Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Fabrication of Miscellaneous Items for Balaghat Mine(BGT/MECH/MISC ITEM/20-21/289) 25-06-2020 06-07-2020 06-07-2020 06-07-2020 04:30 PM Active View
2. Purchase of Pneumatic Stopper with Telescopic Air Leg for various Mines - 2 Lots.(Only Through e-procurement)(WE-14(ET-84) DT.25/06/2020) 25-06-2020 15-07-2020 15-07-2020 16-07-2020 03:30 PM Active View
3. Removal of waste rock from the dump at 265 MRL near Jawahar Shaft at Chikla Mine.(TE/CHIKLA/MECH/2020-21/94) 24-06-2020 30-06-2020 30-06-2020 30-06-2020 03:30 PM Active View
4. Operation Maintenance, watch and ward of Solid Waste Management Plant at Munsar Mine(MUN/CIVIL/AGT/NIT/20-21/44 DT.24.06.2020) 24-06-2020 30-06-2020 30-06-2020 30-06-2020 04:30 PM Active View
5. Purchase of Compressed Oxygen Gas and Dissolved Acetylene Gas Cylinders(MOIL/20-21/ET-83 dt.24.06.2020) 24-06-2020 16-07-2020 16-07-2020 17-07-2020 03:30 PM Active View
6. Purchase of Cable Bolting Machines for Various Mines - 6 Nos.(1 Lot) (Only Through e-procurement)(WE-18(ET-81) DT.24/06/2020) 24-06-2020 20-07-2020 20-07-2020 21-07-2020 03:30 PM Active View
7. Purchase of Pneumatic Rock Drill Machines and Pusher Leg for various Mines (4 Lots.) (Only Through e-procurement)(WE-19(ET-82) DT.24/06/2020) 24-06-2020 16-07-2020 16-07-2020 17-07-2020 03:30 PM Active View
8. Annual Underground Sand cleaning work at Balaghat Mine(MOIL/20-21/ET/70) 19-06-2020 20-07-2020 20-07-2020 20-07-2020 03:30 PM Active View
9. Hiring of machinery for loading, unloading and transportation of Hutch from Hutch settling pond and hutch drain at Ukwa Mine(MOIL/20-21/ET/69) 19-06-2020 20-07-2020 20-07-2020 20-07-2020 03:30 PM Active View
10. Loading and unloading of steel section and various material with stacking at NOS Kandri Mine(MOIL/20-21/ET/71) 19-06-2020 20-07-2020 20-07-2020 20-07-2020 03:30 PM Active View
11. Handling of Manganese Ore in to Trucks for dispatch by Manual and Mechanized means at Ukwa Mine(MOIL/20-21/ET/68) 19-06-2020 20-07-2020 20-07-2020 20-07-2020 03:30 PM Active View
12. PURCHASE OF HT PANELS VARIOUS TYPES - 7 LOTS (only through e-procurement)(WE-22(ET-78) DT.18/06/2020) 18-06-2020 13-07-2020 13-07-2020 14-07-2020 03:30 PM Active View
13. e Procurement of HDPE Pipes, Bends and Pipe Ends(PUR/MOIL/C-1/199/WE-05/ET/80) 18-06-2020 14-07-2020 14-07-2020 15-07-2020 03:30 PM Active View
14. Providing Installation and testing of Piston type Accumulator with fittings in 150 HP winder(A-III/KAN/20-21/382) 17-06-2020 30-06-2020 30-06-2020 01-07-2020 04:30 PM Active View
15. Purchase of Smart Parking System at MOIL BHAWAN, Nagpur(M.S) - 1 Set.(1 Lot) (Only Through e-procurement)(WE-23(ET-77) DT.17/06/2020) 17-06-2020 07-07-2020 07-07-2020 08-07-2020 03:30 PM Active View
16. Picking and collection of SM Grade SPL 463 and SPL 481 from various dumps of Sitapatore Mine(MOIL/20-21/ET/67) 16-06-2020 16-07-2020 16-07-2020 16-07-2020 03:30 PM Active View
17. Production of 25 percent Mn. SM Grade ore BGL-523 from U/G old sub grade mineral reject material at Balaghat Mine(MOIL/20-21/ET/66) 16-06-2020 22-07-2020 22-07-2020 22-07-2020 03:30 PM Active View
18. Picking and collection of manganiferous rock from surface bed reject area at Parsoda Mine(MOIL/20-21/ET/65) 16-06-2020 16-07-2020 16-07-2020 16-07-2020 03:30 PM Active View
19. Repairing of Bucket Assy 5.6 cum 4 nos of TATAHitachi 1200 NO.3 Hyd Excavator operating at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/236) 15-06-2020 23-06-2020 23-06-2020 23-06-2020 04:30 PM Active View
20. Procurement of 1 no. Elecrically Operated Mono- block pump for IMB Plant at Dongri Buzurg mine(PUR/DB/20-21/ 277) 15-06-2020 10-07-2020 10-07-2020 10-07-2020 04:30 PM Active View
21. Terrace water proofing to RCC slab of old B type quarters 05 blocks at Chikla Mine(MOIL/20-21/ET/47) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
22. Maintenance and Operation of Sewage Treatment Plant at Munsar Mine.(MOIL/20-21/ET/50) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
23. Providing and fixing heat guard (Cool roof) for work shop building of Munsar Mine.(MOIL/20-21/ET/51) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
24. Construction of Security watch tower (2 nos) for surveillance and strengtheing of internal security at Kandri Mine(MOIL/20-21/ET/52) 15-06-2020 31-07-2020 31-07-2020 31-07-2020 03:30 PM Active View
25. Operation of pumps for drinking water supply at Wahitola, Kaichi and Chargaon camp at Munsar Mine(MOIL/20-21/ET/48) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
26. Concreting of x-cut between Ch.34 to Ch.42 at -300 Level for stope preparation at Gumgaon Mine(MOIL/20-21/ET/63) 15-06-2020 15-07-2020 15-07-2020 15-07-2020 03:30 PM Active View
27. Additional excavation in manganiferous rock between Ch.37 to Ch.42 at -300 Level at Gumgaon Mine(MOIL/20-21/ET/64) 15-06-2020 30-06-2020 30-06-2020 30-06-2020 03:30 PM Active View
28. Underground development at 9th Level and 8th Level North at Balaghat Mine(MOIL/20-21/ET/61) 15-06-2020 15-07-2020 15-07-2020 15-07-2020 03:30 PM Active View
29. Additional excavation in Mangeniferous rock at 1750 Level and 1650 Level at Ukwa Mine(MOIL/20-21/ET/62) 15-06-2020 15-07-2020 15-07-2020 15-07-2020 03:30 PM Active View
30. Maintenance and Operation of Solid waste Management plant at Munsar Mine.(MOIL/20-21/ET/49) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
31. Construction of New Administrative building including compound wall and vehical parking shed at Kandri Mine(MOIL/20-21/ET/53) 15-06-2020 31-07-2020 31-07-2020 31-07-2020 03:30 PM Active View
32. Repairing of RCC roof of Laboure and staff quarters of Gudma Camp colony ,prem Nagar(AGT/Civil/UK/LT/20-21/224) 13-06-2020 20-06-2020 20-06-2020 20-06-2020 04:30 PM Active View
33. TRANSPORTATION OF 538 MT OF BOTTOM FLY ASH FROM ADANI POWER PLANT, TIRORA TO CHIKLA MINE FOR UNDERGROUND BACKFILLING WORKS.(TE-04 Dt.13062020) 13-06-2020 25-06-2020 25-06-2020 25-06-2020 04:00 PM Active View
34. Dewatering of Satak open pit during rainy season(Bel/Mech/NIT/2020/445 Dated 10.06.2020) 12-06-2020 22-06-2020 22-06-2020 22-06-2020 03:30 PM Active View
35. Operation of pump at Beldongri Mine during Monsoon(Bel/Mech/NIT/2020/444 Dated 10.06.2020) 12-06-2020 22-06-2020 22-06-2020 22-06-2020 03:30 PM Active View
36. TWO BID SYSTEM FOR PURCHASE OF Failsafe Electro Hydraulic Thruster Brake suitable for 250HP motor FOR KANDRI MINE.(PUR/MOIL/GR.III/KD/2020-21/335) 12-06-2020 30-06-2020 30-06-2020 30-06-2020 04:30 PM Active View
37. Extension of existing coal shed at EMD plant premises at Dongri Buzurg mine(DB/Civil/20-21/220 Date 01/06/2020) 11-06-2020 20-06-2020 20-06-2020 20-06-2020 04:30 PM Active View
38. Deployment of 02 Nos Sweepers for Miscellaneous cleaning works at Ukwa Mine(AGT/CIVIL/UK/LT/20-21/187) 11-06-2020 20-06-2020 20-06-2020 22-06-2020 04:30 PM Active View
39. Providing and fixing aluminium sliding windows at Mine Office at Dongri Buzurg Mine.(DB/Civil/20-21/381 Date 29/05/2020) 11-06-2020 19-06-2020 19-06-2020 19-06-2020 04:30 PM Active View
40. Replacement of old damaged steel doors with new steel doors at Dongri Buzurg Mine(DB/Civil/20-21/219 Date 01/06/2020) 11-06-2020 23-06-2020 23-06-2020 23-06-2020 04:30 PM Active View
41. ELECTRIC WINCH FOR PULLING OF TUB FROM ORE DISCHARGE CHUTE UPTO CAGES AT -330L UNDERGROUND AT MUNSAR MINE(ADGM (Mines)/Grp-III/2020-21/344) 09-06-2020 24-06-2020 24-06-2020 24-06-2020 03:30 PM Active View
42. Proposal for outsourcing manpower for daily electrical maintenance work at Tirodi Mine.(TRD/EL./20-21/7400004572/373 Dated 05.06.2020) 08-06-2020 30-06-2020 30-06-2020 30-06-2020 03:30 PM Active View
43. Engine Overhauling of L and T Loader 9020 Sr No AD0055 operating at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/235) 08-06-2020 16-06-2020 16-06-2020 16-06-2020 04:30 PM Active View
44. TENDER DOCUMENTS FOR PROVIDING SUPPLYING OF RESTRICTED NEUTRAL SYSTEM FOR 1000KVA AND 500KVA, 11KV/433V TRANSFORMERS OF MUNSAR MINE(ELECT/MUN/ADGM/20-21/334) 08-06-2020 17-06-2020 17-06-2020 17-06-2020 03:30 PM Active View
45. DRILLING OF BORE HOLE 110 MM DIAMETER FROM 8TH TO 11 LEVEL FOR LAYING OF ELECTRICAL POWER CABLE AT PRODUCTION SHAFT IN UNDERGROUND AT BALAGHAT MINE(AGENT/MECH/B-HOLE/20-21/199) 06-06-2020 17-06-2020 17-06-2020 17-06-2020 04:30 PM Active View
46. Grass thatching of Bunglow No. 01 (Mine Manager Bunglow) at Tirodi Mine.(TRD/CIVIL/20-21/361) 06-06-2020 10-06-2020 10-06-2020 11-06-2020 05:30 PM Active View
47. Proposal for errection of new L.T. Line at Sitapatore Mine.(TRD/EL./20-21/7400004314/374 Dated 05.06.20) 06-06-2020 27-06-2020 27-06-2020 27-06-2020 03:30 PM Active View
48. Purchase of FRP TRANSLUCENT ROOF SHEET-400 Nos(MOIL/20-21/ET-60 dt.05.06.2020) 05-06-2020 29-06-2020 29-06-2020 30-06-2020 03:30 PM Active View
49. Construction of foundation for Chimney for 1500 KVA DG Set at Second vertical Shaft at Chikla mine.(CH/Civil/2020-21/316 date 01.06.2020) 04-06-2020 13-06-2020 13-06-2020 13-06-2020 03:30 PM Active View
50. PURCHASE OF VIBRATING FEEDER COMPLETE WITH DRIVE, MAKE-ENESTEE ENGINEERING LTD., MODEL-E-VF-1016-001- 1 NO. FOR BALAGHAT MINE (M.P) (AS PER ANNEXURE A ENCLOSED)(PUR/MOIL/C-4/239/E-3/35-M DT.03/06/2020) 04-06-2020 24-06-2020 24-06-2020 24-06-2020 03:30 PM Active View
51. PURCHASE OF WHEEL AND EXCEL ASSEMBLY WITH GEARBOX COMPLETE WITHOUT MOTOR - 1 SET, MAKE- M/S OVIS EQUIPMENT PVT.LTD., HYDERABAD, MODEL- 4 TON BATTERY OPERATED LOCOMOTIVE (SR.NO.603 AND 582) OPERATING AT BALAGHAT MINE(M.P) (AS PER ANNEXURE A ENCLOSED)(PUR/MOIL/C-4/4/E-4/36-M DT.03/06/2020) 04-06-2020 24-06-2020 24-06-2020 24-06-2020 03:30 PM Active View
52. DRILLING OF BORE HOLE 110 MM DIAMETER FROM 8TH TO 11 LEVEL FOR LAYING OF ELECTRICAL POWER CABLE AT PRODUCTION SHAFT IN UNDERGROUND AT BALAGHAT MINE(AGENT/BGT/B-HOLE/20-21/188) 04-06-2020 15-06-2020 15-06-2020 15-06-2020 04:30 PM Active View
53. Providing and installation of Effluent Treatment Plant in work shop area at Chikla Mine.(CH/Civil/2020-21/211 date 16.05.2020) 03-06-2020 10-06-2020 10-06-2020 10-06-2020 03:30 PM Active View
54. purchase of Pneumatically Operated Double Diaphragm Pumps for Various Mines - 10 Nos. (2 Lots)(WE-13(ET-57) DT.01/06/2020) 02-06-2020 24-06-2020 24-06-2020 25-06-2020 03:30 PM Active View
55. Obtaining Final Forest Clearance from Ministry of Environment, Forest and Climate Change over an area of 150.586 Ha., 3.986 Ha. and 4.734 Ha. within Mining lease of Tirodi, Ukwa and Sitapatore respectively(MOIL/20-21/ET/27) 02-06-2020 01-07-2020 01-07-2020 01-07-2020 03:30 PM Active View
56. Supply of Medicines 235 items(PUR/MOIL/C-10/35/WE-06/ET/59) 02-06-2020 09-07-2020 09-07-2020 10-07-2020 03:30 PM Active View
57. PURCHASE OF MOTOROLA MAKE MOTOTRBO SLR 5300 REPEATER ALONG WITH ACCESSORIES FOR DONGRI BUZURG MINE(DB/ELECT/20-21/211) 01-06-2020 26-06-2020 26-06-2020 26-06-2020 04:30 PM Active View
58. TENDER DOCUMENTS FOR SUPPLYING OF DGMS APPROVED FLP GATE END BOX FOR LHD, WITH ALL ACCESSORIES MUNSAR MINE 1 NO(ELECT/MUN/ADGM/20-21/269) 01-06-2020 22-06-2020 22-06-2020 22-06-2020 03:30 PM Active View
59. Purchase of SULPHURIC ACID with Transportation-400 MT(MOIL/20-21/ET-58 dt.01.06.2020) 01-06-2020 22-06-2020 22-06-2020 23-06-2020 03:30 PM Active View
60. Purchase of Cement Injection Pump Sets for Various Mines - 15 Nos.(2 Lots) (Only Through e-procurement)(WE-12(ET-56) DT.01/06/2020) 01-06-2020 29-06-2020 29-06-2020 30-06-2020 03:30 PM Active View
61. Requirement of manpower for collection of canteen food items and serving it to mine employees at Chikla Mine(MOIL/20-21/ET/29) 30-05-2020 29-06-2020 29-06-2020 29-06-2020 03:30 PM Active View
62. Purchase of Handheld XRF Machine for Head office, Nagpur(M.S) 2 Nos. (1 Lot) (Only Through e-procurement)(WE-7(ET-55) DT.30/05/2020) 30-05-2020 22-06-2020 22-06-2020 23-06-2020 03:30 PM Active View
63. Request for Empanelment (RFE) For Empanelment of Consultant/ Transaction Advisor(MOIL/RFE/CTA/20-21) 28-05-2020 18-06-2020 18-06-2020 24-06-2020 11:30 AM Active View
64. Replacement of sheave wheel 1 No at Kandri Mine(A-III/KAN/20-21/228) 27-05-2020 13-06-2020 13-06-2020 15-06-2020 04:30 PM Active View
65. Exploratory core drilling in ML area of Lugma village, ThParaswada, DistBalaghat over an area of 48.974 Ha(MOIL/20-21/ET/28) 27-05-2020 26-06-2020 26-06-2020 26-06-2020 03:30 PM Active View
66. Repairing of approach road from PWD road to New satak Mine at Beldongri MINE(Civil/Bel/20-21/310 Date 21/05/2020) 26-05-2020 02-06-2020 02-06-2020 02-06-2020 04:30 PM Active View
67. Loading transportation and unloading of Manganese ore ROM at Beldongri Mine(Min/BEL/20-21/299 dATE 20.05.2020) 25-05-2020 28-05-2020 28-05-2020 28-05-2020 04:30 PM Active View
68. Digging screening and stacking of fines from various places at Beldongri Mine(Min/BEL/20-21/309 Date 21.05.2020) 25-05-2020 28-05-2020 28-05-2020 28-05-2020 04:30 PM Active View
69. Cleaning of drain sewer lines of camp colonies of Balaghat Mine(Civil/BGT/LT/2020-21/140) 25-05-2020 04-06-2020 04-06-2020 04-06-2020 04:30 PM Active View
70. Procurement of Electrical C class material for Balaghat Mine(BGT/ELECT/20-21/130) 23-05-2020 12-06-2020 12-06-2020 12-06-2020 04:30 PM Active View
71. Providing, supplying and installation of Neutral grounding resistance and monitoring relay on 11kV/3.3kV surface transformer at Balaghat Mine.(BGT/ELECT/20-21/131) 23-05-2020 16-06-2020 16-06-2020 16-06-2020 04:30 PM Active View
72. CONSTRUCTION OF PARTITION WALLS FOR NEW OCF AT MUNSAR MINE.(MUN/CIVIL/NIT/20-21/22 DT 23.05.2020) 23-05-2020 30-05-2020 30-05-2020 30-05-2020 04:30 PM Active View
73. Repairing of Bucket cylinder and Arm Cylinder of LT make CK300 3 Hyd Excavator of Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/167) 22-05-2020 09-06-2020 09-06-2020 09-06-2020 04:30 PM Active View
74. Fabrication of Steel Ore-Passes and Manways for Underground Mines i.e. Balaghat, Ukwa, Chikla, Beldongri, Munsar, Kandri and Gumgaon Mine(MOIL/20-21/ET/26) 22-05-2020 22-06-2020 22-06-2020 22-06-2020 03:30 PM Active View
75. Repairing and Rewinding of 2 Nos. 1000KVA, 33KV/11KV, Outdoor type Oil Cooled Power transformers of Main Electrical Substation at Ukwa Mine(MOIL/20-21/ET/24) 22-05-2020 22-06-2020 22-06-2020 22-06-2020 03:30 PM Active View
76. Supply, Installation and Commissioning of Elevators in The Residential Towers (Two Nos.) at the CMS Compound, MOIL Ltd., Nagpur - 2 Nos.(2 Lots) (Only Through e-procurement)(WE-10(ET-46) DT.22/05/2020) 22-05-2020 15-06-2020 15-06-2020 16-06-2020 03:30 PM Active View
77. Purchase of Instruments for Rock Mechanics Lab at Head office, Nagpur - 10 Items.(10 Lots) (Only Through e-procurement)(WE-9(ET-45) DT.22/05/2020) 22-05-2020 11-06-2020 11-06-2020 12-06-2020 03:30 PM Active View
78. Repairing of LHS Track Chain Assy of TATAHitachi zx 450 Hyd Exc No.1 at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/168) 21-05-2020 29-05-2020 29-05-2020 29-05-2020 04:30 PM Active View
79. Repairing of Bucket Assembly of TATAHitachi Zx450 Hyd Excavator No.1 at operating at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/169) 21-05-2020 29-05-2020 29-05-2020 29-05-2020 04:30 PM Active View
80. Construction of barricade wall around open pits Gudma Chhitalwar Kasturi Chainage 1700 to 3500 at Ukwa Mine(MOIL/20.21/ET/43) 21-05-2020 06-07-2020 06-07-2020 06-07-2020 03:30 PM Active View
81. Replacement of Buntons, Sollars, Platform, Ladder and Fencing of Jawahar Vertical Shaft at Chikla Mine(MOIL/20-21/ET/25) 20-05-2020 19-06-2020 19-06-2020 19-06-2020 03:30 PM Active View
82. Tender for providing 6 mbps 1 is to 1 Internet Leased Line (ILL) at Beldongri Mine(ADGM/GrpIII/SYS/NW/2020-21/213) 20-05-2020 29-05-2020 29-05-2020 29-05-2020 04:30 PM Active View
83. Limited Tender for Computer and peripherals (Printers, UPSs and LAN) Annual Maintenance Contract of Chikla AND Dongri Buzurg Mine(TE/CH/SYSTEM/AMC/2020-21/159) 19-05-2020 06-06-2020 06-06-2020 06-06-2020 04:30 PM Active View
84. Underground concreting work to establish crosscut for preparation of Chute and manways at Chikla Mine(MOIL/20-21/ET/38) 19-05-2020 19-06-2020 19-06-2020 19-06-2020 03:30 PM Active View
85. Loading of explosives from Magazine and unloading at different location of Tirodi mine(MOIL/20-21/ET/42) 19-05-2020 19-06-2020 19-06-2020 19-06-2020 03:30 PM Active View
86. Making of stemming material Mug Plug used for blasting at Ukwa Mine(MOIL/20-21/ET/40) 19-05-2020 19-06-2020 19-06-2020 19-05-2020 03:30 PM Active View
87. Filling and Spreading of waste rock generated through rock development in 300 L between Ch. 34 to Ch. 40 in Gumgaon Mine(MOIL/20-21/ET/37) 19-05-2020 18-06-2020 18-06-2020 18-06-2020 03:30 PM Active View
88. Hiring of machinery for sub grade mineral reject of UG ROM handling from Magazine area at Kandri Mine(MOIL/20-21/ET/35) 19-05-2020 18-06-2020 18-06-2020 18-06-2020 03:30 PM Active View
89. Transportation of bottom ash from Adani Power Plant, Tiroda to Ukwa Mine of M S MOIL Ltd. for stowing purpose(MOIL/19-20/ET/34) 19-05-2020 18-06-2020 18-06-2020 18-06-2020 03:30 PM Active View
90. Retiling and Reroofing of Camp Quarters as Monsoon Preparatory Works at Kandri Mine.(Kan/Civil/NIT/2020-21/219 Date 17.05.2020) 18-05-2020 23-05-2020 23-05-2020 23-05-2020 04:30 PM Active View
91. Cleaning of Storm Water Drain of Surface and Underground Sump at Kandri Mine.(Kan/Civil/NIT/2020-21/320 Date 17.05.2020) 18-05-2020 23-05-2020 23-05-2020 23-05-2020 04:30 PM Active View
92. Hiring of Consultant for Estimation Drawings including working drawings and structural design for centralized store building with storage sheds yards and peripheral boundary wall at Balaghat Mine.(Civil/BGT/T E/2020-21/340) 18-05-2020 01-06-2020 01-06-2020 01-06-2020 04:30 PM Active View
93. Hiring of structural Consultant services for Construction of foundation work for installation of new gear box and motor for Cage winder of Home shaft at Balaghat Mine(Civil/BGT/T E/2020-21/338) 18-05-2020 01-06-2020 01-06-2020 01-06-2020 04:30 PM Active View
94. WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR RE-TILLING ROOF REPAIR INCLUDING LAYING OF POLYTHENE COVER OF CAMP QUARTER AT CHIKLA MINE.(TE-CH/CIVIL/20-21/210) 18-05-2020 25-05-2020 25-05-2020 25-05-2020 03:30 PM Active View
95. WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR UNDERGROUND FILLING SPREADING AT -170 LEVEL AT CHIKLA MINE(TE-03 Dt.18052020) 18-05-2020 28-05-2020 28-05-2020 28-05-2020 04:30 PM Active View
96. Renovation of Production Shaft by replacing Buntons at Balaghat Mine(MOIL/20-21/ET/23) 18-05-2020 25-06-2020 25-06-2020 25-06-2020 03:30 PM Active View
97. Fencing of Electrical Switchyard beside existing Compressor House at Munsar Mine.(MUN/CIVIL/NIT/19-20/19 DT.16.05.2020) 16-05-2020 23-05-2020 23-05-2020 23-05-2020 04:30 PM Active View
98. Maintenance and Upkeeping of ETP at EMD Plant,Dongri Mine 2020(MOIL/EMD/CH/Jt.GM/20-21/134) 15-05-2020 26-05-2020 26-05-2020 26-05-2020 11:00 AM Active View
99. Removal of waste rock and handling the same by mechanized means in the F W benches between Ch. 20 to 50 at Dongri Buzurg Mine(MOIL/20-21/ET/30) 15-05-2020 15-06-2020 15-06-2020 15-06-2020 03:30 PM Active View
100. Vertical development at 1750 Level and 1650 Level at Ukwa Mine(MOIL/20-21/ET/32) 15-05-2020 15-06-2020 15-06-2020 15-06-2020 03:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.