Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Purchase of ERW PIPE-3 items(WE-134 e-tender No.MOIL/18-19/ET-431, Dt.30.01.19) 30-01-2019 26-02-2019 26-02-2019 27-02-2019 03:30 PM Active View
2. Purchase of M.S.LANCING PIPE - 24 MT(WE-137 e-tender No.MOIL/18-19/ET-430, Dt.30.01.19) 30-01-2019 11-03-2019 11-03-2019 12-03-2019 03:30 PM Active View
3. Railing and Transportation of ore at Balaghat Mine(MOIL/18-19/ET/421) 29-01-2019 28-02-2019 28-02-2019 28-02-2019 03:30 PM Active View
4. Railing and Transportation of ore at Dongri Buzurg Mine(MOIL/18-19/ET/422) 29-01-2019 28-02-2019 28-02-2019 28-02-2019 03:30 PM Active View
5. Railing and Transportation of ore at Chikla Mine(MOIL/18-19/ET/423) 29-01-2019 28-02-2019 28-02-2019 28-02-2019 03:30 PM Active View
6. Underground Horizontal development at 370 Level and 470 Level from 2nd Vertical section at Chikla Mine(MOIL/18-19/ET/417) 25-01-2019 25-02-2019 25-02-2019 25-02-2019 03:30 PM Active View
7. Obtaining Environment Clearance of mining lease below 5 Hectare of Sitapatore, Bharweli and Tirodi Mine(MOIL/18-19/ET/402) 25-01-2019 25-02-2019 25-02-2019 25-02-2019 03:30 PM Active View
8. Underground Horizontal and Vertical development at 470 Level of Chikla Vertical section at Chikla Mine(MOIL/18-19/ET/403) 25-01-2019 25-02-2019 25-02-2019 25-02-2019 03:30 PM Active View
9. PURCHASE OF LABORATORY CHEMICALS(PUR/MOIL/C-3/43/E-64/1969-M Dt. 23/01/2019) 23-01-2019 13-02-2019 13-02-2019 13-02-2019 03:30 PM Active View
10. Security guard for diamond drilling site at Chikla Mine( MOIL/18-19/ET/405) 22-01-2019 21-02-2019 21-02-2019 21-02-2019 03:30 PM Active View
11. Picking and collection of 3rd grade and LGHS ore from diluted ROM at South Pit North side at Tirodi Mine(MOIL/18-19/ET/404) 22-01-2019 21-02-2019 21-02-2019 21-02-2019 03:30 PM Active View
12. Ore tolley breaking work at CH22 Ukwa Mine(16/Mining/UM/18-19/2229) 22-01-2019 05-02-2019 05-02-2019 05-02-2019 04:30 PM Active View
13. Underground transportation of tubs at 1750Level Vertical shaft Ukwa Mine( 16/Mining/UM/18-19/2232) 22-01-2019 05-02-2019 05-02-2019 05-02-2019 04:30 PM Active View
14. Underground transportation of tubs at 1850Level Vertical shaft Ukwa Mine(16/Mining/UM/18-19/2235) 22-01-2019 05-02-2019 05-02-2019 05-02-2019 04:30 PM Active View
15. Purchase of Oil and Lubricants - 28 Items (Only Through e-procurement)(WE-117 DT.22/01/2019 (ET-419 AND ET-420)) 22-01-2019 12-02-2019 12-02-2019 13-02-2019 03:30 PM Active View
16. Trench cutting in ore stacks at Beldongri Mine(MOIL/18-19/ET/418) 22-01-2019 22-02-2019 22-02-2019 22-02-2019 03:30 PM Active View
17. Drilling of bore holes at Kesari camp, Sitasaongi of Chikla mine.(TE/MECH/19-20/7600003237/561 date 16/01/2019) 21-01-2019 28-01-2019 28-01-2019 28-01-2019 03:30 PM Active View
18. TENDER ENQUIRY IN SINGLE BID SYSTEM FOR SCREENING OF SIDING DEBRIDGE TO PRODUCE 340MT ORE(Lumpy) AND 300 MT FINES AT CHIKLA MINE(TE-24 Dt.21012019) 21-01-2019 28-01-2019 28-01-2019 28-01-2019 04:30 PM Active View
19. Providing, supplying, installation and commissioning of 33KV Outdoor type Vaccum Circuit Breaker with control panel at supply end for the feeder for proposed Vertical Shaft at Gumgaon Mine(MOIL/18-19/ET/401) 21-01-2019 20-02-2019 20-02-2019 20-02-2019 03:30 PM Active View
20. Inset Lighting Work at Various levels of Underground in vertical shaft of Munsar Mine(ELECT/MUN/ADGM/18-19/719) 19-01-2019 28-01-2019 28-01-2019 28-01-2019 03:30 PM Active View
21. Construction of retaining wall l at Jamrapani siding in end portion area at Tirodi Mine( TRD/CIVIL/2018-19/3273-A) 19-01-2019 29-01-2019 29-01-2019 29-01-2019 03:30 PM Active View
22. Flourscent Jackets( PUR-MOIL-C-1-190-E-63 dt. 19-01-2019) 19-01-2019 11-02-2019 11-02-2019 11-02-2019 03:30 PM Active View
23. Removal of Garbage cleaning of Drains and septic tank etc. at camp qr. at Ukwa Mine(16/Civil/UM/18-19/2169 Date 17-1-2019) 17-01-2019 31-01-2019 31-01-2019 31-01-2019 04:30 PM Active View
24. Safety Belts(PUR-MOIL-C-1-190-E-62 Dt. 17.01.2019) 17-01-2019 06-02-2019 06-02-2019 06-02-2019 03:30 PM Active View
25. Purchase of SODIUM CARBONATE - 24 MT(WE-132 e-tender No.MOIL/18-19/ET-416, Dt.17.01.19) 17-01-2019 14-02-2019 14-02-2019 15-02-2019 03:30 PM Active View
26. Purchase of Valveless DTH Hammers and Bits for ICM 260 Drilling Machine(WE-129 e-tender No.MOIL/18-19/ET-415, Dt.17.01.19) 17-01-2019 14-02-2019 14-02-2019 15-02-2019 03:30 PM Active View
27. Purchase of SODIUM CARBONATE - 24 MT(WE-132 e-tender No.MOIL/18-19/ET-416, Dt.17.01.19) 17-01-2019 14-02-2019 14-02-2019 15-02-2019 03:30 PM Active View
28. Purchase of Valveless DTH Hammers and Bits for ICM 260 Drilling Machine(WE-129 e-tender No.MOIL/18-19/ET-415, Dt.17.01.19) 17-01-2019 14-02-2019 14-02-2019 15-02-2019 03:30 PM Active View
29. Purchase of Cement Injection Pump Sets for Various Mines - 11 Nos (2 Lots) (Only Through e-procurement)( WE-116 DT.16/01/2019 (MOIL/18-19/ET/406)) 16-01-2019 11-02-2019 11-02-2019 12-02-2019 03:30 PM Active View
30. Purchase of Anchorage Testing Machines for various Mines - 4 Nos. (2 Lots) (Only Through e-procurement)(WE-133 DT.16/01/2019 (MOIL/18-19/ET/407)) 16-01-2019 11-02-2019 11-02-2019 12-02-2019 03:30 PM Active View
31. CONCRETING 25m3 OF FAN DRIFT (WINZE) AT CH-2830 OF CHIKLA MINE( TE-23 Dt.15012019) 15-01-2019 22-01-2019 22-01-2019 22-01-2019 04:30 PM Active View
32. Con of Guard Room at Mine Manager Premises at Balaghat Mine.(Civil/BGT/T.E./2018-19/22) 15-01-2019 24-01-2019 24-01-2019 24-01-2019 04:30 PM Active View
33. Renovation of Gymnasium at west court premises MOIL Nagpur.(MOIL/18-19/ET/377) 15-01-2019 04-02-2019 04-02-2019 04-02-2019 03:30 PM Active View
34. ADDITIONAL PILLAR OF RCC AT CHIKLA-B SECTION OF CHIKLA MINE(TE-22 Dt.14012019) 14-01-2019 21-01-2019 21-01-2019 21-01-2019 04:30 PM Active View
35. Purchase of Rear Dumpers with operation and maintenance spares (excluding tyres and tubes, oil and lubricants only) for Dongri Buzurg Mine(M.S) - 3 Nos.(2 Lots) (Only Through e-procurement)(WE-130 DT.14/01/2019 (MOIL/18-19/ET/400)) 14-01-2019 05-02-2019 05-02-2019 06-02-2019 03:30 PM Active View
36. Purchase of Remote Controlled, Light Weight, Electro-Hydraulic Drill Cum Loading Equipment with CAMC for Underground Mining Application at Balaghat Mine(M.P) - 1 No.(2 Lots) (Only Through e-procurement)(WE-128 DT.14/01/2019 (MOIL/18-19/ET/399)) 14-01-2019 05-02-2019 05-02-2019 06-02-2019 03:30 PM Active View
37. Construction of shed for Rectifier transformer in EMD plant( EMD/C/HO/18-19/422 DT 08/01/2019) 12-01-2019 19-01-2019 19-01-2019 19-01-2019 04:30 PM Active View
38. Explosives and Accessories - e-reverse auction(PUR/MOIL/C-6/214/WE/126 (MOIL/18-19//ET/396)) 11-01-2019 31-01-2019 31-01-2019 01-02-2019 03:30 PM Active View
39. Purchase of Electrically Operated Submersible Polder Pump - 4 Sets (2 Lots) (2 Sets each for Balaghat and Gumgaon Mine) (Only Through e-procurement)(WE-115 DT.10/01/2019 (MOIL/18-19/ET/398)) 10-01-2019 07-02-2019 07-02-2019 08-02-2019 03:30 PM Active View
40. Purchase of Undercarriage assemblies for Sandvik Make DI-500 Drilling Machine, Tata Hitachi EX-1200V Excavator and ZX-220LC Excavator and BEML make BE-700 Excavator( WE-127 e-tender No.MOIL/18-19/ET-397, Dt.10.01.19) 10-01-2019 07-02-2019 07-02-2019 08-02-2019 03:30 PM Active View
41. Comprehensive technical study for Slope Stability, Drilling and Blasting and Subsidence of Satuk Opencast mine over an area 5.62 HA. of MOIL Ltd., Nagpur(MOIL/18-19/ET/388) 09-01-2019 23-01-2019 23-01-2019 23-01-2019 03:30 PM Active View
42. Purchase of Incremental Encoder of Hubner Baumer for Balaghat Mine(BGT/Elect./TE/18-19/1316) 09-01-2019 25-01-2019 25-01-2019 25-01-2019 03:30 PM Active View
43. Providing and fixing barbed wire fencing to protect the saplings planted near D-dump area at Tirodi Mine(MOIL/18-19/ET/387) 09-01-2019 08-02-2019 08-02-2019 08-02-2019 03:30 PM Active View
44. Maintenance of Garden at Kandri Mine(MOIL/18-19/ET/381) 09-01-2019 08-02-2019 08-02-2019 08-02-2019 03:30 PM Active View
45. Drilling of borewell and installation hand pumps at different villages of district Balaghat (M.P.) and District Bhandara and Nagpur in (M.S.) under CSR for year 2018-2019(MOIL/18-19/ET/383) 09-01-2019 08-02-2019 08-02-2019 08-02-2019 03:30 PM Active View
46. Construction of substation building at 50-52 section at Tirodi Mine(MOIL/18-19/ET/392) 09-01-2019 08-02-2019 08-02-2019 08-02-2019 03:30 PM Active View
47. Maintenance of water filtration plant and operation and mainetnence of water supply scheme for new A type quarters at Tirodi Mine(MOIL/18-19/ET/382) 09-01-2019 08-02-2019 08-02-2019 08-02-2019 03:30 PM Active View
48. Painting to plant structure of Integreted Manganese Benificiation plant IMB, at Balaghat Mine(MOIL/18-19/ET/389) 09-01-2019 08-02-2019 08-02-2019 08-02-2019 03:30 PM Active View
49. Purchase of Crawler Mounted Side Dump Loader for Munsar Mine - 1 No.(2 Lots)(Only Through e-procurement)(WE-125 DT.07/01/2019 (MOIL/18-19/ET/395)) 08-01-2019 04-02-2019 04-02-2019 05-02-2019 03:30 PM Active View
50. Purchase of Load Haul Dump Machines along with all the spares (except oil and lubricants) required for operation and maintenance of offered equipment for 2000 Hours of operation for various mines - 3 Nos. (4 Lots)(Only Through e-procurement)(WE-124 DT.07/ 08-01-2019 05-02-2019 05-02-2019 06-02-2019 03:30 PM Active View
51. Supply of Timber (as per Annexure C Enclosed) (27 Lots)(Only Through e-procurement)( WE-118 DT.07/01/2019 (MOIL/18-19/ET/393)) 08-01-2019 05-02-2019 05-02-2019 06-02-2019 03:30 PM Active View
52. Purchase of Flange Mounted 37KW Sq Cage IM of Lakshmi Hydraulic Pvt Ltd(TE/18-19/1317) 07-01-2019 25-01-2019 25-01-2019 25-01-2019 04:00 PM Active View
53. Erection of new HT Overhead line from Gadhaghat 2nd Vertical substation to proposed Gadhaghat Ventilation Fan at Chikla Mine(MOIL/18-19/ET/385) 07-01-2019 06-02-2019 06-02-2019 06-02-2019 03:30 PM Active View
54. Hiring of equipments for removal of sub grade mineral reject of Underground ROM to recover SM Grade at Balaghat Mine(MOIL/18-19/ET/391) 07-01-2019 07-02-2019 07-02-2019 07-02-2019 03:30 PM Active View
55. Removal of Underground sub grade mineral reject and handling the same by mechanical means at Ukwa Mine(MOIL/18-19/ET/390) 07-01-2019 07-02-2019 07-02-2019 07-02-2019 03:30 PM Active View
56. Operation of dump screen to recover BGL-523 at Balaghat Mine(Mining/BGT/18-19/5831 Date 03.01.2019) 04-01-2019 10-01-2019 10-01-2019 10-01-2019 04:30 PM Active View
57. Procurement, Installation and Commissioning of HT VCB Panel, LT ACB Panel and transformer for operation of proposed 250 HP Ventilation fan at Gadhaghat of Chikla Mine(MOIL/18-19/ET/384) 04-01-2019 04-02-2019 04-02-2019 04-02-2019 03:30 PM Active View
58. PURCHASE OF MISCELLENEOUS ITEMS C CLASS AS PER ANNEXURE IV(MOIL/EMD/CH/ASDGM/2018-19/540) 02-01-2019 11-01-2019 11-01-2019 12-01-2019 03:30 PM Active View
59. Purchase of Miscellaneous Items C Class as per Annx III For emd plant.(MOIL/EMD/CH/ASDGM/2018-19/539) 02-01-2019 11-01-2019 11-01-2019 12-01-2019 03:30 PM Active View
60. Strength and heightning of Compound wall of MM bunglow at Balaghat Mine(BGT/CIVIL/18-19/18 DATE 31.12.2018) 01-01-2019 09-01-2019 09-01-2019 09-01-2019 04:30 PM Active View
61. Fixing of chain link fencing with concertina coil fencing at Balaghat mine.(BGT/CIVIL/18-19/17 DATE 31.12.2018) 01-01-2019 09-01-2019 09-01-2019 09-01-2019 04:30 PM Active View
62. Const of Guard room at Agent Bunglow premises Balaghat Mine(BGT/CIVIL/18-19/19 DATE 31.12.2018) 01-01-2019 09-01-2019 09-01-2019 09-01-2019 04:30 PM Active View
63. Underground Development work at Kandri Mine(MOIL/18-19/ET/386) 01-01-2019 14-01-2019 14-01-2019 14-01-2019 03:30 PM Active View
64. Underground concreting at 1750 Level at Ukwa Mine(MOIL/18-19/ET/378) 01-01-2019 04-02-2019 04-02-2019 04-02-2019 03:30 PM Active View
65. Pushing and unloading of ROM and rock tubs at surface at Chikla Mine(MOIL/18-19/ET/376) 01-01-2019 01-02-2019 01-02-2019 01-02-2019 03:30 PM Active View
66. Operation of vibrating screen to screen sub grade mineral reject of underground ROM at Balaghat Mine( MOIL/18-19/ET/380) 01-01-2019 01-02-2019 01-02-2019 01-02-2019 03:30 PM Active View
67. Removal of spillage material accumulated during hoisting of skip from 15th Level of production shaft at Balaghat Mine(MOIL/18-19/ET/379) 01-01-2019 01-02-2019 01-02-2019 01-02-2019 03:30 PM Active View
68. Additional excavation in Mangeniferous rock between Ch.33 to Ch.35 at 300 Level at Gumgaon Mine(MOIL/18-19/ET/374) 31-12-2018 31-01-2019 31-01-2019 31-01-2019 03:30 PM Active View
69. Picking and collection of 20 percent SM Grade ore CHL 535 from cleaning of sub-grade mineral reject from ROM at Magazine Dump West side section of Chikla Mine(MOIL/18-19/ET/375) 31-12-2018 31-01-2019 31-01-2019 31-01-2019 03:30 PM Active View
70. Transportation of sand from Kalaphata Ghat to Beldongri Mine(MOIL/18-19/ET/373) 31-12-2018 11-02-2019 11-02-2019 11-02-2019 03:30 PM Active View
71. WASHING OF BOTTOM EMD AT EMD PLANT DONGRI BUZURG MINE(MOIL/EMD/CH/SDGM/18-19/527) 29-12-2018 08-01-2019 08-01-2019 09-01-2019 10:30 AM Active View
72. Recovery of Reduced ore and EMD powder(MOIL/EMD/CH/SDGM/18-19/528) 29-12-2018 08-01-2019 08-01-2019 09-01-2019 10:30 AM Active View
73. Supply, Fabrication, Erection, Installation and Commissioning of belt Conveyor Charging System at Ferro Manganese Plant, Balaghat Mine.(MOIL/18-19/ET/364) 27-12-2018 25-01-2019 25-01-2019 25-01-2019 03:30 PM Active View
74. Removal of waste rock in the H W benches from Ch.39 to Ch.50 and handling the same by mechanized means at Dongri Buzurg Mine( MOIL/18-19/ET/369) 27-12-2018 28-01-2019 28-01-2019 28-01-2019 03:30 PM Active View
75. Construction of stone pitching and RCC Ramp for Diesel Pump at Munsar Mine( MUN/CIVIL/NIT/18-19/144 DT 25.12.2018) 25-12-2018 05-01-2019 05-01-2019 05-01-2019 04:30 PM Active View
76. Hiring of Excavator for cleaning of fines pond Niagara plant at Ukwa Mine( 16/Mining/UM/18-19/1991) 24-12-2018 09-01-2019 09-01-2019 09-01-2019 04:30 PM Active View
77. Drilling of Borehole with casing pipe at Ukwa camp Ukwa Mine(16/Civil/UM/18-19/1981 Date 23-12-2018) 24-12-2018 09-01-2019 09-01-2019 09-01-2019 04:30 PM Active View
78. Recovery of 1.5 mm Chilly grade ore from fines of mobile screening plant through trammel at Ukwa Mine(16/Mining/UM/18-19/1987) 24-12-2018 09-01-2019 09-01-2019 09-01-2019 04:30 PM Active View
79. Providing, Fabrication, Erection and Commissioning of 6 Nos Charging bins at Ferro Manganese Plant, Balaghat mine(MOIL/18-19/ET/355) 24-12-2018 21-01-2019 21-01-2019 21-01-2019 03:30 PM Active View
80. FABRICATION OF STEEL ORE PASSES FOR BALAGHAT MINE(AGENT/BGT/MECH/18-19/1244 dtd 21.12.2018) 22-12-2018 04-01-2019 04-01-2019 04-01-2019 04:30 PM Active View
81. Upgradation and renovation of 20 A type quarters at Munsar Mine(MOIL/18-19/ET/370) 21-12-2018 21-01-2019 21-01-2019 21-01-2019 03:30 PM Active View
82. A Construction of boundry wall at FMP B Construction of Re wall on hilly side of FMP, C) Construction of drain network at FMP at Balaghat Mine( MOIL/18-19/ET/360) 21-12-2018 21-01-2019 21-01-2019 21-01-2019 03:30 PM Active View
83. A New administrative building B Office for ferrow manganese plant C Vocational training center and D Gradute trainees hostel at Balaghat Mine(MOIL/18-19/ET/359) 21-12-2018 28-02-2019 28-02-2019 28-02-2019 03:30 PM Active View
84. Providing ,Supplying and erection of 11KV D.P. Structure Near 50-52 Substation Tirodi Mine.(TRD/ELE/18-19/7400002555/3088) 20-12-2018 28-12-2018 28-12-2018 28-12-2018 03:30 PM Active View
85. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR FUEL DISPENSING AND CONSUMPTION MONITORING SYSTEM AT DONGRI BUZURG MINE.(PUR/MOIL/C-5/23/E-59/854-M Dt. 20/12/2018) 20-12-2018 11-01-2019 11-01-2019 11-01-2019 03:30 PM Active View
86. Repairing and Relining of MSRL Electrolytic Cell Tanks of EMD Plant, Dongri Buzurg Mine(MOIL/18-19/ET/354) 20-12-2018 16-01-2019 16-01-2019 16-01-2019 03:30 PM Active View
87. Purchase of HYDRATED LIME POWDER- 60 MT(WE-122 e-tender No.MOIL/18-19/ET-372, Dt.19.12.18) 19-12-2018 16-01-2019 16-01-2019 17-01-2019 03:30 PM Active View
88. PURCHASE OF GEAR MOTOR FOR TIPPLER AT MUNSAR MINE(ASDGM(Mines)/GrpIII/18-19/662) 19-12-2018 02-01-2019 02-01-2019 02-01-2019 03:30 PM Active View
89. PURCHASE OF ADOBE ACROBAT PRO LATEST VER(PUR/MOIL/C-4/138/E-60/860-M Dt. 19/12/2018) 19-12-2018 07-01-2019 07-01-2019 07-01-2019 03:30 PM Active View
90. Construction of drain in village Tighai Distt Nagpur under CSR(MOIL/18-19/ET/365) 19-12-2018 18-01-2019 18-01-2019 18-01-2019 03:30 PM Active View
91. Construction of cement concrete approch road and toilet block at Fetri under CSR(MOIL/18-19/ET/366) 19-12-2018 18-01-2019 18-01-2019 18-01-2019 03:30 PM Active View
92. Purchase of SULPHURIC ACID with Transportation-250 MT(WE-120 e-tender No.MOIL/18-19/ET-371, Dt.19.12.18) 19-12-2018 09-01-2019 09-01-2019 10-01-2019 03:30 PM Active View
93. Collection of fines from different areas at Kandri Mine(MOIL/18-19/ET/363) 17-12-2018 17-01-2019 17-01-2019 17-01-2019 03:30 PM Active View
94. Underground concreting work RCC for stope preparation at 70 Level, -30 Level and -230 Level at Munsar Mine(MOIL/18-19/ET/362) 17-12-2018 17-01-2019 17-01-2019 17-01-2019 03:30 PM Active View
95. Horizontal development at -70 Level of Chikla B incline section of Chikla Mine(MOIL/18-19/ET/361) 17-12-2018 17-01-2019 17-01-2019 17-01-2019 03:30 PM Active View
96. Extra excavation in Mangeniferous rock at pluse 160 Level of Chikla B section of Chikla Mine(MOIL/18-19/ET/368) 17-12-2018 18-01-2019 18-01-2019 18-01-2019 03:30 PM Active View
97. Loading AND transportation of Mill Tailing from Malajkhand mine of M s Hindustan Copper Limited to Ukwa Mine for stowing(MOIL/18-19/ET/367) 17-12-2018 18-01-2019 18-01-2019 18-01-2019 03:30 PM Active View
98. Cleaning of Spillage Material Under and Around all the Equipment at I.M.B Plant at Balaghat Mine( MOIL/18-19/ET/353) 17-12-2018 16-01-2019 16-01-2019 16-01-2019 03:30 PM Active View
99. Electrical heating system for electrolyte, in place of steam boiler heating system at new 500MT EMD Plant at Dongri Buzurg(MOIL/18-19/ET/352) 15-12-2018 15-01-2019 15-01-2019 15-01-2019 03:30 PM Active View
100. Excavation, Cutting and Dressing Works towards development of approach road near Second Vertical Shaft at Munsar Mine.( MUN/CIVIL/NIT/18-19/134 Date 11.12.2018) 14-12-2018 17-12-2018 17-12-2018 17-12-2018 04:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.