Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Construction of Bituminous Tar Road from Gate No 1 to Canteen and from Mine Entrance Gate via DAV Public School towards Katangi Highway at Chikla Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/3) 19-03-2024 25-04-2024 25-04-2024 25-04-2024 04:00 PM Active View
2. Construction of 1,00,000 litres and 30,000 Litres capacity Ground Storage industrial Effluent collection Tank along with pipe line Network at EMD Plant, Dongri Buzurg Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/2) 19-03-2024 18-04-2024 18-04-2024 18-04-2024 04:00 PM Active View
3. Maintenance and operation of water supply scheme at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/2027 DT. 19.03.2024) 19-03-2024 23-03-2024 23-03-2024 23-03-2024 05:30 PM Active View
4. Renovation of existing old Administrative Building at Chikla Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/1) 19-03-2024 25-04-2024 25-04-2024 25-04-2024 04:00 PM Active View
5. Purchase of Filters of CAT C13 ENGINE of FRD DCR 20 Drilling Machine operating at Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2023-24/1852) 18-03-2024 26-03-2024 26-03-2024 26-03-2024 04:30 PM Active View
6. PURCHASE OF FURNITURE FOR REST HOUSE of Gumgaon MINE(PUR/GUM/PER/23-24/ 1946) 18-03-2024 28-03-2024 28-03-2024 28-03-2024 04:30 PM Active View
7. Tub transportation from all level inset (U/g) to surface at 2nd vertical shaft.(AGT/MINING/UK/LT/2023-24/2023 DT. 18.03.202) 18-03-2024 23-03-2024 23-03-2024 23-03-2024 04:30 PM Active View
8. ALLIED WORKS AND LANDSCAPING WORKS FOR DEVELOPING CHILDREN PARK IN OFFICERS COLONY, CHIKLA MINE.(CH/Civil/NIT/23-24/1861 Date- 18.03.2024) 18-03-2024 01-04-2024 01-04-2024 01-04-2024 04:30 PM Active View
9. HIRING OF SERVICES OF ARCHITECT AND DESIGN ENGINEERS CONSULTANT FOR CONSTRUCTION OF NEW C TYPE QUARTERS - 16 UNITS AT CHIKLA MINE.(CH/Civil/NIT/23-24/1841 Date-14.03.2024) 18-03-2024 01-04-2024 01-04-2024 01-04-2024 04:30 PM Active View
10. Purchase of SHELL CORENA S3 R46 OIL FOR FRD DCR20 Drilling Machine of Dongri Buzurg Mine(PUR/MOIL/AGT/DB/2023-24/1812) 14-03-2024 20-03-2024 20-03-2024 20-03-2024 04:00 PM Active View
11. Purchase of Spares for D155 NO 5 Dozer of Dongri Buzurg Mine(PUR/MOIL/AGT/DB/2023-24/1811) 14-03-2024 20-03-2024 20-03-2024 20-03-2024 04:30 PM Active View
12. Purchase of Hydraulic filters for BEML make BH60 M dumpers.(PUR/MOIL/DB/2023-24/1814) 14-03-2024 04-04-2024 04-04-2024 04-04-2024 04:30 PM Active View
13. Purchase of Transmission Oil, TES439 OR Servo TransXL 439 for BEML 60T Dumpers of Dongri Buzurg Mine.(PUR/MOIL/DB/2023-24/1813) 14-03-2024 04-04-2024 04-04-2024 04-04-2024 04:30 PM Active View
14. Repairing of 6 Cyl. Diesel engine of Eicher School Bus of Balaghat Mine.(AGT/BGT/MECH/MG/23-24/1984) 13-03-2024 20-03-2024 20-03-2024 20-03-2024 04:30 PM Active View
15. Fabrication of Pneumatic Actuators Valves of Air Pulsating Jig for I.M.B Plant at Balaghat Mine.(AGT/MECH/IMB/23-24/1983) 13-03-2024 05-04-2024 05-04-2024 05-04-2024 04:30 PM Active View
16. HIRING OF SERVICES OF ARCHITECT AND DESIGN ENGINEERS CONSULTANT FOR MODIFICATIONB, UPGRADATION OF EXISTING GUEST HOUSE AT CHIKLA MINE.(Civil/CH/NIT/23-24/1810 Date-13.03.2024) 13-03-2024 27-03-2024 27-03-2024 27-03-2024 04:30 PM Active View
17. Repairing of three layers fencing in north sanction at Balaghat Mine(CIVIL/BGT/LTE/23-24/1982 Dt 12.03.2024) 12-03-2024 20-03-2024 20-03-2024 20-03-2024 04:30 PM Active View
18. Providing 06 nos of pump operator for south bed pit at tirodi mine(MOIL/TRD/MINE/2024/137/1935 DT 05.03.2024) 11-03-2024 19-03-2024 19-03-2024 19-03-2024 03:30 PM Active View
19. Preparation of Comprehensive Hydrogeological Report for renewal of existing ground water NOC of CGWA for Kandri Mine(Geol/KD/CGWA/T.E./23-24/1855 Date 04.03.2024) 11-03-2024 18-03-2024 18-03-2024 18-03-2024 04:30 PM Active View
20. Collection of primary and secondary data regarding ground water development and filling of CGWA NOC renewal application for Kandri Mine(Geo/KD/CGWA/T.E./23-24/1854 Date 04.03.2024) 11-03-2024 18-03-2024 18-03-2024 18-03-2024 04:30 PM Active View
21. In house Maintenance of Rest house, Mine Manager Bungalow, Canteen and Recreational hall at Gumgaon Mine(AGT/GUM/HR/LT/23-24/1898) 11-03-2024 18-03-2024 18-03-2024 18-03-2024 04:30 PM Active View
22. PURCHASE OF SPARE OF 240HP KIRLOSKAR MAKE CENTRIFUGAL PUMP. MODEL-RKB-125/3OK, 8STG AT BALAGHAT MINE.(PUR/MOIL/BGT/PUMP/23-24/1965) 09-03-2024 28-03-2024 28-03-2024 28-03-2024 04:30 PM Active View
23. PURCHASE OF SPARE OF 240HP KIRLOSKAR MAKE CENTRIFUGAL PUMP. MODEL-RKB-125/3OK, 8STG AT BALAGHAT MINE.(PUR/MOIL/BGT/PUMP/23-24/1965) 09-03-2024 28-03-2024 28-03-2024 28-03-2024 04:30 PM Active View
24. PURCHASE OF PIPE-FITTINGS AND ACCESSORIES FOR UNDERGROUND LEVELS OF BALAGHAT MINE.(PUR/MOIL/PIPE-FITGS/23-24/1966) 09-03-2024 28-03-2024 28-03-2024 28-03-2024 04:30 PM Active View
25. PROVIDING, FIXING AND INSTALLATION OF SUBMERSIBLE PUMPS FOR WATER SUPPLY SCHEME AT CHIKLA MINE.(CH/Civil/NIT/23-24/1799 Dt.09.03.2024) 09-03-2024 19-03-2024 19-03-2024 19-03-2024 04:30 PM Active View
26. Supplying of Different Plant Species Indoor and Outdoor for Guest House, Administrative Office of EMD and Mine and Childrens Park at Dongribuzurg Mine(DB/CIVIL/NIT/TE/2023-24/1791 07.03.2024) 08-03-2024 16-03-2024 16-03-2024 16-03-2024 04:30 PM Active View
27. Procurement of 2500 Cu. Mtrs. of Dissolved Oxygen Gas Cylinders for the Balaghat Mine.(PUR/BGT/OXY-CYL/23-24/1956) 08-03-2024 15-03-2024 15-03-2024 15-03-2024 04:30 PM Active View
28. PURCHASE OF SPARES FOR BBC-16 DRILL MACHINE AND BMT-51 AIR LEGS FOR UNDERGROUND DRILL MACHINE OF BALAGHAT MINE.(PUR/MOIL/BGT/BBC/23-24/1957) 08-03-2024 20-03-2024 20-03-2024 20-03-2024 04:30 PM Active View
29. PURCHASE OF COPPER WELDING CABLE AND PTFE GLAND ROPE FOR UNDERGROUND PUMPS OF BALAGHAT MINE.(UR/MOIL/PTFE-CABLE/23-24/1955) 08-03-2024 29-03-2024 29-03-2024 29-03-2024 04:30 PM Active View
30. Major Overhauling of 150HP Flow-More Multistage Pump of Balaghat Mine.(AGT/BGT/MECH/PUMP/23-24/1958) 08-03-2024 28-03-2024 28-03-2024 28-03-2024 04:30 PM Active View
31. Magazine materials handling of Mine Magazine at Gumgaon Mine.(Agent/Gum/Min/23-24/1827, date 01.03.2024) 08-03-2024 18-03-2024 18-03-2024 18-03-2024 04:30 PM Active View
32. Providing and fixing of Amusement Rides for developing Children Park and Recreational Space in Chandmara Colony, Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/1756 01.03.24) 07-03-2024 12-03-2024 12-03-2024 12-03-2024 04:30 PM Active View
33. Widening of Lane adjacent to Diesel Pump to ensure smooth mobility of heavy vehicles inside Workshop Premises from safety perspective at Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/1755 01.03.24) 07-03-2024 12-03-2024 12-03-2024 12-03-2024 04:30 PM Active View
34. Construction of Two Wheeler Parking shed and fixing of Grill and paving Block beside Medical administrative Building, MOIL Nagpur.(MOIL/MOIL LIMITED/CMC/23-24/ET/126) 06-03-2024 05-04-2024 05-04-2024 05-04-2024 04:00 PM Active View
35. MS NUT AND BOLT OF SIZE 5 8 X 3 inch FOR BALAGHAT(PUR/BGT/MS Bolt/23-24/1929) 05-03-2024 20-03-2024 20-03-2024 20-03-2024 04:30 PM Active View
36. Construction of Community hall for Chandmara colony, Dongri Buzurg Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/125) 05-03-2024 04-04-2024 04-04-2024 04-04-2024 04:00 PM Active View
37. Construction of Sand Stowing Plant at Gumgaon Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/128) 05-03-2024 12-04-2024 12-04-2024 12-04-2024 04:00 PM Active View
38. Construction of Two Wheeler Parking shed near BDC and Pit office premises at Kandri Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/127) 05-03-2024 12-04-2024 12-04-2024 12-04-2024 04:00 PM Active View
39. Filling and spreading at minus 470 ft Level Chikla main section at Chikla Mine.(Mining/CH/T.E./23-24/1749) 05-03-2024 12-03-2024 12-03-2024 12-03-2024 04:30 PM Active View
40. Collection and disposal of Garbage and cleaning of drains sewer lines in camp colony at Balaghat Mine(HR/BGT/LTE/23-24/1941 Dt 05.03.2024) 05-03-2024 13-03-2024 13-03-2024 13-03-2024 04:30 PM Active View
41. Providing and fixing Retro reflective Sign and Informatory Boards at Balaghat Mine(CIVIL/BGT/LTE/23-24/1918 Dt 03.03.2024) 04-03-2024 12-03-2024 12-03-2024 12-03-2024 04:30 PM Active View
42. Laying of concrete in front of store at Balaghat Mine(CIVIL/BGT/LTE/23-24/1920 Dt 03.03.2024) 04-03-2024 12-03-2024 12-03-2024 12-03-2024 04:30 PM Active View
43. Procurement of OLTC (On-Load Tap Changer) Spares for 6 MVA Transformer in Ferro Manganese Plant, Balaghat Mine(TE/MOIL/FMP/BGT/ELECT./23-24/ 544) 04-03-2024 21-03-2024 21-03-2024 21-03-2024 04:30 PM Active View
44. Picking and collection of 20 percentage Mn SM Grade ore (BGT564) from Sub at Balaghat Mine(MINING/BGT/LTE/23-24/1924 Dt 03.03.2024) 04-03-2024 12-03-2024 12-03-2024 12-03-2024 04:30 PM Active View
45. External Painting to hospital building at Balaghat Mine(CIVIL/BGT/LTE/23-24/1919 Dt 03.03.2024) 04-03-2024 12-03-2024 12-03-2024 12-03-2024 04:30 PM Active View
46. Providing 15 mbps 1 is to 1 Internet Leased Line at Kandri Mine(ADGM/GrpIIISYS/NW/2023-24/1838) 04-03-2024 12-03-2024 12-03-2024 12-03-2024 04:00 PM Active View
47. Surface excavation work in front of Officers colony at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/1901 DT. 04/03/2024) 04-03-2024 12-03-2024 12-03-2024 12-03-2024 04:30 PM Active View
48. Loading and Unloading of steel sections, timber and cement bags and other material at mine stores of Ukwa Mine.(AJGM/UK/MECH/2023-24/1922) 04-03-2024 12-03-2024 12-03-2024 12-03-2024 04:30 PM Active View
49. Artificial pillar of RCC for supporting to the roof at 95 incline section at Ukwa Mine.(AGT/MINING/UK/LT/23-24/1930 Dt.04.03.2024) 04-03-2024 11-03-2024 11-03-2024 11-03-2024 04:30 PM Active View
50. Drilling of muck generation hole at 950 level of 2nd vertical shaft at Ukwa Mine.(AGT/MINING/UK/LT/23-24/1931 Dt.04.03.2024) 04-03-2024 11-03-2024 11-03-2024 11-03-2024 04:30 PM Active View
51. REQUEST FOR EXPRESSION OF INTEREST (EOI) FOR UNDERTAKING THE WORK OF VERTICAL SHAFT EQUIPPING AND FURNISHING AT OUR BALAGHAT AND GUMGAON MINE(EOI/MOIL/CMC/TEC/BG GM/2024/309) 04-03-2024 03-04-2024 03-04-2024 03-04-2024 04:00 PM Active View
52. Engaging Implementing partner for running of School at Ukwa Village.(MOIL/MOIL LIMITED/CMC/23-24/ET/130) 02-03-2024 10-04-2024 10-04-2024 10-04-2024 04:00 PM Active View
53. Fabrication of Track Regular Pin for Tata Hitachi 1200 no 2 Hydraulic Excavator of Dongri Buzurg Mine.(DB/MECH/AGT/23-24/ 1736) 01-03-2024 21-03-2024 21-03-2024 21-03-2024 04:30 PM Active View
54. Transportation of segment from Holmes Shaft at 10th Level to 9th Level and 8th Level at Balaghat Mine(MINING/BGT/LTE/23-24/1891 Dt 28.02.2024) 01-03-2024 11-03-2024 11-03-2024 11-03-2024 04:30 PM Active View
55. Removal of suppressed muck from Ch. 40 to Ch 27 at 12th L (North) Balaghat Mine(MINING/BGT/LTE/23-24/1890 Dt 28.02.2024) 01-03-2024 11-03-2024 11-03-2024 11-03-2024 04:30 PM Active View
56. RCC Foundations of Oil type Double Shaft Grizzly for Mobile Crusher Unit at 2nd vertical Shaft at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/1900 DT. 29.02.2024) 29-02-2024 09-03-2024 09-03-2024 09-03-2024 04:30 PM Active View
57. TESTING, SERVICING AND MAINTENANCE OF 33KV AND 11KV HT VCB(BGT/TE/ELECT/AJGM/23-24/1884) 28-02-2024 19-03-2024 19-03-2024 19-03-2024 03:30 PM Active View
58. PROVIDING AND SUPPLYING OF 13 Mtr. 152 mm X 152mm HBEAM POLE FOR 33KV(ELECT/BGT/AJGM/23-24/1893) 28-02-2024 20-03-2024 20-03-2024 20-03-2024 03:30 PM Active View
59. Collecting canteen food itmes,drinks and carrying it for service to mine employee at tirodi mine.(TRD/PERS/23-24/796 DATED 11/02/2024) 27-02-2024 04-03-2024 04-03-2024 04-03-2024 03:00 PM Active View
60. Fabrication supply installation and commissioning of conveyor belt qty 2 Nos for new leaching vessel at EMD Plant D B Mine(MOIL/DB/EMD/ADGM/23-24/1711) 26-02-2024 09-03-2024 09-03-2024 09-03-2024 04:30 PM Active View
61. Major Overhauling of 200HP Kirloskar Pump at Ukwa mine.(AJGM/UK/MECH/2023-24/1872) 26-02-2024 06-03-2024 06-03-2024 06-03-2024 04:30 PM Active View
62. Procurement of 03 Nos. of Mono-block pumps for Dewatering of Ukwa Mine.(AJGM/UK/MECH/2023-24/1873) 26-02-2024 06-03-2024 06-03-2024 06-03-2024 04:30 PM Active View
63. Purchase of FILTER KIT P.N.K30341103 for PC450 Hydraulic Excavator for Dongri Buzurg Mine from Manufacturer OEM OR Authorized Dealer(PUR/MOIL/AGT/DB/2023-24/1694) 24-02-2024 07-03-2024 07-03-2024 07-03-2024 04:30 PM Active View
64. Purchase of Spares Drill pipe 89mm for FRD DCR 20 DRILL MACHINE for Dongri Buzurg Mine(PUR/MOIL/AGT/DB/2023-24/ 1693) 24-02-2024 07-03-2024 07-03-2024 07-03-2024 04:30 PM Active View
65. Purchase of Spares Hammer and Button bit for FRD DCR 20 DRILL MACHINE for Dongri Buzurg Mine(PUR/MOIL/AGT/DB/2023-24/ 1695) 24-02-2024 29-02-2024 29-02-2024 29-02-2024 04:30 PM Active View
66. Ancillary Works for Transformer cum Rectifier Room of EMD Plant, Dongribuzurg Mine.(DB/EMD/CIVIL/NIT/TE/23-24/1710 22.2.24) 24-02-2024 02-03-2024 02-03-2024 02-03-2024 04:30 PM Active View
67. Allied Civil Works and Landscaping Works for developing Childrens Park in Officers Colony, Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/1709 22.02.24) 24-02-2024 02-03-2024 02-03-2024 02-03-2024 04:30 PM Active View
68. Painting Works to Plant Structure of EMD Plant, Dongribuzurg Mine(DB/EMD/CIVIL/NIT/TE/23-24/1703 22.02.24) 24-02-2024 29-02-2024 29-02-2024 29-02-2024 04:30 PM Active View
69. Drilling of Muck generation(AGT/MINING/UK/LT/23-24/1865 DT. 24.02.2024) 24-02-2024 02-03-2024 02-03-2024 02-03-2024 04:30 PM Active View
70. Purchase of Cummins QSK 19C engine filters for BEML 60T Dumpers(PUR/MOIL/DB/2023-24/1705) 23-02-2024 02-03-2024 02-03-2024 02-03-2024 04:30 PM Active View
71. LAYING OF 3C X 240SQMM, 11KV XLPEDWA COPPER CONDUCTOR CABLE AT 33KV/11KV SUBSTATION AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/23-24/1860) 23-02-2024 15-03-2024 15-03-2024 15-03-2024 03:30 PM Active View
72. Outsourcing of General Maintenance of Electrical Equipments for 2 Months at Tirodi Mine(TRD/ELECT/2023-24/1836) 22-02-2024 29-02-2024 29-02-2024 29-02-2024 03:30 PM Active View
73. PROVIDING SUPPLYING AND INSTALLATION OF ESE LIGHTNING ARRESTOR FOR WEIGH BRIDGE AT TIRODI MINE(TRD/ELECT/2023-24/1829) 22-02-2024 28-02-2024 28-02-2024 28-02-2024 03:30 PM Active View
74. TENDER DOCUMENTS FOR ELECTRICAL REWIRING OF RESIDENTIAL B TYPE QUARTERS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/23-24/1852) 22-02-2024 14-03-2024 14-03-2024 14-03-2024 03:30 PM Active View
75. Casting and Machining of Plumber Block Body-2Nos. of Pinion Gear Shaft of Holmes Shaft Skip Winder-550HP of Balaghat Mine.(AGT/BGT/MECH/HS/23-24/1840) 21-02-2024 12-03-2024 12-03-2024 12-03-2024 04:30 PM Active View
76. Hiring of loader for Stacking of raw materials and Shifting of Crude metal dust to jig yard at Ferro Manganese Plant, Balaghat Mine(TE/MOIL/FMP/2023-24/526) 21-02-2024 06-03-2024 06-03-2024 06-03-2024 03:30 PM Active View
77. Providing and fitting of Electrical Actuated Butterfly Valve for Kirloskar Make Centrifugal Pump -422HP of Balaghat Mine.(AGT/MECH/422HP/2023-24/1841) 21-02-2024 12-03-2024 12-03-2024 12-03-2024 04:30 PM Active View
78. Civil Modification Renovation and Maintenance Repair works at Various Companies premises corporate office MOIL Nagpur.(MOIL/MOIL LIMITED/CMC/23-24/ET/122) 21-02-2024 22-03-2024 22-03-2024 22-03-2024 04:00 PM Active View
79. Concreting by using Pre-cast slab in underground at Gumgaon Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/119) 21-02-2024 30-03-2024 30-03-2024 30-03-2024 02:00 PM Active View
80. Construction of new high Explosive Magazine along with office and Security Watch tower at Chikla Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/120) 21-02-2024 30-03-2024 30-03-2024 30-03-2024 02:00 PM Active View
81. Construction of Mechanical tool room for 1st vertical shaft premises at Chikla Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/121) 21-02-2024 30-03-2024 30-03-2024 30-03-2024 02:00 PM Active View
82. Purchase of Spares for FRD DCR 20 DRILL MACHINE(PUR/MOIL/AGT/DB/2023-24/1675) 20-02-2024 05-03-2024 05-03-2024 05-03-2024 04:30 PM Active View
83. Design, Procurement, Supply, Fabrication, Erection, Installation and Commissioning of New CandS Plant of 70 TPH capacity near 2nd Vertical Shaft at Ukwa Mine(MOIL/MOIL LIMITED/CMC/23-24/ET/117) 20-02-2024 28-03-2024 28-03-2024 28-03-2024 04:00 PM Active View
84. Lowering of 240 Sq mm L T Cable through shaft from top to 2nd L to 3rd L at Munsar Mine(AGT/MUN//ELECTR/NIT/23-24/1746 DT 16/02/2024) 20-02-2024 06-03-2024 06-03-2024 06-03-2024 04:30 PM Active View
85. PURCHASE OF FURNITURE FOR REST HOUSE OF GUMGAON MINE(PUR/GUM/PER/23-24/ 1754 DT 19.02.2024) 20-02-2024 26-02-2024 26-02-2024 26-02-2024 04:30 PM Active View
86. Procurement of Resistance Control Box for Ukwa Mine(UK/ELECT/2023-24/1834) 19-02-2024 26-02-2024 26-02-2024 26-02-2024 04:30 PM Active View
87. Repairing of road by spreading of filling material at approach road of Mine Ground to Canteen Building at Ukwa Mine.(V) 19-02-2024 27-02-2024 27-02-2024 27-02-2024 04:30 PM Active View
88. Outsource the work of Maintenance Collection and Distribution of cap lamp for 3 three months at Munsar Mine.(AGT/MUN/ELECT/NIT/23-24/1750 DT 17/02/2024) 17-02-2024 23-02-2024 23-02-2024 23-02-2024 04:30 PM Active View
89. Making G.I. Sheet Shed roofing for Shed for Housing new Compressor at Kandri Mine(CIVIL/KD/T.E./23-24/1742 Date - 16.02.2024) 17-02-2024 24-02-2024 24-02-2024 24-02-2024 04:30 PM Active View
90. Remewal of Structure stability test certificate of Head Gear structure of kandri Mine(Mech/KD/23-24/3803) 17-02-2024 11-03-2024 11-03-2024 12-03-2024 04:30 PM Active View
91. Collecting canteen food items drinks carrying it for serving to mine employees at Munsar Mine(AGT/MUN/PER/NIT/23-24/2650 DT 17/02/2024) 17-02-2024 28-02-2024 28-02-2024 28-02-2024 04:30 PM Active View
92. Filing and spreading at minus 370 L Chikla main section of Chikla Mine.(Mining/CH/T.E./23-24/1665) 17-02-2024 24-02-2024 24-02-2024 24-02-2024 04:30 PM Active View
93. Procurement of Electrical Operated Auxiliary Ventilation Fan along with starter panel -1no. for Balaghat Mine.(PUR/BGT/CAP/FAN/23-24/1828) 16-02-2024 19-03-2024 19-03-2024 19-03-2024 04:30 PM Active View
94. Purchase of SYNTHETIC HYDRAULIC OIL HN46 P.N.TL01210 for Tata Ex 1200 Hydraulic Excavator for Dongri Buzurg Mine(PUR/MOIL/AGT/DB/2023-24/1641) 16-02-2024 07-03-2024 07-03-2024 07-03-2024 04:30 PM Active View
95. PURCHASE OF MS NUT AND BOLT OF SIZE 5/8X2.5 inch FOR BALAGHAT MINE.(PUR/BGT/MS Bolt/23-24/1827) 16-02-2024 27-02-2024 27-02-2024 27-02-2024 04:30 PM Active View
96. PURCHASE OF SPROCKET ASSY. AND FINAL DRIVE SPARES FOR HYDRAULIC EXCAVATOR TATA HITACHI-220 OF BALAGHAT MINE(PUR/BGT/Tata-220/23-24/1824) 16-02-2024 29-02-2024 29-02-2024 29-02-2024 04:30 PM Active View
97. PURCHASE OF WEAR PLATES WITH CSK BOLT AND NUT FOR SPIRAL CLASSIFIER OF IMB PLANT OF BALAGHAT MINE.(PUR/MOIL/BGT/IMB/23-24/1823) 16-02-2024 15-03-2024 15-03-2024 15-03-2024 04:30 PM Active View
98. PROCUREMENT OF SPARES FOR LOAD HAUL DUMP LOADER- LHD MACHINE OF BALAGHAT MINE(PUR/MOIL/BGT/LHD/23-24/1826) 16-02-2024 22-02-2024 22-02-2024 22-02-2024 04:30 PM Active View
99. PROCUREMENT OF SPARES FOR ATLAS COPCO COMPRESSOR GA 160W OF BALAGHAT MINE.(PUR/BGT/160W-Comp/23-24/1825) 16-02-2024 05-03-2024 05-03-2024 05-03-2024 04:30 PM Active View
100. Providing 10 mbps 1 is to 1 Internet Leased Line at Gumgaon Mine(ADGM/GrpIIISYS/NW/2023-24/1725) 16-02-2024 23-02-2024 23-02-2024 23-02-2024 03:30 PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (205) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.