pm Active View
93. Outsourcing of maintenance and repair of LT and HT Overhead lines of Chikla Mines for a period of 9 months.(CH/ELECT/21-22/374) 15-06-2021 29-06-2021 29-06-2021 29-06-2021 04:30 PM Active View
94. Outsourcing of distribution, Collection and Cleaning of cap lamps of Chikla Mines for a period of 3 months.(CH/ELECT/21-22/372) 14-06-2021 23-06-2021 23-06-2021 23-06-2021 04:30 PM Active View
95. DAILY (HIGH SPEED DIESEL FILLING IN HEMMS AT DONGRIBUZURG MINE(DB/MECH/21-22/JGM(MEC)/356) 14-06-2021 18-06-2021 18-06-2021 18-06-2021 04:30 PM Active View
96. Regular Cleaning/unblocking of main bunker ore flow in IMB Plant at Dongr Buzurg Mine.(DB/MECH/21-22/JGM(MEC)/376) 14-06-2021 22-06-2021 22-06-2021 22-06-2021 04:30 PM Active View
97. Cleaning of Underground Sumps and Underground Drains under Monsoon Preparatory Works at Munsar Mine.(Mun/Mining/LT/2021-22/373 Date 12.05.2021) 14-06-2021 21-06-2021 21-06-2021 21-06-2021 04:30 PM Active View
98. Limited tender inviting in single bid system for Housekeeping work at C and s plant at Chikla mine(CH/Agent/Mech/21-22/358) 11-06-2021 21-06-2021 21-06-2021 21-06-2021 03:30 PM Active View
99. Replacement of Liner Plate(8/10mmm) of Transfer chute, Bunkers and repair of Transfer chutes/Bunker at various location of IMB plant at Balaghat Mine(AGENT/BGT/MECH/IMB/21-22/315) 09-06-2021 16-06-2021 16-06-2021 16-06-2021 04:30 PM Active View
100. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF PARKER MAKE SINGLE SOLENOID VALVE(PUR/MOIL/C-11/131/E-51/31-M Dt. 09-06-2021) 09-06-2021 30-06-2021 30-06-2021 30-06-2021 03:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.