Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Construction of Cat walk from landing level platform of vertical shaft at Munsar Mine.(CIVIL/HO/15-16/MUN /42 Dt- 23/09/2015) 24-09-2015 15-10-2015 15-10-2015 15-10-2015 3:30 PM Active View
2. Renovation of Holmes shaft Replacement of Guide rails of Holmes shaft cage and skip winder at Balaghat Mine(SDGM(MECH)/TENDER-HS-BGT/2015-16/527) 24-09-2015 15-10-2015 15-10-2015 15-10-2015 3:30 PM Active View
3. SERVERS, SAN STORAGE, NETWORK COMPONENTS AND OTHER HARDWARE ACCESSORIES AND SOFTWARE FOR ERP DATA CENTRE - 14 ITEMS (AS PER ANNEXURE - C ENCLOSED)( WE-52 DT.24/09/2015, e-TENDER NO.MOIL/15-16/ET/57) 24-09-2015 27-10-2015 27-10-2015 27-10-2015 3:30 PM Active View
4. SERVERS, SAN STORAGE, NETWORK COMPONENTS AND OTHER HARDWARE ACCESSORIES AND SOFTWARE FOR ERP DATA CENTRE - 14 ITEMS (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-52 DT.24/09/2015, e-TENDER NO.MOIL/15-16/ET/57) 24-09-2015 09-11-2015 09-11-2015 09-11-2015 3:30 PM Active View
5. Supply of INSULIN-7 items. (WE-59 e-tender No.MOIL/15-16/ET-56) 24-09-2015 10-11-2015 10-11-2015 10-11-2015 3:30 PM Active View
6. Purchase of Cross Bits 57mm Dia for Cable Bolting Machine(PUR/MOIL/C-5/12/WE-46/972-M (MOIL/15-16/ET/54) 22-09-2015 21-10-2015 21-10-2015 21-10-2015 3:30 PM Active View
7. Construction of Cement concrete Road at Village Rajapur and village Chikla Under MOIL CSR.( CIVIL/HO/15-16 /CH/CSR/40 Dt- 22/09/2015) 22-09-2015 09-10-2015 09-10-2015 09-10-2015 3:30 PM Active View
8. Supply, installation,errection ,testing and commissioning of water softner plant for new compressor house at Munsar Mine (A-III/MUN/15-16/1261 ) 22-09-2015 10-10-2015 10-10-2015 10-10-2015 4:30 PM Active View
9. Purchase of Cross Bits 57mm Dia for Cable Bolting Machine(PUR/MOIL/C-5/12/WE-46/972-M (MOIL/15-16/ET/54) 22-09-2015 21-10-2015 21-10-2015 21-10-2015 3:30 PM Active View
10. Purchase of Accessories for Cable Bolting Machine (PUR/MOIL/C-5/13/WE-45/971-M (MOIL/15-16/ET/55)) 22-09-2015 28-10-2015 28-10-2015 28-10-2015 3:30 PM Active View
11. Loading of Slag into Trucks at Ferro Manganese Plant, Balaghat Mine(SDGM (MECH)/FMP/15-16/05) 21-09-2015 12-10-2015 12-10-2015 12-11-2015 3:30 PM Active View
12. Repairing of sensor track of railway weigh briedge at Munsar Mine (Mun/C/HO/Agent/15-16/1236 Dt 19/09/2015) 19-09-2015 30-09-2015 30-09-2015 30-09-2015 4:30 PM Active View
13. Repairing of sensor track of railway weigh briedge at Munsar Mine (Mun/C/HO/Agent/15-16/1236 Dt 19/09/2015) 19-09-2015 30-09-2015 30-09-2015 30-09-2015 4:30 PM Active View
14. LOADING AND TRANSPORTATION OF MILL TAILING FROM MALANJKHAND MINE OF M/S. HCL TO UKWA MINE FOR STOWING (Gr-I/GM(S ANDE)/CONT/MILLTAILING/13/UK/2015-16/17) 16-09-2015 20-10-2015 20-10-2015 20-10-2015 3:00 PM Active View
15. TIMBER( WE-23 DT.15.09.2015, e-TENDER NO.MOIL 15-16 ET-53) 15-09-2015 20-10-2015 20-10-2015 20-10-2015 3:30 PM Active View
16. REMOVAL OF WASTE ROCK AND MAGNIFEROUS ROCK AND HANDLING THE SAME BY MECHANISED MEANS AT 208 FEET LEVEL OF OPENCAST AT CHIKLA MINE(Gr.II/SDGM(M)/CONT/OCD/10/CH/2015-16/25) 15-09-2015 16-10-2015 16-10-2015 16-10-2015 3:00 PM Active View
17. UNDERGROUND DEVELOPMENT WORK AT -370 FEET LEVEL OF VERTICAL SECTION AT CHIKLA MINE(Gr.II/SDGM(M)/CONT/UG-DEV/17/CH/2015-16/27) 15-09-2015 16-10-2015 16-10-2015 16-10-2015 3:00 PM Active View
18. SUPPLY OF BLACK METAL (GITTI) (Gr-I/GM(S and E)/CONT/GITTI/15/BGT/2015-16/16) 14-09-2015 22-09-2015 22-09-2015 22-09-2015 3:00 PM Active View
19. Annual repairs and maintenance contract for domestic electric installation of residential and non residential buildings at Munsar mine. (Agent-III/TENDER/15-16/1209 Date 12/09/2015) 12-09-2015 22-09-2015 22-09-2015 22-09-2015 4:30 PM Active View
20. Ground levelling and filling beside the boundary wall in new A type colony Munsar(Mun/ Civil /HO/Agent/15-16/ 1208 dt 12.09.2015) 12-09-2015 28-09-2015 28-09-2015 28-09-2015 4:30 PM Active View
21. Construction of Additional room in road weigh briidge Munsar Mine.(Mun/C/HO/Agent/15-16/1206 Date 12/0) 12-09-2015 28-09-2015 28-09-2015 28-09-2015 4:30 PM Active View
22. Stone pitching for protection of filling of siding platform Munsar Mine(Mun/C/HO/Agent/15-16/1207 Date 12/0) 12-09-2015 28-09-2015 28-09-2015 28-09-2015 4:30 PM Active View
23. Removal of waste dump and handling the same by mechanized means at Chikla Mine(GR.-II/SDGM(M)/CONT/OCD/8/CH/2015-16/26) 11-09-2015 18-09-2015 18-09-2015 18-09-2015 3:00 PM Active View
24. WORKS/REPAIRING WORK(DB/MECH/Excavator/15-16/437 dtd 10.09.15 ) 10-09-2015 22-09-2015 22-09-2015 22-09-2015 4:30 PM Active View
25. PURCHASE OF AIR RECEIVER TANK FOR MANSAR MINE - 4 NOS. (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/298/E-65/1262-M DT.10/09/2015). 10-09-2015 05-10-2015 05-10-2015 05-10-2015 3:30 PM Active View
26. Repairs of roads at vertical shaft premises and approaches to Magazine and different sections at Ukwa Mine (A and Dy G M (M) /Civil/UM/15-16/1710) 09-09-2015 24-09-2015 24-09-2015 24-09-2015 4:30 PM Active View
27. U/G Development (Gr-I/GM(S and E)/CONT/UG-DEV/02/BGT/2015-16/15) 09-09-2015 13-10-2015 13-10-2015 13-10-2015 3:00 PM Active View
28. Sand stowing plant operation at Gumgoan Mine(SDGM(M)-III/CONT/13/SAND STOWING/GUM/15-16/23) 08-09-2015 16-09-2015 16-09-2015 16-09-2015 3:00 PM Active View
29. Concreting of bottom chamber and approach way of 17 No. winze at minus 200ft level at Gumgaon Mine(SDGM(M)-III/CONT/11/CONCRETE/GUM/2015-16/22) 08-09-2015 16-09-2015 16-09-2015 16-09-2015 3:00 PM Active View
30. Sand stowing plant operation at Gumgoan Mine(SDGM(M)-III/CONT/13/SAND STOWING/GUM/15-16/23) 08-09-2015 16-09-2015 16-09-2015 16-09-2015 3:00 PM Active View
31. Concreting of bottom chamber and approach way of 17 No. winze at minus 200ft level at Gumgaon Mine(SDGM(M)-III/CONT/11/CONCRETE/GUM/2015-16/22) 08-09-2015 16-09-2015 16-09-2015 16-09-2015 3:00 PM Active View
32. Construction of Cement concrete platform for Loading and unloading section of OCF at Gumgaon Mine.(CIVIL/HO/15-16 /GUM/35 Dt 08/09/2015) 08-09-2015 30-09-2015 30-09-2015 30-09-2015 3:30 PM Active View
33. Civil Development work. beside vertical shaft at Gumgaon Mine.(CIVIL/HO/15-16/GUM /36 Dt 08/09/2015) 08-09-2015 30-09-2015 30-09-2015 30-09-2015 3:30 PM Active View
34. Construction of Retaining wall of Railway siding platform at Chikla Mine.( CIVIL/HO/15-16/CH /37 Dt- 08/09/2015) 08-09-2015 30-09-2015 30-09-2015 30-09-2015 3:30 PM Active View
35. Construction of Cement concrete platform for Loading and unloading section of OCF at Gumgaon Mine.(CIVIL/HO/15-16 /GUM/35 Dt 08/09/2015) 08-09-2015 30-09-2015 30-09-2015 30-09-2015 3:30 PM Active View
36. Civil Development work. beside vertical shaft at Gumgaon Mine.(CIVIL/HO/15-16/GUM /36 Dt 08/09/2015) 08-09-2015 30-09-2015 30-09-2015 30-09-2015 3:30 PM Active View
37. Construction of Retaining wall of Railway siding platform at Chikla Mine.( CIVIL/HO/15-16/CH /37 Dt- 08/09/2015) 08-09-2015 30-09-2015 30-09-2015 30-09-2015 3:30 PM Active View
38. Unloading of raw materials for Ferro Manganese Plant, Balaghat Mine. (FMP/BGT/TE/2015-16/584 Date 04.09.2015) 07-09-2015 14-09-2015 14-09-2015 14-09-2015 4:30 PM Active View
39. Maintenance of Gardens at Ukwa Mine (A and Dy G M (M) /Civil/UM/15-16/1662) 07-09-2015 21-09-2015 21-09-2015 21-09-2015 4:30 PM Active View
40. e procurement of G.I.Pipes of assorted sizes 5 Items.( WE-39, MOIL/15-16/ET-52 Dtd.07.09.2015) 07-09-2015 20-10-2015 20-10-2015 20-10-2015 3:30 PM Active View
41. PURCHASE OF SODIUM CARBONATE (PUR/MOIL/C-11/4/E-63/1213-M) 05-09-2015 28-09-2015 28-09-2015 28-09-2015 3:30 PM Active View
42. Pushing and unloading of ROM and rock tubs on surface at Gumgaon Mine (SDGM(M)-III/CONT/10/TUBS/GUM/1-16/20) 04-09-2015 10-09-2015 10-09-2015 10-09-2015 3:00 pm Active View
43. Loading of crude into truck from differenct sections of Tirodi Mine (GR.II/SDGM(M)/CONT/LOADING/26/TRD/2015-16/24) 04-09-2015 15-09-2015 15-09-2015 15-09-2015 3:00 pm Active View
44. PURCHASE OF OFFICE FURNITURE, MAKE GODREJ - 3 ITEMS. (AS PER ANNEXURE - A ENCLOSED). (PUR/MOIL/C-4/54/E-62/1206-M DT.04/09/2015) 04-09-2015 21-09-2015 21-09-2015 21-09-2015 3:30 pm Active View
45. Renovation of old substation building near blasting room at Dongri Buzurg Mine. (AGENT And DGM Mines/DB/Civil/15-16/397) 03-09-2015 08-09-2015 08-09-2015 09-09-2015 4:30 PM Active View
46. Laying and fabrication of tramline and crossings(A-III/MUN/15-16/1159 ) 03-09-2015 14-09-2015 14-09-2015 14-09-2015 4:30 PM Active View
47. Steam Coal 650 MT(PUR/MOIL/C-11/102/WE-40 (MOIL/15-16/ET/51)) 03-09-2015 01-10-2015 01-10-2015 01-10-2015 3:30 PM Active View
48. Construction of retaining wall for preventing the sliding of filling along the road and at culvert on approach road from DAV School to Tumsar Katangi State Highway(Civil /HO/15-16 /CH-CSR/38) 02-09-2015 10-09-2015 10-09-2015 10-09-2015 3:30 PM Active View
49. PURCHASE OF TRANSMISSION (20000 SERIES) FOR LOAD HAUL DUMPER OF BALAGHAT MINE - 1 NO. MAKE M/S EIMCON ELECON (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/270/E-60/1172-M DT.01/09/2015) 01-09-2015 23-09-2015 23-09-2015 23-09-2015 3:30 PM Active View
50. Replacement of old broken sheet of shed at Administrative Building and Pit Top Office at 6th Level, Balaghat Mine. (83/Civil/BGT/15-16/3951 Date 30.08.2015) 31-08-2015 10-09-2015 10-09-2015 10-09-2015 4:30 PM Active View
51. Purchase of Explosives and Accessories (WE-22 Dt.29/08/2015(e-Tender No. MOIL/15-16/ET/50)) 29-08-2015 29-09-2015 29-09-2015 29-09-2015 3:30 PM Active View
52. PURCHASE OF SPARES FOR LHD (PUR/MOIL/C-5/27/E-47/933-M) 28-08-2015 14-09-2015 14-09-2015 14-09-2015 3:30 PM Active View
53. Removal of spillage material during hoisting from 14.50th Level of Production Shaft, Balaghat Mine. (Agent Dy.Gm(M)/Mining/BGT/15-16/3849 Date 24.08.15) 27-08-2015 03-09-2015 03-09-2015 03-09-2015 4:30 PM Active View
54. e-Procurement of Gumboots Rubber and PVC 2 Items.(WE-38, MOIL/15-16/ET-49 Dt.27.08.2015) 27-08-2015 20-10-2015 20-10-2015 20-10-2015 3:30 PM Active View
55. PURCHASE OF PVC HELIFLEX SUCTION HOSE PIPE GREEN COLOUR 20 MM.(PUR/MOIL/C-1/200/E-57/1106-M Dt.26.08.2015) 26-08-2015 16-09-2015 16-09-2015 16-09-2015 3:30 PM Active View
56. PURCHASE OF RIBBED, TRANSPARENT P.V.C. FLEXIBLE PIPE - 12 MM (HARD QUALITY).( PUR/MOIL/C-1/200/E-58/1107-M Dt.26.08.2015) 26-08-2015 16-09-2015 16-09-2015 16-09-2015 3:30 PM Active View
57. PURCHASE OF HESSAIN CLOTH MADE FROM JUTE.(PUR/MOIL/C-1/231/E-56/1105-M dt.26.08.2015) 26-08-2015 16-09-2015 16-09-2015 16-09-2015 4:00 PM Active View
58. PURCHASE OF PVC HELIFLEX SUCTION HOSE PIPE GREEN COLOUR 20 MM.(PUR/MOIL/C-1/200/E-57/1106-M Dt.26.08.2015) 26-08-2015 16-09-2015 16-09-2015 16-09-2015 3:30 PM Active View
59. PURCHASE OF RIBBED, TRANSPARENT P.V.C. FLEXIBLE PIPE - 12 MM (HARD QUALITY).( PUR/MOIL/C-1/200/E-58/1107-M Dt.26.08.2015) 26-08-2015 16-09-2015 16-09-2015 16-09-2015 3:30 PM Active View
60. PURCHASE OF HESSAIN CLOTH MADE FROM JUTE.(PUR/MOIL/C-1/231/E-56/1105-M dt.26.08.2015) 26-08-2015 16-09-2015 16-09-2015 16-09-2015 4:00 PM Active View
61. PURCHASE OF AMMONIUM NITRATE (PRILLED) (WE-41 Dt.26/08/2015(e-Tender No. MOIL/15-16/ET/48)) 26-08-2015 07-10-2015 07-10-2015 07-10-2015 3:30 PM Active View
62. Jigging of crude metal dust at Ferro Manganese Plant, FMP Balaghat Mine.(FMP/BGT/TE/2015-16/549 Date 23.08.2015) 24-08-2015 31-08-2015 31-08-2015 31-08-2015 4:00 PM Active View
63. Designing, Engineering, Supplying, Installation,Commissioning and Testing of 2 x 1000 KVA, 11KV/433V Composite Indoor Substation for Vertical Shaft Project of Ukwa Mine, Dist.Balaghat (MP) (DGM(E)/3/ UKW/15-16/ 107 dated 24/08/2015) 24-08-2015 21-09-2015 21-09-2015 21-09-2015 3:30 PM Active View
64. House keeping works including white washing painting and dleaning of premises of industrial buildings at ukwa mine (A and Dy G M (M) /Civil/UM/15-16/1492) 22-08-2015 03-09-2015 03-09-2015 03-09-2015 4:30 PM Active View
65. Hiring of equipment for removal of capping of waste/low content mn. ore to recover SM Grade from Black Dump at Balaghat Mine (Gr.-I/GM(S and E)/CONT/HUTCH/7/BGT/2015-16/14) 21-08-2015 31-08-2015 31-08-2015 31-08-2015 3:00 PM Active View
66. Underground development work at plus 60 feet level of Chikla B section at Chikla Mine( GR.-II/SDGM(M)/CONT/UG-DEV/24/CH/2015-16/23) 21-08-2015 31-08-2015 31-08-2015 31-08-2015 3:00 PM Active View
67. PURCHASE OF COPPER PIPE(PUR/MOIL/C-11/119/E-54/1071-M ) 21-08-2015 11-09-2015 11-09-2015 11-09-2015 3:30 PM Active View
68. PURCHASE OF CERAMIC PACKING ROPE(PUR/MOIL/C-11/119/E-55/1072-M ) 21-08-2015 11-09-2015 11-09-2015 11-09-2015 3:30 PM Active View
69. PURCHASE OF LEATHER SHOES FOR SECURITY GUARDS PREFERABLY MILITARY PATTERN OR EQUIVALENT (BATA/LIBERTY). (PUR/MOIL/C-1/185/E-53/1060-M Dt.21.08.2015) 21-08-2015 14-09-2015 14-09-2015 14-09-2015 3:30 PM Active View
70. HOT CRANE FOR VARIOUS MINES - 4 NOS. (5 MT.CAPACITY - 1 SET AND 3 MT.CAPACITY - 3 SETS.) (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-48 DT.19/08/2015, e-TENDER NO.MOIL/15-16/ET/47) 19-08-2015 24-09-2015 24-09-2015 24-09-2015 3:00 PM Active View
71. SPARES FOR WIPRO TELEHOIST SYSTEM FOR EICHER TIPPERS(PUR/MOIL/C-5/58/E-32/605-M) 18-08-2015 02-09-2015 02-09-2015 02-09-2015 3:30 pm Active View
72. LINE BORING OF STICK END BORES, BOOM AND STICK END BORES AND CONNECTING LINK OF CK 300 NO.2 AND 3 HYD. EXCAVATORS AND STICK END BORES OF TATA HITACHI 450 NO.1 AND 2 HYDRAULIC EXCAVATORS OPERATING AT DONGRI BUZURG MINE (DB/MECH/Excavator/15-16/345 ) 17-08-2015 25-08-2015 25-08-2015 25-08-2015 4:30 PM Active View
73. Blanket Rate Contract for one Year for supply of various types of Paints, Thinner etc. (WE-47 Dt.14/08/2015(e-Tender No.MOIL/15-16/ET/46)) 14-08-2015 15-09-2015 15-09-2015 15-09-2015 3:30 PM Active View
74. SPARES FOR SAICO 5 T HOIST (PUR/MOIL/C-5/58/E-21/1050-M ) 12-08-2015 28-08-2015 28-08-2015 28-08-2015 3:30 PM Active View
75. Construction of RCC Road from Compressor House to Gate No.2 and Mine Canteen to Vertical Shaft at Chikla Mine.(CIVIL/HO/15-16/CH /30 Dt- 12/08/2015) 12-08-2015 04-09-2015 04-09-2015 04-09-2015 3:30 PM Active View
76. Construction of Cement concrete Road and Drain in Village Hirapur, Anwlajhari, Bharveli and Tavejhari ( Manjhara) Dist Balaghat Under MOIL CSR(CIVIL/HO/15-16 /BGT/CSR/29 Dt-12/08/2015) 12-08-2015 04-09-2015 04-09-2015 04-09-2015 3:30 PM Active View
77. BRAKE LINING FOR BRAKING SYSTEM OF WINDING ENGINES (PUR/MOIL/C-5/60/E-49/966-M) 11-08-2015 26-08-2015 26-08-2015 26-08-2015 3:30 PM Active View
78. LOADING, UNLOADING AND TRANSPORTATION OF HUTCH BY MECH. MEANS FROM HUTCH SLIME POND, JIGG DRAIN, JIGG POND AND OTHER AREA OF DUMP TO THE SIDING AT BALAGHAT MINE (Gr.-I/GM(S and E)/CONT/HUTCH/16/BGT/2015-16/13) 11-08-2015 18-08-2015 18-08-2015 18-08-2015 3:00 PM Active View
79. Screening, Sorting, Picking and Stacking of Jigged Ferro Manganese Metal at Ferro Manganese Plant at Balaghat Mine. (FMP/BGT/TE/2015-16/475 Date 06.08.2015) 10-08-2015 17-08-2015 17-08-2015 17-08-2015 4:30PM Active View
80. Providing and erecting of LT over head line for supply of electricity to water works connection at old vertical site of Gumgaon Mine ( GM/ELECT/2015-16/1245 Dt. 08.08.2015 ) 10-08-2015 27-08-2015 27-08-2015 27-08-2015 3:30 PM Active View
81. Annual Welfare proposal for Removal of Garbage, Grass/Shrub Cutting, Cleaning of Septic Tanks and Drains etc at Balaghat Mine. (83/Civil/15-16/3455 Date 09.08.2015) 10-08-2015 18-08-2015 18-08-2015 18-08-2015 4:30 PM Active View
82. Construction of Substation Building at Chikla B-section at Chikla Mine. ( CIVIL/HO/15-16/CH/33 Dt- 10/08/2015 ) 10-08-2015 25-08-2015 25-08-2015 25-08-2015 3:30 PM Active View
83. Water Supply arrangement for New C and D- Type residential quarters at Tirodi Mine. (CIVIL/HO/15-16/TRD/34 Dt-10/08/2015) 10-08-2015 25-08-2015 25-08-2015 25-08-2015 3:30 PM Active View
84. Relining and replacement of shell bottom frame of 5 MVA Electric Arc Furnace of Ferro Manganese Plant at Balaghat Mine. (SDGM (Mech)/FMP/RELINING/15-16/04) 10-08-2015 18-09-2015 18-09-2015 18-09-2015 3:30 PM Active View
85. Removal of Garbage Grass shrub cutting cleaning of septic tanks and drains at Ukwa Mine (16/welf/um/15-16/1358) 08-08-2015 18-08-2015 18-08-2015 18-08-2015 4:30 PM Active View
86. Construction, Extension of main Substation Building and D G Set Room situated at Workshop premises in Dongri Buzurg Mine.(CIVIL/HO/15-16/DB/32 Dt-07/08/2015) 07-08-2015 20-08-2015 20-08-2015 20-08-2015 3:30 PM Active View
87. PURCHASE OF RIDGID PIPE WRENCH. (PUR/MOIL/C-1/210/E-51/973-M Dt.07.08.2015) 07-08-2015 28-08-2015 28-08-2015 28-08-2015 3:30 PM Active View
88. PURCHASE OF TARPAULINE.(PUR/MOIL/C-1/210/E-50/970-M Dt.07.08.2015) 07-08-2015 28-08-2015 28-08-2015 28-08-2015 3:30 PM Active View
89. Low Pressure Hammers, Bits Drill Pipe Extension Rods (PUR/MOIL/C-5/14/WE-28/394-M (MOIL/15-16/ET/45)) 07-08-2015 04-09-2015 04-09-2015 04-09-2015 3:30 PM Active View
90. Construction of Girls Toilet Three Nos. in Government School near Tirodi Mines Distt. Balaghat Under MOIL CSR (Civil /HO/15-16 /TRD-CSR/31 Dt- 06/08/2015) 06-08-2015 20-08-2015 20-08-2015 20-08-2015 3:30 PM Active View
91. PURCHASE OF SINGLE REDUCTION SPEED REDUCER VERTICAL GEAR BOX, MODEL V-1000, MAKE M/S PREMIUM ENERGY TRANSMISSION LIMITED, PUNE (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/240/E-48 /968-M DT.06/08/2015) 06-08-2015 28-08-2015 28-08-2015 28-08-2015 3:30 PM Active View
92. PURCHASE OF 25 H.P. 1460 RPM, TEFC, SQUIRREL CAGE A.C.INDUCTION MOTOR - 1 NO. (AS PER ANNEXURE - A ENCLOSED). (PUR/MOIL/C-4/75/E-52/976-M DT.06/08/2015) 06-08-2015 28-08-2015 28-08-2015 28-08-2015 3:30 PM Active View
93. Pushing of loaded waste rock tubs from main haulage road to Ore Pass at 13.50th Level at Balaghat Mine. (AgentDGM/Mining/BGT/15-16/3331 Date 03.08.2015) 04-08-2015 12-08-2015 12-08-2015 12-08-2015 4:30 pm Active View
94. Road Side Plantation work at Newly constructed A type quarters at Chargaon at Munsar Mine (MUN/C/HO/Agent/15-16/1001 Dt. 03.08.2015) 04-08-2015 14-08-2015 14-08-2015 14-08-2015 4:30 pm Active View
95. Const. of Class room at Zilla Parishad Govt. Secondary School Village Lobhi Distt. Bhandara Under MOIL CSR (Civil /HO/15-16 /DB-CSR/27 Dt- 03/08/2015) 04-08-2015 18-08-2015 18-08-2015 18-08-2015 3:30 PM Active View
96. Const. / Renovation of Classroom (Six nos.) at Rabindranath Tagore School Ukwa Distt. Balaghat Under MOIL CSR (Civil /HO/15-16 /UK-CSR/28 Dt- 03/08/2015) 04-08-2015 18-08-2015 18-08-2015 18-08-2015 3:30 pm Active View
97. Cleaning of surplus underground ROM at Beldongri Mine (SDGM(M)-III/CONT/09/CL-S-ROM/BEL/2015-16/20) 03-08-2015 11-08-2015 11-08-2015 11-08-2015 3:30 PM Active View
98. Construction of GSR of 50000 litres capacity for New A Type quarters at Chargaon road, Munsar Mine (Mun/ Civil /HO/Agent/15-16/1000) 03-08-2015 14-08-2015 14-08-2015 14-08-2015 4:30 PM Active View
99. Replacement of Doors and windows with new steel doors and windows at camp quarters ukwa mine (A and Dy G M (M) /Civil/UM/15-16/1286) 03-08-2015 17-08-2015 17-08-2015 17-08-2015 4:30 PM Active View
100. e-procurement of Medicines (WE-20, e-tenderNo.MOIL/15-16, ET-44 dtd.03.08.2015) 03-08-2015 22-09-2015 22-09-2015 22-09-2015 3:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.