Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. PURCHASE OF VIBRATOR ASSEMBLY (MAKE-MS TRF LIMITED, JAMSHEDPUR) - 1 SET. (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/212/E-72/1913-M DT.24/01/2017) 24-01-2017 13-02-2017 13-02-2017 13-02-2017 03:30 PM Active View
2. Designing supply fabrication installation and commissioning of Electronic Belt Weigher system for IMB Plant Balaghat Mine(DGM/BGT/MECH/IMBP/16-17/7394) 24-01-2017 14-02-2017 14-02-2017 14-02-2017 04:30 PM Active View
3. PURCHASE OF VIBRATOR ASSEMBLY (MAKE-MS TRF LIMITED, JAMSHEDPUR) - 1 SET. (AS PER ANNEXURE - A ENCLOSED). (PUR/MOIL/C-4/212/E-72/1913-M DT.24/01/2017) 24-01-2017 27-02-2017 27-02-2017 27-02-2017 3:30 PM Active View
4. Designing supply fabrication installation and commissioning of Electronic Belt Weigher system for IMB Plant Balaghat Mine (DGM/BGT/MECH/IMBP/16-17/7394) 24-01-2017 24-02-2017 24-02-2017 24-02-2017 4:30 PM Active View
5. Designing supply fabrication installation and commissioning of Electronic Belt Weigher system for IMB Plant Balaghat Mine (DGM/BGT/MECH/IMBP/16-17/7394) 24-01-2017 01-03-2017 01-03-2017 01-03-2017 4:30 PM Active View
6. Construction of Doctor cabin(Bel/Civil/AGT/16-17/2966) 23-01-2017 30-01-2017 30-01-2017 30-01-2017 04:30 PM Active View
7. Development Works and Laying of Paver Block for the parking zone infront of Integrated Manganese Beneficiation Plant, IMB at Balaghat Mine(Civil/BGT/T.E./2016-17/7391 Dated 23.01.2017) 23-01-2017 31-01-2017 31-01-2017 31-01-2017 04:00 PM Active View
8. Construction and erection of Precast Pre stressed concrete elements for underground supports at Balaghat Mine(Civil/HO/16-17/BGT/81) 23-01-2017 23-02-2017 23-02-2017 23-02-2017 03:30 PM Active View
9. Construction of Water Supply Scheme at Dongribuzurg Mine.(MOIL/16-17/ET/166) 23-01-2017 23-02-2017 23-02-2017 23-02-2017 03:30 PM Active View
10. Construction of Partition walls for stacking Yard ,Retaining walls at Ferro Manganese Plant of Balaghat Mine.(Civil/HO/16-17/BGT/80) 23-01-2017 23-02-2017 23-02-2017 23-02-2017 03:30 PM Active View
11. Construction of Vehicle Shed With washing pit at Gumgaon Mine.(MOIL/16-17/ET/164) 23-01-2017 23-02-2017 23-02-2017 23-02-2017 03:30 PM Active View
12. LOADING AND UNLOADING OF STEEL SECTIONS, CEMENT BAGS AND OTHER MATERIAL WITH STACKING AT BALAGHAT MINE STORE(Gr.-I/CGM(PR)/CONT/LOADING/27/BGT/2016-17/15) 21-01-2017 30-01-2017 30-01-2017 30-01-2017 03:30 PM Active View
13. Handling and Despatch of ore at Munsar Mine (MOIL/16-17/ET/160) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
14. Handling and Despatch of ore at Beldongri Mine (MOIL/16-17/ET/157) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
15. Handling and Despatch of ore at Tirodi Mine (MOIL/16-17/ET/155) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
16. Handling and Despatch of ore at Kandri Mine (MOIL/16-17/ET/159) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
17. Handling and Despatch of ore at Sitapatore Mine (MOIL/16-17/ET/156 ) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
18. Handling and Despatch of ore at Gumgaon Mine (MOIL/16-17/ET/158 ) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
19. Handling and Despatch of ore at Dongri Buzurg Mine (MOIL/16-17/ET/154) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
20. Handling and Despatch of ore at Chikla Mine (MOIL/16-17/ET/153 ) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
21. Handling and Despatch of ore at Balaghat Mine (MOIL/16-17/ET/152) 21-01-2017 23-02-2017 23-02-2017 23-02-2017 3:30 PM Active View
22. Repair of water supply pipeline from Bhatera Pumping Station to Balaghat Mine and installation of air valves at Bhatera Pumping Station towards water supply scheme at Balaghat Mine(83/Civil/BGT/2016-17/7281 Date 17.01.2017) 20-01-2017 27-01-2017 27-01-2017 27-01-2017 04:00 PM Active View
23. Development Works infront of Siding Office and Sample Preparation Room at Balaghat Mine(Civil/BGT/T.E/2016-17/7278 Date 17.01.2017) 19-01-2017 25-01-2017 25-01-2017 25-01-2017 04:00 PM Active View
24. PURCHASE OF OFFICE FURNITURE, MAKE GODREJ - 14 ITEMS.(AS PER ANNEXURE - A ENCLOSED.(PUR/MOIL/C-4/54/E-70/1884-M DT.19/01/2017) 19-01-2017 08-02-2017 08-02-2017 08-02-2017 03:30 PM Active View
25. Obtaining Environmental Clearance for Gumgaon, Kodegaon and Tegai manganese mine over an area of 126.84 Hec.(. Sr.DGM(Mines)/ EC-Gumgaon/2016-17/ 03) 18-01-2017 27-01-2017 27-01-2017 27-01-2017 03:00 PM Active View
26. Making kaccha road inside the NEERI plantation area from Dr Juwarkar statue upto Incline haulage road at Gumgaon Mine(CIVIL/16-17/GUM/3460 Date 16.01.2017) 18-01-2017 27-01-2017 27-01-2017 27-01-2017 04:30 PM Active View
27. Obtaining Environmental Clearance for Satak manganese mine over an area of 5.62 Hec(Sr.DGM(Mines)/ SE/EC-Satak/2016-17/02) 18-01-2017 27-01-2017 27-01-2017 27-01-2017 03:00 PM Active View
28. Renovation works of Mine Magzine at Gumgaon Mine(CIVIL/16-17/GUM/3459 Date 16.01.2017) 18-01-2017 27-01-2017 27-01-2017 27-01-2017 04:30 PM Active View
29. BLANKET RATE CONTRACT FOR ONE YEAR FOR SUPPLY OF VARIOUS TYPE OF PAINTS, THINNER etc.(WE-107 DT.18/01/2017(e-Tenderno.MOIL/16-17/ET/168)) 18-01-2017 14-02-2017 14-02-2017 14-02-2017 03:30 PM Active View
30. Construction of Sub-Station Building for Housing L.T. and H.T. Switchgear along with Transformer Room for II nd Vertical Shaft at Ukwa Mine.(Civil /HO/16-17/ UK/82 Dt 17/01/2017) 18-01-2017 17-02-2017 17-02-2017 17-02-2017 03:30 PM Active View
31. Purchase of Agitator Assembly(PUR/MOIL/C-11/43/WE-105 (MOIL/16-17/ET/165)) 18-01-2017 27-02-2017 27-02-2017 27-02-2017 03:30 PM Active View
32. Drop raise from 3rd to 4th and its allied work at Munsar Mine(GM(M)-III/CONT/40/UG-DEV/MUN/16-17/48) 17-01-2017 24-01-2017 24-01-2017 24-01-2017 03:30 PM Active View
33. Outsourcing the assignment of tub pushing in OCF at Munsar mine (Mun/Mine/HO/Agent/16-17/3875) 16-01-2017 25-01-2017 25-01-2017 25-01-2017 4:30 PM Active View
34. Outsourcing the assignment of tub pushing in OCF at Munsar mine (Mun/Mine/HO/Agent/16-17/3875) 16-01-2017 25-01-2017 25-01-2017 25-01-2017 4:30 PM Active View
35. Dismantlling of old quarters of kaichi camp at Munsar Mine. (Mun/ C/HO/Agent/16-17/ 3874 ) 16-01-2017 25-01-2017 25-01-2017 25-01-2017 4:30 PM Active View
36. Collection and stacking of Mn ore through Vibrating screen at Munsar Mine (GM(M)-III/CONT/VBS/47/MUN/16-17/49) 16-01-2017 24-01-2017 24-01-2017 24-01-2017 3:30 PM Active View
37. Picking and collection of SM gr. (KDL-435) and (KDL-446) through off the pit working at Kandri Mine (GM(M)-III/CONT/50/SM/KAN/16-17/49) 16-01-2017 10-02-2017 10-02-2017 10-02-2017 3:30 PM Active View
38. Additional excavation in manganiferrous rock for concreting of cross-cut, manways and ore pass etc in underground at Munsar Mine (GM(M)-III/CONT/UG-DEV/41/GUM/16-17/48) 16-01-2017 10-02-2017 10-02-2017 10-02-2017 3:30 PM Active View
39. Annual repairs and maintenance contract for Domestic electrical installation of residential and non-residential building of Munsar mine (ELECT/MUN/ADGM/16-17/1235) 15-01-2017 30-01-2017 30-01-2017 30-01-2017 3:30 PM Active View
40. Fabrication of roof bolt on labour rate basis at Gumgaon Mine (MECH/GUM/16-17/3442 DT 14.01.2017) 14-01-2017 23-01-2017 23-01-2017 23-01-2017 4:30 PM Active View
41. Construction of barbed wire fencing at near 6 No. at Tirodi Mine (TRD/CIVIL/A/2016-17/2969 Dt 12.01.2017) 14-01-2017 21-01-2017 21-01-2017 21-01-2017 4:30 PM Active View
42. Purchase of Gravel (Black Gitti) for U/G Concreting work at Ukwa Mine (Gr.-I/CGM(PR)/CONT/GITTI/26/UK/2016-17/14) 13-01-2017 23-01-2017 23-01-2017 23-01-2017 3:30 PM Active View
43. PURCHASE OF SPARES FOR KIRLOSKAR MAKE COMPRESSOR (PUR/MOIL/C-5/38/E-63/1725-M ) 12-01-2017 25-01-2017 25-01-2017 25-01-2017 3:30 PM Active View
44. PURCHASE OF SAPRES FOR DRUM COUPLING (PUR/MOIL/C-5/33/E-64/1752-M) 12-01-2017 25-01-2017 25-01-2017 25-01-2017 3:30 PM Active View
45. Const of retaining cum barricade wall back side of pit office at Gumgaon Mine (Civil/16-17/GUM/3417 Date 10.01.2017) 12-01-2017 20-01-2017 20-01-2017 20-01-2017 4:00 PM Active View
46. Pathway and brick paving in front of Bio diversity park at Gumgaon Mine (Civil/16-17/Gum/3416 Date 10.01.2017) 12-01-2017 20-01-2017 20-01-2017 20-01-2017 4:00 PM Active View
47. PURCHASE OF SPARES FOR VENTRA LOCOMOTIVE (PUR/MOIL/C-5/58/E-65/1753-M ) 12-01-2017 30-01-2017 30-01-2017 30-01-2017 3:30 PM Active View
48. Operation and minor maintenance of water supply scheme at MOIL Bhawan, CMD Bungalow, C.M.S. with Type A Quarters and West Court with Guest House, Transit House and Bunsivilla compound area, MOIL, Nagpur. (Civil /HO/16-17 /HO/79 Dt- 11/01/2017) 12-01-2017 27-01-2017 27-01-2017 27-01-2017 3:30 PM Active View
49. Washing, picking and collection of material from East side of A dump (waste dump) at Tirodi Mine(MOIL/16-17/ET/145) 12-01-2017 31-01-2017 31-01-2017 31-01-2017 03:30 PM Active View
50. Wired Wireless Internet Leased Line at MOIL Limited ( Sys/Internet/2016-17/16 ) 12-01-2017 02-02-2017 02-02-2017 02-02-2017 3:30 PM Active View
51. e-procurement of Belt Conveyor Roller/Idler -38 Items (WE-106 e-tender No.MOIL/16-17/ET-162, Dt.12.01.17) 12-01-2017 28-02-2017 28-02-2017 28-02-2017 3:30 PM Active View
52. Requirement of chock sleeper at Gumgaon Mine (Mining/Gum/16-17/3418 dATE 10.01.2017) 11-01-2017 20-01-2017 20-01-2017 20-01-2017 4:30 PM Active View
53. e-procurement of Cage Suspension Gear - 3 items. (WE-100 e-tender No.MOIL/16-17/ET-161, Dt.11.01.17) 11-01-2017 14-02-2017 14-02-2017 14-02-2017 3:30 PM Active View
54. Supplying, providing, installation and commissioning of Centralized UPS and required wiring for computers of office buildings at Balaghat, Tirodi in MP and Chikla, Dongri Buzurg, Gumgaon, Munsar and Kandri Mine in Maharashtra. (SDGM(E)/86/ HO/16-17/ 280) 10-01-2017 30-01-2017 30-01-2017 30-01-2017 3:30 PM Active View
55. Construction of Gard Room, Waiting Room near Mine Gate at Kandri Mine. (CIVIL/HO/16-17/KAN/77 Dt 09/01/2017) 10-01-2017 31-01-2017 31-01-2017 31-01-2017 3:30 PM Active View
56. Washing, Picking and collection of material from South West side of A dump at Tirodi Mine (Gr.II/GM(M)/CONT/R-Dump/61/TRD/2016-17/48) 09-01-2017 18-01-2017 18-01-2017 18-01-2017 3:30 PM Active View
57. Picking and collection of material from diluted ROM at South Pit of Tirodi Mine. (Gr.II/GM(M)/CONT/CL-ROM/62/TRD/2016-17/49) 09-01-2017 18-01-2017 18-01-2017 18-01-2017 3:30 PM Active View
58. Hiring of Services of Architect and Design Engineering Firm for proposed Construction of surface Infrastructure Buildings for 2 Vertical Shaft at Munsar Mine.(The Project Cost is estimated to Rs. 4,00,00,000/- approximately) (Civil /HO/16-17/ Mun/76 Dt 09 09-01-2017 09-02-2017 09-02-2017 09-02-2017 3:30 PM Active View
59. Underground Development work at -470 L of vertical section at Chikla Mine. (Gr.II/GM(M)/CONT/UG-DEV/60/CH/2016-17/47) 07-01-2017 17-01-2017 17-01-2017 17-01-2017 3:30 PM Active View
60. Breaking of steam coal into size range 25-75mm and stacking at Ferro Manganese Plant, Balaghat Mine. (BGT/FMP/TE/2016-17/834 Dated 04.01.2017) 06-01-2017 12-01-2017 12-01-2017 12-01-2017 4:30 PM Active View
61. Making and Supply of Stemming Material (Mud Plug) at Balaghat Mine (Gr.-I/CGM(PR)/CONT/MUD PLUG/25/BGT/2016-17/13) 06-01-2017 16-01-2017 16-01-2017 16-01-2017 3:30 PM Active View
62. Hiring of Architectural and Structural consultant for Construction of Guest House at Kandri Mine. ( The Project cost is estimated to Rs. 95,00,000 /- approximately)(CIVIL/HO/16-17/KAN/75 Dt- 05/01/2017) 06-01-2017 19-01-2017 19-01-2017 19-01-2017 03:30 PM Active View
63. Construction of Sewerage Treatment Plant at MOIL Bhavan Nagpur(Civil/HO/2016-17/74) 06-01-2017 31-01-2017 31-01-2017 31-01-2017 03:30 PM Active View
64. Sinking of new fan drift and allied development at Chikla Mine (MOIL/16-17/ET/150) 06-01-2017 07-02-2017 07-02-2017 07-02-2017 3:30 PM Active View
65. Steam Coal 650 MT(PUR/MOIL/C-11/102/WE-92 (MOIL/16-17/ET/148)) 05-01-2017 25-01-2017 25-01-2017 25-01-2017 03:30 PM Active View
66. Sodium Carbonate(PUR/MOIL/C-11/4/WE-96 (MOIL/16-17/ET/146)) 05-01-2017 03-02-2017 03-02-2017 03-02-2017 03:30 PM Active View
67. Picking and collection of 3rd grade and LGHS ore from diluted ROM at South pit of Tirodi Mine(MOIL/16-17/ET/147) 05-01-2017 31-01-2017 31-01-2017 31-01-2017 03:30 PM Active View
68. e-procurement of G.I.Wire Netting and S.S.Screen Cloth -9 items(WE-97 e-tender No.MOIL/16-17/ET-151, Dt.05.01.2017) 05-01-2017 09-02-2017 09-02-2017 09-02-2017 03:30 PM Active View
69. Picking and collection of small 25 per Mn (GML-464) from dumps through off the pit working at Gumgaon Mine(GM(M)-III/CONT/48/R-DUMP/GUM/16-17/47) 04-01-2017 11-01-2017 11-01-2017 11-01-2017 03:30 PM Active View
70. Underground concreting for stope block preparation at Munsar Mine(GM(M)-III/CONT/UG-CONC/49/MUN/16-17/46) 04-01-2017 11-01-2017 11-01-2017 11-01-2017 03:30 PM Active View
71. Rate Contract For One Year For Supply Of COMPRESSED OXYGEN GAS AND DISSOLVED ACETYLENE GAS(C-11/115/WE-93 (MOIL/16-17/ET/149)) 04-01-2017 25-01-2017 25-01-2017 25-01-2017 03:30 PM Active View
72. PURCHASE OF GREASE GUNS.(PUR/MOIL/C-1/203/E-68/1794-M Dt.04/01/2017) 04-01-2017 27-01-2017 27-01-2017 27-01-2017 03:30 PM Active View
73. Dump cutting for construction of New OCF at Munsar Mine(GM(M)-III/CONT/DUMP/MUN/16-17/44) 03-01-2017 10-01-2017 10-01-2017 10-01-2017 03:30 PM Active View
74. Collection and stacking of Mn ore through Vibrating screen at Munsar Mine(GM(M)-III/CONT/VBS/MUN/16-17/45) 03-01-2017 10-01-2017 10-01-2017 10-01-2017 03:30 PM Active View
75. Drilling of Borehole with pump and pipe line at Gudma camp Ukwa Mine(A andSr DyGM(M)/Civil/UM/16-17/2803) 03-01-2017 17-01-2017 17-01-2017 17-01-2017 04:30 PM Active View
76. Loading and unloading of explosives for blasting at Tirodi Mine.(Gr-II/GM(M)/CONT/EXP/56/TRD/2016-17/43) 31-12-2016 10-01-2017 10-01-2017 10-01-2017 03:30 PM Active View
77. Cleaning of surplus ROM of Pit No. 5 at Sitapatore and Sukli Mine(Gr-II/GM(M)/CONT/CL-ROM/58/SITA/2016-17/44) 31-12-2016 10-01-2017 10-01-2017 10-01-2017 03:30 PM Active View
78. Picking and collection of material from contaminated Low grade ROM at Dongri Buzurg Mine(GR.-II/GM(M)/CONT/CL-ROM/57/DB/2016-17/46) 31-12-2016 10-01-2017 10-01-2017 10-01-2017 03:30 PM Active View
79. Picking and collection of material from waste dumps at Sitapatore mine(GR.-II/GM(M)/CONT/R-DUMP/59/SITA/2016-17/45) 30-12-2016 10-01-2017 10-01-2017 10-01-2017 03:30 PM Active View
80. Hiring of Hydrologist and structural consultant services for water supply scheme at Gumgaon Mine(CIVIL/HO/16-17/GUM/73 DT. 28/12/2016) 29-12-2016 17-01-2017 17-01-2017 17-01-2017 03:30 PM Active View
81. Renovation of existing old Temples near Main Entrance Gate at MOIL Bhawan and East Court, MOIL, Nagpur.(Civil /HO/16-17 /HO/70 Dated - 27/12/2016) 28-12-2016 04-01-2017 04-01-2017 04-01-2017 03:30 PM Active View
82. Widening of existing approach Tar Road, Construction of entrance display board including implementation of mechanized automated gate at Main Security Check Post at Balaghat Mine.(Civil /HO/16-17 /BGT/72 Dated - 27/12/2016) 28-12-2016 12-01-2017 12-01-2017 12-01-2017 03:30 PM Active View
83. Construction of toilets at various places in Mine area at Balaghat Mine(Civil /HO/16-17 /BGT/71 Dated - 27/12/2016) 28-12-2016 12-01-2017 12-01-2017 12-01-2017 03:30 PM Active View
84. MAINTAINANCE OF MINE MANAGER BUNGLOW ADMINISTRATIVE BUILDING AND GARDEN SITAPATORE MINE(S-S/CIVIL/HO/2016-17 DATE 18/12/2016) 23-12-2016 31-12-2016 31-12-2016 31-12-2016 04:00 PM Active View
85. Unloading of raw materials at Ferro Manganese Plant Balaghat Mine(BGT/FMP/TE/2016-17/806 Date 22.12.2016) 23-12-2016 03-01-2017 03-01-2017 03-01-2017 04:30 PM Active View
86. Cleaning of surplus underground ROM at Beldongri Mine(GM(M)-III/CONT/46/ROM/BEL/2016-17/43) 23-12-2016 30-12-2016 30-12-2016 30-12-2016 03:30 PM Active View
87. Construction of retaining wall along the road side from 100 level to mine canteen at Chikla mine(Civil /HO/16-17 /CH/69 Dated - 23/12/2016) 23-12-2016 04-01-2017 04-01-2017 04-01-2017 03:30 PM Active View
88. Maintenance of existing fire protection system for MOIL Bhawan Nagpur(Civil /HO/16-17 /HO/68 Dated - 23/12/2016) 23-12-2016 04-01-2017 04-01-2017 04-01-2017 03:30 PM Active View
89. Laying of WBM road from old B type to rest house at Gumgaon Mine(CIVIL/16-17/GUM/3243 DATE 12.12.2016) 22-12-2016 28-12-2016 28-12-2016 28-12-2016 04:30 PM Active View
90. Picking and collection of Ferro grade ore from dumps at Munsar Mine(GM(M)-III/CONT/44/DUMP/MUN/2016-17/42) 22-12-2016 29-12-2016 29-12-2016 29-12-2016 03:30 PM Active View
91. Preperation of kaccha road inside the Neeri plantation area at Gumgaon Mine(CIVIL/16-17/GUM/3295 DATE 21.12.2016) 22-12-2016 30-12-2016 30-12-2016 30-12-2016 04:30 PM Active View
92. Drilling of 57 mm dia drill holes for installing cable bolts in Magneferous rock at -200 lvl at Gumgaon Mine(Mining/Gum/16-17/3297 dt 21.12.2016) 22-12-2016 10-01-2017 10-01-2017 10-01-2017 04:30 PM Active View
93. Concrete lining of Cross cut in new wide ore body at -200 LVL at Gumgaon(Mining/Gum/16-17/3296 dt 21.12.2016) 22-12-2016 11-01-2017 11-01-2017 11-01-2017 04:30 PM Active View
94. Construction of Gard Room, Waiting Room near Mine Gate at Kandri Mine. (CIVIL/HO/16- 17/KAN/67 Dt- 20/12/2016) 21-12-2016 04-01-2017 04-01-2017 04-01-2017 3:30 PM Active View
95. Construction of Siding Office near Siding at Kandri Mine.(CIVIL/HO/16-17/KAN/66 Dt- 20/12/2016) 21-12-2016 04-01-2017 04-01-2017 04-01-2017 03:30 PM Active View
96. SUPPLY, INSTALLATION, ERRECTION, TESTING AND COMMISSIONING OF WATER SOFTNER PLANT FOR NEW COMPRESSOR HOUSE AT MUNSAR MINE (A-III/MUN/16-17/1137 ) 21-12-2016 14-01-2017 14-01-2017 14-01-2017 4:30 PM Active View
97. OUT SOURCING OF PUMPING OPERATION AT UNDERGROUND VERTICAL SHAFT AT MUNSAR MINE FOR 12 MONTHS (A-III/MUN/16-17/1136 ) 21-12-2016 13-01-2017 13-01-2017 13-01-2017 03:30 PM Active View
98. TIMBER (Only Through e-procurement) (WE-76 DT.21/12/2016, e-TENDER NO.MOIL/16-17/ET/143) 21-12-2016 20-01-2017 20-01-2017 20-01-2017 03:30 PM Active View
99. Supply of black gitti at Gumgaon Mine(GM(M)-III/CONT/Gitti/43/GUM/2016-17/41) 19-12-2016 27-12-2016 27-12-2016 27-12-2016 03:30 PM Active View
100. Maintenance and operation of water supply scheme at Balaghat Mine.(Civil/BGT/Water-Supply/2016-17/6501 Date 16.12.16) 17-12-2016 23-12-2016 23-12-2016 23-12-2016 04:30 PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (205) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.