Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Construction of Canteen Building at Balaghat Mine. (MOIL/19-20/ET/102 ) | 04-06-2019 | 04-07-2019 | 04-07-2019 | 04-07-2019 | 3:30 PM | Active | View |
2. | Construction of Exhaust fan house with EVASEE and boundary wall at Balaghat Mine. (MOIL/19-20/ET/101 ) | 04-06-2019 | 04-07-2019 | 04-07-2019 | 04-07-2019 | 3:30 PM | Active | View |
3. | Annual repairs to camp quarters at Chikla Mine. (MOIL/19-20/ET/106 ) | 04-06-2019 | 08-07-2019 | 08-07-2019 | 08-07-2019 | 3:30 PM | Active | View |
4. | Construction of Water supply scheme at Gumgaon Mine (MOIL/19-20/ET/108 ) | 04-06-2019 | 08-07-2019 | 08-07-2019 | 08-07-2019 | 3:30 PM | Active | View |
5. | Supplying and installation of portable M.S. Office for Parsoda Mine (Parsoda/civil/19-20/29 dt 03.06.2019) | 04-06-2019 | 12-06-2019 | 12-06-2019 | 12-06-2019 | 4:30 PM | Active | View |
6. | Supplying and installation of portable Toilet and Security Cabin for Parsoda Mine (Parsoda/civil/19-20/30 dt 03.06.2019) | 04-06-2019 | 12-06-2019 | 12-06-2019 | 12-06-2019 | 4:30 PM | Active | View |
7. | Construction of RCC Retaining wall and floor for new installed bunker of crushing plant at Chikla Mine (MOIL/19-20/ET/105 ) | 04-06-2019 | 04-07-2019 | 04-07-2019 | 04-07-2019 | 3:30 PM | Active | View |
8. | Loading of crude ore into tipper manually from different working sections to jig section of Tirodi Mine (MOIL/19-20/ET/121) | 04-06-2019 | 03-07-2019 | 03-07-2019 | 03-07-2019 | 3:30 PM | Active | View |
9. | Transportation of sand from Kanhan River to near Guest House and sand stowing plant at Gumgaon Mine by mechanised means (MOIL/19-20/ET/120) | 04-06-2019 | 03-07-2019 | 03-07-2019 | 03-07-2019 | 3:30 PM | Active | View |
10. | Annual underground sand cleaning work at Balaghat Mine (MOIL/19-20/ET/122) | 04-06-2019 | 03-07-2019 | 03-07-2019 | 03-07-2019 | 3:30 PM | Active | View |
11. | PURCHASE OF APPLE 21.5 INCH IMAC (DESKTOP) WITH RETINA 4K DISPLAY 3.0GHZ 6-CORE 8TH-GENERATION INTEL CORE I5 PROCESSOR, 1TB ALONG WITH APPLE CARE PROTECTION PLAN FOR IMAC-ONLINE ENROLMENT AND MICROSOFT OFFICE MAC HOME STUDENT 2016 - 1 NO. (PUR/MOIL/C-4/13 | 04-06-2019 | 10-07-2019 | 10-07-2019 | 10-07-2019 | 3:30 PM | Active | View |
12. | Rejuvenate of well situated near siding by cleaning and deepening at Kandri mine. (Kan/Civil/NIT/19-20/687 dt 28.05.2019) | 01-06-2019 | 04-06-2019 | 04-06-2019 | 04-06-2019 | 4:30 PM | Active | View |
13. | Repairing and replacement of damaged domestic water pipeline including fitting of pump to service well for water distribution in chargaon colony at Munsar Mine (MUN/CIVIL/19-20/27 Date 29/05/2019) | 01-06-2019 | 08-06-2019 | 08-06-2019 | 08-06-2019 | 4:30 PM | Active | View |
14. | Repairing and replacement of damaged domestic water pipeline including fitting of pump to service well for water distribution in chargaon colony at Munsar Mine (MUN/CIVIL/19-20/27 Date 29/05/2019) | 01-06-2019 | 12-06-2019 | 12-06-2019 | 12-06-2019 | 4:30 PM | Active | View |
15. | Limited Tender for Computer and peripherals (Printers, UPSs and LAN) Maintenance Contract of Chikla Mine and Dongri Buzurg Mine.(TE/CH/SYSTEM/AMC/2019-20/60) | 30-05-2019 | 08-06-2019 | 08-06-2019 | 08-06-2019 | 04:30 PM | Active | View |
16. | TENDER DOCUMENT FOR REPLACEMENT OF IBR BED COIL TUBES 19 20(MOIL/EMD/CH/ASDGM/19-20/59) | 30-05-2019 | 11-06-2019 | 11-06-2019 | 12-06-2019 | 10:30 AM | Active | View |
17. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR GODREJ SULLAIR MAKE COMPRESSOR(PUR/MOIL/C-5/34/E-18/207-M Dt. 29/05/2019) | 29-05-2019 | 19-06-2019 | 19-06-2019 | 19-06-2019 | 03:30 PM | Active | View |
18. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR VENTRA MAKE 4TON BATTERY OPERATED LOCOMOTIVE.(PUR/MOIL/C-5/44/E-19/208-M Dt. 29/05/2019) | 29-05-2019 | 19-06-2019 | 19-06-2019 | 19-06-2019 | 03:30 PM | Active | View |
19. | Purchase of SULPHURIC ACID with Transportation - 275 MT(WE-21 e-tender No.MOIL/19-20/ET-128, Dt.29.05.2019) | 29-05-2019 | 20-06-2019 | 20-06-2019 | 21-06-2019 | 03:30 PM | Active | View |
20. | Premium Greaves make Worm Gear box, Model U800 Reduction Ratio70is to1 Right Handling(MOIL/EMD/CH/ASDGM/19-20/56) | 29-05-2019 | 19-06-2019 | 19-06-2019 | 20-06-2019 | 10:30 AM | Active | View |
21. | Operation and Maintenance of Electrical works at Corporate Office, Nagpur for a period of one year(MOIL/19-20/ET/123) | 29-05-2019 | 28-06-2019 | 28-06-2019 | 28-06-2019 | 03:30 PM | Active | View |
22. | Inclusion of priming system in existing pumping automation system for operation and monitoring of underground pumps at Chikla Mine(MOIL/19-20/ET/124) | 29-05-2019 | 28-06-2019 | 28-06-2019 | 28-06-2019 | 03:30 PM | Active | View |
23. | Purchase of IRON ORE with Transportation - 3000 MT(WE-20 e-tender No.MOIL/19-20/ET-126, Dt.27.05.2019) | 27-05-2019 | 19-06-2019 | 19-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
24. | Purchse of TCT Drill Rods - 4 Items(WE-14 DT.27.05.2019 (e-Tenderno.MOIL/19-20/ET/127)) | 27-05-2019 | 26-06-2019 | 26-06-2019 | 27-06-2019 | 03:30 PM | Active | View |
25. | PURCHASE OF GEARED MOTOR FOR 14.5 LEVEL CONVEYOR BELT AT BALAGHAT MINE(PUR/MOIL/BGT/19-20/185) | 25-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 04:30 PM | Active | View |
26. | Picking and collection of low grade contaminated Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine East south side part-3(MOIL/19-20/ET/116) | 24-05-2019 | 31-05-2019 | 31-05-2019 | 31-05-2019 | 03:30 PM | Active | View |
27. | Picking and collection of low grade contaminated Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine South side part-1(MOIL/19-20/ET/117) | 24-05-2019 | 31-05-2019 | 31-05-2019 | 31-05-2019 | 03:30 PM | Active | View |
28. | Picking and collection of low grade contaminated Ore DBL-563 from crushed ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine South West part-1(MOIL/19-20/ET/118) | 24-05-2019 | 31-05-2019 | 31-05-2019 | 31-05-2019 | 03:30 PM | Active | View |
29. | Picking and collection of low grade contaminated Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine South side part-2(MOIL/19-20/ET/119) | 24-05-2019 | 31-05-2019 | 31-05-2019 | 31-05-2019 | 03:30 PM | Active | View |
30. | Purchase of PEARL COKE with Transportation - 7000 MT(WE-10 e-tender No.MOIL/19-20/ET-125, Dt.24.05.2019) | 24-05-2019 | 13-06-2019 | 13-06-2019 | 14-06-2019 | 03:30 PM | Active | View |
31. | Hiring of diesel Jeep for Balaghat Mine for a period of one year(MOIL/19-20/ET/36) | 24-05-2019 | 24-06-2019 | 24-06-2019 | 24-06-2019 | 03:30 PM | Active | View |
32. | Cleaning of ROM recovered from Pit No.6 at Sitapatore Mine(MOIL/19-20/ET/97) | 24-05-2019 | 24-06-2019 | 24-06-2019 | 24-06-2019 | 03:30 PM | Active | View |
33. | Strengthening of security for Railway Weigh Bridge at Balaghat Mine(MOIL/19-20/ET/99) | 24-05-2019 | 24-06-2019 | 24-06-2019 | 24-06-2019 | 03:30 PM | Active | View |
34. | Shifting and Transport of pebbles accumulated due to Sand Stowing by old open plant at 234 MRL and dropping into the winze No. 2 of the level 193 MRL and Spreading at Beldongri Mine(MOIL/19-20/ET/98) | 24-05-2019 | 01-07-2019 | 01-07-2019 | 01-07-2019 | 03:30 PM | Active | View |
35. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR SCREENING OF SIDING DEBRIDGE TO PRODUCE 340MT ORE(Lumpy) AND 250 MT FINES AT CHIKLA MINE(TE-33 Dt.23052019) | 23-05-2019 | 29-05-2019 | 29-05-2019 | 29-05-2019 | 04:30 PM | Active | View |
36. | Repairing work at quarter no C-2 Chikla type at Balaghat Mine(CIVIL/BGT/LT/19-20/21 DATE 22.05.2019) | 23-05-2019 | 03-06-2019 | 03-06-2019 | 03-06-2019 | 04:30 PM | Active | View |
37. | Repairing of existing drain of IMB plant at Balaghat Mine(CIVI/BGT/LT/19-20/22 DATE 22.05.2019) | 23-05-2019 | 03-06-2019 | 03-06-2019 | 03-06-2019 | 04:30 PM | Active | View |
38. | Providing, Supplying, Installation and Commissioning of heavy duty centrifugal pump with drive and operating valves at Chikla Mine(MOIL/19-20/ET/84) | 22-05-2019 | 21-06-2019 | 21-06-2019 | 21-06-2019 | 03:30 PM | Active | View |
39. | Cleaning of accumulated silt from cross cut of different level at Balaghat Mine(MIN/BGT/19-2/LT/816 DATE 17.05.2019) | 21-05-2019 | 29-05-2019 | 29-05-2019 | 29-05-2019 | 04:30 PM | Active | View |
40. | Transportation of sand from Kanki ghat to Balaghat Mine(Min/BGT/19-2/LT/841 DATE 20.05.2019) | 21-05-2019 | 29-05-2019 | 29-05-2019 | 29-05-2019 | 04:30 PM | Active | View |
41. | Additional excavation in Manganiferous rock for concreting of crosscut, manway and orepass etc. in underground at Munsar Mine(MOIL/19-20/ET/94) | 21-05-2019 | 21-06-2019 | 21-06-2019 | 21-06-2019 | 03:30 PM | Active | View |
42. | Picking and collection of material to recover Ferro grade MS-3516 ore from sub-grade mineral reject through jigging at Munsar Mine(MOIL/19-20/ET/93) | 21-05-2019 | 21-06-2019 | 21-06-2019 | 21-06-2019 | 03:30 PM | Active | View |
43. | Recovery of Ferro grade TD-4505 and SM grade TDL-439 and TDL-499 from South Magazine Dump at Tirodi Mine(MOIL/19-20/ET/95) | 21-05-2019 | 21-06-2019 | 21-06-2019 | 21-06-2019 | 03:30 PM | Active | View |
44. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR DRY DENSITY SEPERATION PLANT AT MUNSAR MINE(PUR/MOIL/C-5/23/E-16/117-M Dt. 21-05-2019) | 21-05-2019 | 12-06-2019 | 12-06-2019 | 12-06-2019 | 03:30 PM | Active | View |
45. | Lifting of transformer and accessories from transformer floor to the ground and transporting to storage site in FMP, Balaghat(FMP/ELECT/19-20/55) | 20-05-2019 | 31-05-2019 | 31-05-2019 | 31-05-2019 | 04:30 PM | Active | View |
46. | PURCHASE OF ATLAS COPCO MAKE BBD 94W ROCK DRILL - 10 NOS. AND ALF 72D PUSHER LEGS - 10 NOS. FOR BALAGHAT MINE(M.P)(AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/115/E-17/178-M DT.20/05/2019) | 20-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
47. | Hiring of services of Design Engineering Firm for proposed new water supply scheme at Chikla Mine(MOIL/19-20/ET/72) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
48. | Maintenance, watch and ward of garden at various places at Munsar Mine.(MOIL/19-20/ET/65) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
49. | 1 Providing and fixing concertina coil fencing at 160L n 250L 2 Providing and fixing concertina coil fencing from Siding to Chikla B and 3 Construction of boundary wall in precast, prestressed column and panels along peripherial area of 2nd Ve(MOIL/19-20/ | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
50. | Construction of GSR of 2.00 lakh liter capacity for second vertical shaft near Gadhaghat at Chikla Mine(MOIL/19-20/ET/70) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
51. | Cleaning of surplus contaminated ROM to recover Ferro grade and LGHS ore at Vertical Shaft at Chikla Mine(MOIL/19-20/ET/91) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
52. | Cleaning of surplus contaminated ROM at Chikla B section of Chikla Mine(MOIL/19-20/ET/90) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
53. | Construction of Cement concrete plateform beside existing CC plateform at Kandri Mine.(MOIL/19-20/ET/62) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
54. | Providing and laying pipe line from service reservoir of guest house upto second level sand stowing plant at Balaghat Mine(MOIL/19-20/ET/66) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
55. | Concreting of shaft cross-cut at -450 L using Precast Slabs at Kandri Mine(MOIL/19-20/ET/92) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
56. | Construction of DAV Public school at village Munsar Distt Nagpur, under CSR(MOIL/19-20/ET/100) | 20-05-2019 | 24-06-2019 | 24-06-2019 | 24-06-2019 | 03:30 PM | Active | View |
57. | Repairing of Bucket Assembly TATA Hitachi 450-1 Hyd Excavator operating at Dongri Buzurg Mine(DB/MECH/19-20/SDGM(MECH)/52) | 18-05-2019 | 06-06-2019 | 06-06-2019 | 06-06-2019 | 04:30 PM | Active | View |
58. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF STAINLESS STEEL BALL VALVES(PUR/MOIL/C-11/14/E-12/114-M Dt. 17-05-2019) | 17-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
59. | Removal of waste rock and Manganiferous rock from Pit No.5 and handling the same by mechanized means at Sitapatore Sukli Mine(MOIL/19-20/ET/86) | 17-05-2019 | 17-06-2019 | 17-06-2019 | 17-06-2019 | 03:30 PM | Active | View |
60. | Purchase of sand required for Underground concreting work at Ukwa Mine(MOIL/19-20/ET/87) | 17-05-2019 | 17-06-2019 | 17-06-2019 | 17-06-2019 | 03:30 PM | Active | View |
61. | Transportation of underground tubs at Ch.5000 section of Ukwa Mine(MOIL/19-20/ET/89) | 17-05-2019 | 17-06-2019 | 17-06-2019 | 17-06-2019 | 03:30 PM | Active | View |
62. | Pushing and unloading of ROM and rock tubs in underground at Munsar Mine(MOIL/19-20/ET/88) | 17-05-2019 | 19-06-2019 | 19-06-2019 | 19-06-2019 | 03:30 PM | Active | View |
63. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF NON RETURN VALVES, GATE VALVES AND BUTTERFLY VALVES.(PUR/MOIL/C-11/148/E-13/116-M Dt. 17-05-2019) | 17-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
64. | Purchase of Traction Battery Chargers for Various Mines - 10 Nos. (5 Lots) (Only Through e-procurement)(WE-19(ET/115) DT.17/05/2019) | 17-05-2019 | 13-06-2019 | 13-06-2019 | 14-06-2019 | 03:30 PM | Active | View |
65. | Fabrication of wooden and Iron Clamps for lowering of 120 Sqmm XLPE copper cable from Production shaft surface inset to 13.5L Underground at Balaghat Mine(BGT/TE/Elect/19-20/123) | 16-05-2019 | 04-06-2019 | 04-06-2019 | 04-06-2019 | 04:30 PM | Active | View |
66. | Purchase of Hand Held Electro-Hydraulic Drill Machine for Underground Mining Application at Various Mines - 6 Nos.(4 Lots) with Operation and Maintenance Spares (Only Through e-procurement)(WE-7(ET/113) DT.16/05/2019) | 16-05-2019 | 06-06-2019 | 06-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
67. | Transporting one no. TATA Hitachi make Excavator (Tata from Tirodi Mine to Dongri Buzurg Mine through Truck Trailer.( DB/MECH/19-20/SDGM(MECH)/ 51) | 16-05-2019 | 21-05-2019 | 21-05-2019 | 21-05-2019 | 04:30 PM | Active | View |
68. | Designing and printing of Annual Report 2018-19 Deluxe Version in English, Hindi and Marathi, Shareholder version and Abridged Version in English, Translation of text from English to Hindi and Marathi and handling charges(MOIL/19-20/ET/83) | 16-05-2019 | 06-06-2019 | 06-06-2019 | 06-06-2019 | 03:30 PM | Active | View |
69. | Purchase of Ventilation Fan Complete for various Mines - 3 Sets.(2 Lots) (Only Through e-procurement)(WE-9(ET/114) DT.16/05/2019) | 16-05-2019 | 06-06-2019 | 06-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
70. | Purchase of Dry Type Transformers for Various Mines - 6 Nos.(4 Lots) (Only Through e-procurement)(WE-8(ET/112) DT.15/05/2019) | 15-05-2019 | 06-06-2019 | 06-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
71. | PURCHASE OF TRIMBLE MAKE (S-6 MODEL) TOTAL STATION BATTERY.(PUR/MOIL/C-13/19/E-15/151-M DT.14.05.2019) | 15-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
72. | Purchase of High Speed Diesel (HSD)(PUR/MOIL/C-2/163/E-14/142-M DT.14/05/2019) | 14-05-2019 | 29-05-2019 | 29-05-2019 | 29-05-2019 | 03:30 PM | Active | View |
73. | Purchase of Motorised Rotary Tub Tippler for Gumgaon Mine(M.S) - 1 Set. (1 Lot) (Only Through e-procurement)(WE-16 (ET/110) DT.14/05/2019) | 14-05-2019 | 03-06-2019 | 03-06-2019 | 04-06-2019 | 03:30 PM | Active | View |
74. | Purchase of Double Deck Circular Motion Vibratory Screen for Munsar Mine(M.S) - 1 Set. (1 Lot) (Only Through e-procurement)(WE-17 (ET/111) DT.14/05/2019) | 14-05-2019 | 03-06-2019 | 03-06-2019 | 04-06-2019 | 03:30 PM | Active | View |
75. | LOADING UNLOADING AND FILLING SPREADING AT -70 LEVEL AND 60 LEVEL OF CHIKLA-B SECTION AT CHIKLA MINE(TE-32 Dt.13052019) | 13-05-2019 | 20-05-2019 | 20-05-2019 | 20-05-2019 | 04:30 PM | Active | View |
76. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR RCC WORK AT CH 1830 OF -470 LEVEL AND CH 1920 OF -370 LEVEL AT CHIKLA MINE(TE-31 Dt.13052019) | 13-05-2019 | 20-05-2019 | 20-05-2019 | 20-05-2019 | 04:30 PM | Active | View |
77. | Maintenance, Distribution and Collection of Caplamps for One Month( Elect/BGT/Caplamps/19-20/111) | 13-05-2019 | 24-05-2019 | 24-05-2019 | 24-05-2019 | 04:30 PM | Active | View |
78. | Facility Management Services for ERP Data Center(MOIL/19-20/ET/68) | 13-05-2019 | 12-06-2019 | 12-06-2019 | 12-06-2019 | 03:30 PM | Active | View |
79. | Hiring of Excavator for cleaning of fines pond Niagara plant at Ukwa Mine(16/Mining/UM/19-20/195) | 11-05-2019 | 25-05-2019 | 25-05-2019 | 25-05-2019 | 04:30 PM | Active | View |
80. | Recovery of cleaned ore from O/C ROM at Parsoda Mine(MOIL/19-20/ET/85) | 10-05-2019 | 24-05-2019 | 24-05-2019 | 24-05-2019 | 03:30 PM | Active | View |
81. | Picking and collection of Ferro grade and SM grade ore TDL-439 TDL-499 and TDL-469 from South Staff Quarter Dump at Tirodi Mine(MOIL/19-20/ET/64) | 10-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
82. | Recovery of Ferro grade TD-4505 and SM grade ore TDL-439 and TDL-499 from North Magazine Dump at Tirodi Mine( MOIL/19-20/ET/74) | 10-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
83. | Hiring of tippers for ore transportation from C and S Plant to siding at Chikla Mine(MOIL/19-20/ET/73) | 10-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
84. | Maintenance and operation of pumps for drinking water supply in camp area at Kandri Mine(MOIL/19-20/ET/49) | 09-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
85. | Construction of Residential quarters Tirodi Mine.(MOIL/19-20/ET/61) | 09-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
86. | Providing and installation of Bio toilets at Dongri Buzurg and Chikla Mine.(MOIL/19-20/ET/43) | 09-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
87. | Annual service maintenance contract for Winder System installed at Various Mine(MOIL/19-20/ET/67) | 09-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
88. | Annual repairs to camp quarters at Balaghat Mine.(MOIL/19-20/ET/47) | 09-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
89. | TRANSPORT OF EXPLOSIVE DETONATOR FROM PWD ROAD TO CHIKLA MINE MAGAZINE AT CHIKLA MINE(TE-30 Dt.09052019) | 09-05-2019 | 16-05-2019 | 16-05-2019 | 16-05-2019 | 04:30 PM | Active | View |
90. | Repairing and servicing of Actuators of Butterfly Valve of I.M.B Plant at Balaghat Mine(AGT/BGT/MECH/IMB/19-20/640) | 09-05-2019 | 28-05-2019 | 28-05-2019 | 28-05-2019 | 04:30 PM | Active | View |
91. | Major repairs/overhauling Ashok Leyland Engine AL 412TC2/1 of JCB-3 loader operating at Balaghat Mine(AGT/BGT/MECH/JCB/19-20/641) | 09-05-2019 | 28-05-2019 | 28-05-2019 | 28-05-2019 | 04:30 PM | Active | View |
92. | Purchase of SODIUM LAURYL SULPHATE - 5875 KG(WE-6 e-tender No.MOIL/19-20/ET-96, Dt.09.05.2019) | 09-05-2019 | 03-06-2019 | 03-06-2019 | 04-06-2019 | 03:30 PM | Active | View |
93. | Construction of sewage treatment plant at new colony (Chandmara) at Dongri Buzurg Mine .(MOIL/19-20/ET/44) | 09-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
94. | Providing furniture and interior works and civil works for laboratory on ground floor and Geology and Survey department at second floor of MOIL BHAWAN Nagpur(MOIL/19-20/ET/48) | 09-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
95. | Construction of Hostel building for Navin Desai Residential school Panchgaon Distt Nagpur under CSR(MOIL/19-20/ET/45) | 09-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
96. | Construction of Canteen building at Kandri Mine.(MOIL/19-20/ET/50) | 09-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
97. | Construction of shed over mobile crusher unit at Munsar Mine.(MOIL/19-20/ET/46) | 09-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
98. | Repairing of Track Rollers Assembly of Side Dump Loader-3 Nos. operating at Balaghat Mine(AGT/BGT/MECH/SDL/19-20/127) | 08-05-2019 | 17-05-2019 | 17-05-2019 | 17-05-2019 | 04:30 PM | Active | View |
99. | Removal of Garbage cleaning of Drains and septic tank etc. at camp qr. at Ukwa Mine(16/Civil/UM/19-20/127) | 08-05-2019 | 22-05-2019 | 22-05-2019 | 22-05-2019 | 04:30 PM | Active | View |
100. | Retiling and Reroofing of camp quarters at Kandri mine.(Kan/Civil/NIT/19-20/436 Dated 10.05.2019) | 08-05-2019 | 18-05-2019 | 18-05-2019 | 18-05-2019 | 04:30 PM | Active | View |
Tenders More Information |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2025) Year Tenders |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (205) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |