Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Refurbishment of Production Shaft by replacing Guide Rails from zero to 4th level at Balaghat Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/39) 02-07-2024 09-08-2024 09-08-2024 09-08-2024 04:00 PM Active View
2. Repairing of double deck vibration screen of Niagra plant Ukwa Mine(AJGM/UK/MECH/2024-25/454) 29-06-2024 06-07-2024 06-07-2024 06-07-2024 04:30 PM Active View
3. Major Repairing of 80 HP centrifugal pump of 1st Vertical 2nd level of Ukwa Mine.(AJGM/UK/MECH/2024-25/463) 29-06-2024 06-07-2024 06-07-2024 06-07-2024 04:30 PM Active View
4. Up-gradation of Tramline by replacing with Diamond, RHS and LHS crossing at Underground of Ukwa Mine(AJGM/UK/MECH/2024-25/462) 29-06-2024 06-07-2024 06-07-2024 06-07-2024 04:30 PM Active View
5. Rollers for conveyor belts installed at DSU and MSP at Munsar Mine(PUR/MOIL/AGTGRIII/MS/2425/466) 29-06-2024 16-07-2024 16-07-2024 16-07-2024 04:30 PM Active View
6. Construction of Stores Complex at Balaghat Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/35) 29-06-2024 30-07-2024 30-07-2024 30-07-2024 04:00 PM Active View
7. construction of Boundary wall at Government middle School of Sukali Village under MOIL CER.(MOIL/MOIL LIMITED/CMC/24-25/ET/28) 29-06-2024 06-08-2024 06-08-2024 06-08-2024 04:00 Active View
8. Hiring front end loader to make up for the breakdown time of departmental loader and shovel and ensure the smooth running of our production and dispatch activities at Balaghat Mine(MINING/BGT/LTE/24-25/468 Dated 28.06.2024) 28-06-2024 04-07-2024 04-07-2024 04-07-2024 04:30 PM Active View
9. Chemical Analysis by different methods at EMD Plant Laboratory Dongri Buzurg Mine. (2nd Call)(MOIL/DB/EMD/ADGM/TE/24-25/482) 27-06-2024 19-07-2024 19-07-2024 19-07-2024 04:30 PM Active View
10. Digging of suppressed muck at 13.5th level North from Ch 40 to Ch 27 Balaghat Mine(MINING/BGT/LTE/24-25/1133 Dated 27.06.2024) 27-06-2024 02-07-2024 02-07-2024 02-07-2024 04:30 PM Active View
11. Hiring of JCB for cutting of open drain along canal of Sitapatore Mine(SP/Mining/24-25/415 Dated 27/06/2024) 27-06-2024 02-07-2024 02-07-2024 02-07-2024 04:00 PM Active View
12. Repair of kachcha road from new Industrial Shed to 6 no. pit at Sitapatore Mine(SP/Mining/24-25/417 Dated 27/06/2024) 27-06-2024 02-07-2024 02-07-2024 02-07-2024 04:00 PM Active View
13. Making of safety embankment along benches at 2 no. and 3 no. pit in mine area of Sitapatore Mine(SP/Mining/24-25/416 Dated 27/06/2024) 27-06-2024 02-07-2024 02-07-2024 02-07-2024 04:00 PM Active View
14. REPAIR AND REWINDING OF 80V, 7.5KW, 10HP DC SERIES MOTOR, 02NOS.(BGT/TE/ELECT/AJGM/24-25/460) 27-06-2024 11-07-2024 11-07-2024 11-07-2024 03:30 PM Active View
15. Drain Cleaning at 1750L 1st vertical from Ch 6900 to Ch 5100 around 540m.(AGT/MINING/UK/LT/2024-25/461 Dt. 27.06.2024) 27-06-2024 03-07-2024 03-07-2024 03-07-2024 06:30 PM Active View
16. Transportation of Bottom Ash from Khasala Ash Pond to sand stowing plant of Gumgaon Mine.(Gum/Min/2024-25/839, Date 26.06.2024) 26-06-2024 06-07-2024 06-07-2024 06-07-2024 04:30 PM Active View
17. Proprietory Single Tender enquiry in Single bid for purchase of Servomesh XP 460 oil for Shanthi make Gear box of 350 HP Winder at Gumgaon Mine.(GUM/ENGG/PUR/24-25/831) 26-06-2024 06-07-2024 06-07-2024 06-07-2024 03:30 PM Active View
18. Construction of Earth Pits for 12000 Chainage Substation at Ukwa Mine(UK/ELECT/2024-25/450) 25-06-2024 02-07-2024 02-07-2024 02-07-2024 04:30 PM Active View
19. Major Repairing of 80 HP centrifugal pump of 9500 Section at Ukwa Mine.(AJGM/UK/MECH/2024-25/435) 25-06-2024 03-07-2024 03-07-2024 03-07-2024 04:30 PM Active View
20. Reconditioning Radiator of 1500 KVA streling Generator of Ukwa Mine.(AJGM/UK/MECH/2024-25/446) 25-06-2024 04-07-2024 04-07-2024 04-07-2024 04:30 PM Active View
21. Leaf spring assy. Repairing, Up-gradation and tensioning work of Tippers of Ukwa Mine.(AJGM/UK/MECH/2024-25/436) 25-06-2024 04-07-2024 04-07-2024 04-07-2024 04:30 PM Active View
22. Painting to residential quarters ( transfer from Mine) at Munsar Mine(LT/CIVIL/MUN/2024-25/459 Date 25.06.2024) 25-06-2024 08-07-2024 08-07-2024 08-07-2024 04:00 PM Active View
23. Providing and supplying of Jute folder as per sample at Vocational training at Munsar Mine.(LT/ VT/MUN/AGT/2024-25/460 Date 25.06.2024) 25-06-2024 09-07-2024 09-07-2024 09-07-2024 04:00 PM Active View
24. Requirement of manpower for watch and ward at Sitapatore Mine(SP/PERS/24-25/407 DATED 25/06/2024) 25-06-2024 01-07-2024 01-07-2024 01-07-2024 04:00 PM Active View
25. Cleaning of surface drains and deepening work in industrial premises at Balaghat Mine(CIVIL/BGT/LTE/24-25/1070 Dt.23.06.2024) 24-06-2024 28-06-2024 28-06-2024 28-06-2024 04:30 PM Active View
26. Laying and repairing of tramline at Ch-12000 adit section.(AGT/MINING/UK/LT/2024-25/377 DT. 22.06.2024) 22-06-2024 29-06-2024 29-06-2024 29-06-2024 04:30 PM Active View
27. Laying and repairing of Tramline at Ch-12000 adit Section.(AGT/MINING/UK/LT/2024-25/377 DT. 22.06.2024) 22-06-2024 27-06-2024 27-06-2024 27-06-2024 04:30 PM Active View
28. Drain Cleaning at 1750L 1st vertical from Ch-6900 to Ch5100, around 540m.(AGT/MINING/UK/LT/2024-25/378 DT. 22.06.2024) 22-06-2024 29-06-2024 29-06-2024 29-06-2024 04:30 PM Active View
29. Purchase of Button Bit for Furukawa Rock Drill Machine operating at Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2024-25/441) 21-06-2024 27-06-2024 27-06-2024 27-06-2024 04:30 PM Active View
30. RCC Roof repair works to camp quarters of Gudma Camp near old hospital and officers Colony at Ukwa Mine.(AGT/CIVIL/UK/LT/2024-25/376 DT. 20.06.2024) 20-06-2024 27-06-2024 27-06-2024 27-06-2024 05:30 PM Active View
31. Drilling of Bore hole (12 inch) with M.S. casing pipe (8 inch) for drinking water supply scheme at Munsar Mine(LT/CIVIL/MUN/2024-25/414 Date 16.06.2024) 19-06-2024 28-06-2024 28-06-2024 28-06-2024 04:00 PM Active View
32. Removing and repairing of 7.5 Hp pump, 5 HP, , 2 HP old submercible and Instalaltion of new 5 HP submersible pump and 2 HP mono block pump near Hanuman temple, rest house, STp, officer colony, siding area and KL pit at Munsar Mine(LT/CIVIL/MUN/2024-25/413 Date 16.06.2024) 19-06-2024 28-06-2024 28-06-2024 28-06-2024 04:00 PM Active View
33. Miscellaneous plumbing works at Camp quarters at Munsar Mine(LT/CIVIL/MUN/2024-25/412 Date 16.06.2024) 19-06-2024 28-06-2024 28-06-2024 28-06-2024 04:00 PM Active View
34. Monsoon Preparation work at open cast surface area at Munsar Mine(LT/CIVIL/MUN/2024-25/411 Date 16.06.2024) 19-06-2024 28-06-2024 28-06-2024 28-06-2024 04:00 PM Active View
35. PURCHASE OF DRIVE COOLING FAN FOR 160KW, 445AMPS, AC DRIVE OF SOUTH VENTILATION FAN(BGT/TE/ELECT/AJGM/24-25/415) 19-06-2024 08-07-2024 08-07-2024 08-07-2024 03:30 PM Active View
36. Digging and cleaning of suppressed muck from Ch 25 to Ch 40 at 12th level Balaghat Mine(MINING/BGT/LTE/24-25/1011 Dated 17.06.2024) 18-06-2024 24-06-2024 24-06-2024 24-06-2024 04:30 PM Active View
37. Hiring of equipment for removal of waste rock and handeling the same by mechanized means at 50 52 area south section without drilling and blasting at Tirodi Mine.(MOIL/TD01/MINE/2024/464/405 DATED 17/06/2024) 18-06-2024 24-06-2024 24-06-2024 24-06-2024 04:00 PM Active View
38. Outsourcing the work of making, collecting canteen items and serving it in UG, BDC, Workshop and Administrative building of Kandri Mine.(KD/PER/NIT/ 24-25/636) 18-06-2024 10-07-2024 10-07-2024 10-07-2024 04:30 PM Active View
39. Providing and Installation of water flow meter for New Water Supply Scheme at Gumgaon Mine(MMT/GUM/Civil/LT/24-25/756 DT 18.06.2024/05/2023) 18-06-2024 02-07-2024 02-07-2024 02-07-2024 04:30 PM Active View
40. RETILING AND ROOF REPAIR INCLUDING LAYING POLYTHENE SHEET OVER ROOF OF CAMP QUARTER.(CH/CIVIL/NIT/24-25/910 DT.15.06.2024) 18-06-2024 27-06-2024 27-06-2024 27-06-2024 04:30 PM Active View
41. CLEANING AND DESILTING OF WELL (3 NOS) OF CHIKLA MINE.(CH/Civil/NIT/24-25/411 DT.15.06.2024) 18-06-2024 27-06-2024 27-06-2024 27-06-2024 04:30 PM Active View
42. Purchase of Drill Pipe 89mm for FRD DCR 20 Drill Machine Operating at Dongri Buzurg Mine(PUR/MOIL/AGT/DB/2024-25/406) 17-06-2024 29-06-2024 29-06-2024 29-06-2024 04:30 PM Active View
43. Purchase of Hammer Mission for FRD DCR 20 DRILLING MACHINE Operating at Dongri Buzurg Mine(PUR/MOIL/AGT/DB/2024-25/405) 17-06-2024 29-06-2024 29-06-2024 29-06-2024 04:30 PM Active View
44. RCC roof repairs of camp quarters at Balaghat Mine(CIVIL/BGT/LTE/24-25/1022 Dt.17.06.2024) 17-06-2024 24-06-2024 24-06-2024 24-06-2024 04:30 PM Active View
45. Providing PVC Polythene Sheets to mangalore Tiled Roofing to camp Quarter and tarpaulin sheets over Quarter allotted to SISF security persons including various miscellaneous repair works and retiling at Ukwa mine.(AGT/CIVIL/UK/LT/2024-25/375 DT. 17.06.2024) 17-06-2024 24-06-2024 24-06-2024 24-06-2024 04:30 PM Active View
46. Construction of Drain inside of rest house no 2 at Balaghat Mine(CIVIL/BGT/LTE/24-25/1023 Dt.17.06.2024) 17-06-2024 24-06-2024 24-06-2024 24-06-2024 04:30 PM Active View
47. Operation of Pumps and other related works at Beldongri underground mine at various locations.(AGT/MIN/BEL/2024-25/389 DT. 14.06.2024) 15-06-2024 21-06-2024 21-06-2024 21-06-2024 04:30 PM Active View
48. Digging ,Screening and Stacking of Fines From Various Places Beldongri and Satak Mine.(AGT/MIN/BEL/2024-25/388 DT. 14.06.2024) 15-06-2024 04-07-2024 04-07-2024 04-07-2024 04:00 PM Active View
49. Operation of Pumps and other related works at Old and New Satak Mine(AGT/MIN/BEL/2024-25/390 DT. 14.06.2024) 15-06-2024 21-06-2024 21-06-2024 21-06-2024 04:30 PM Active View
50. Providing and fixing of FRP doors in WC/Bath to camp quarters at Ukwa Mine.(AGT/CIVIL/UK/LT/2024-25/373 DT. 15.06.2024) 15-06-2024 22-06-2024 22-06-2024 22-06-2024 04:30 PM Active View
51. Drain Cleaning from Ch-12000 adit from entrance to 11th incline (Ch- 12800 to Ch14056), around 330m at Ukwa Mine.(AGT/MINING/UK/LT/2024-25/372 DT. 15/06/2024) 15-06-2024 22-06-2024 22-06-2024 22-06-2024 04:30 PM Active View
52. Construction of new high Explosive Magazine along with office and Security Watch tower at Chikla Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/37) 15-06-2024 23-07-2024 23-07-2024 23-07-2024 04:00 PM Active View
53. Construction of ventilation fan room for 50 section of Ukwa mine.(AGT/CIVIL/UK/LT/2024-25/374 DT. 15.06.2024) 15-06-2024 22-06-2024 22-06-2024 22-06-2024 05:30 PM Active View
54. Construction of ventilation fan room for 50 section of Ukwa mine.(AGT/CIVIL/UK/LT/2024-25/374 DT. 15.06.2024) 15-06-2024 22-06-2024 22-06-2024 22-06-2024 05:30 PM Active View
55. XTRA EXCAVATION AT 2ND LEVEL IN MUNSAR MINE(MUN/TENDER/24-25/406) 15-06-2024 21-06-2024 21-06-2024 21-06-2024 04:30 PM Active View
56. The transportation of sand from Kanhan River to the area near Rest House.(Agent/Gum/Min/24-25/391 Date-14.06.2024) 14-06-2024 24-06-2024 24-06-2024 24-06-2024 04:30 PM Active View
57. Hiring of Statutory Staff (Mine Mate) for High Speed Shaft at Gumgaon Mine.(AGT/GUM/HR/LT/24-25/393, Date 14.06.2024) 14-06-2024 22-06-2024 22-06-2024 22-06-2024 04:30 PM Active View
58. Construction of foundation and other Steel Structural support System for Installation and commissioning of 3 TPH fluidized Bed combustion Steam Boiler at EMD plant, Dongri Buzurg Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/34) 14-06-2024 22-07-2024 22-07-2024 22-07-2024 04:00 PM Active View
59. Providing and Installation of bio Toilets at 5th Level and 6h level in under ground Mine at kandri Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/29) 14-06-2024 15-07-2024 15-07-2024 15-07-2024 04:00 PM Active View
60. Construction of Storm water drains at Tighai village (420 Rmt) and Bawangaon village (230 Rmt) under MOIl CER of Gumgaon Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/27) 14-06-2024 15-07-2024 15-07-2024 15-07-2024 04:00 PM Active View
61. Construction of Bituminous Tar Road along with allied works in industrial premises and residential quarters of Balaghat Mine.(MOIL/MOIL LIMITED/CMC/24-)25/ET/30 14-06-2024 15-07-2024 15-07-2024 15-07-2024 04:00 PM Active View
62. Repairing of IR make Air compressor model R160IU-7.5 of Ukwa Mine.(AJGM/UK/MECH/2024-25/362) 13-06-2024 20-06-2024 20-06-2024 20-06-2024 04:30 PM Active View
63. Premonsoon Preparatory Works at Tirodi mine.(TRD/CIVIL/24-25/482 Date 9/06/2024) 13-06-2024 19-06-2024 19-06-2024 19-06-2024 04:00 PM Active View
64. Repairing of road from Agent bungalow to New Ventilation shaft at Balaghat Mine(CIVIL/BGT/LTE/24-25/336 Dt.09.06.2024) 13-06-2024 19-06-2024 19-06-2024 19-06-2024 04:30 PM Active View
65. Providing and laying concrete floor shed and drain in the area of winder house near vertical shaft at gumgaon Mine(MM/GUM/CIVIL/LT/24-25/ 711) 13-06-2024 27-06-2024 27-06-2024 27-06-2024 04:30 PM Active View
66. Repairing of road by spreading of filling material at approach road of West Ventilation Shaft at Ukwa Mine.(AGT/CIVIL/UK/LT/2024-25/370 Dt.12.06.2024) 12-06-2024 18-06-2024 18-06-2024 18-06-2024 04:30 PM Active View
67. Filling spreading at Ch- 12000 adit for Tugger Haulage chamber and supportat Ukwa Mine.(AGT/MINING/UK/LT/2024-25/371 DT.12.06.2024) 12-06-2024 18-06-2024 18-06-2024 18-06-2024 04:30 PM Active View
68. Repairing of Diesel Engine of LT Make Wheel Loader-9020 of Balaghat Mine.(AGT/BGT/MECH/MG/24-25/346) 11-06-2024 21-06-2024 21-06-2024 21-06-2024 04:30 PM Active View
69. Fabrication and Installation of New Moving Launder Chute for 14.5th L loading Station.(AGT/BGT/MECH/PS/24-25/351) 11-06-2024 28-06-2024 28-06-2024 28-06-2024 04:30 PM Active View
70. Hydraulic Pressing of Solid Tyres-10.00X20 -60nos. for LHD Machines of Balaghat Mine.(AGT/BGT/Solid-Tyre/24-25/345) 11-06-2024 28-06-2024 28-06-2024 28-06-2024 04:30 PM Active View
71. PURCHASE OF MS NUT AND BOLT OF SIZE 3/4X4 inch and 5/8X4 inch fOR BALAGHAT MINE.(PUR/BGT/MS Bolt/24-25/347) 11-06-2024 21-06-2024 21-06-2024 21-06-2024 04:00 PM Active View
72. PURCHASE OF 6 inch GI FLANGES FOR BALAGHAT MINE.(PUR/BGT/GI-Flanges/24-25/348) 11-06-2024 28-06-2024 28-06-2024 28-06-2024 04:30 PM Active View
73. Purchase of V Belts from Authorized dealer of Fenner/PIX/SKF Make for IMB Plant of Balaghat Mine.(PUR/MOIL/BGT/V-BELT/24-25/349) 11-06-2024 28-06-2024 28-06-2024 28-06-2024 04:30 PM Active View
74. PURCHASE OF GI Welded Wire Mesh Panel for Underground level of Balaghat Mine(PUR/BGT/Wire-Mesh/24-25/350) 11-06-2024 21-06-2024 21-06-2024 21-06-2024 04:30 PM Active View
75. Overhauling of 150 hp Pump(MECHKD2425561) 11-06-2024 01-07-2024 01-07-2024 01-07-2024 04:30 PM Active View
76. Repairing of Boom and Arm Assembly of Tata Hitachi Excavator No.02 of Balaghat Mine.(AGT/BGT/MECH/EXCV/24-25/343) 11-06-2024 21-06-2024 21-06-2024 21-06-2024 04:30 PM Active View
77. Modification of Main Conveyor Belt Gantry by replacing Head Pulley, Gear Box and Electric Motor of Production Shaft.(AGT/MECH/PS/24-25/344) 11-06-2024 28-06-2024 28-06-2024 28-06-2024 04:30 PM Active View
78. Providing and Installation of Digital Distance cum Speed Indicator in 50HP Haulage at Beldongri Mine(BEL/MECH/24-25/341) 10-06-2024 01-07-2024 01-07-2024 01-07-2024 04:30 PM Active View
79. HANDLING OF BIG CHUNKS AT MUNSAR MINE OCF(MUN/TENDER/24-25/355) 10-06-2024 17-06-2024 17-06-2024 17-06-2024 04:30 PM Active View
80. Hiring of Statutory Staff (Mine Foreman) for High Speed Shaft at Gumgaon Mine.(Gum/Min/2024-25/677, DT. 10.06.2024) 10-06-2024 17-06-2024 17-06-2024 17-06-2024 04:30 PM Active View
81. Providing and Installation of Computerized Automatic Speed Indicator Cum Recorder for 100 HP winder at cage winder of Beldongri Mine(PUR/MOIL/BL/WINDER/24-25/494) 07-06-2024 28-06-2024 28-06-2024 28-06-2024 04:30 PM Active View
82. Collection and disposal of Garbage and cleaning of drains ,sewer lines in camp colony at Balaghat Mine(HR/BGT/LTE/23-24/327 Dated 07.06.2024) 07-06-2024 14-06-2024 14-06-2024 14-06-2024 04:30 PM Active View
83. Outsourcing of LHD Machine Opertor at Balaghat Mine.(MINING/BGT/LTE/24-25/328 Dated 07.06.2024) 07-06-2024 14-06-2024 14-06-2024 14-06-2024 04:30 PM Active View
84. Cutting of open trench near Jamrapani nallah towards plantation area at Tirodi Mine.(TRD/CIVIL/24-25/390DATE 25/05/2024) 06-06-2024 11-06-2024 11-06-2024 11-06-2024 04:00 PM Active View
85. Supply of Chisel for Rock Breaker of TATA -ZX -220LC Excavator of Chikla Mine.(CH/MECH/24-25/10009861/GEN/332) 06-06-2024 12-06-2024 12-06-2024 12-06-2024 04:30 PM Active View
86. Procurement of Interface Modules and DI/DO Modules for Ukwa Mine(UK/ELECT/2024-25/320) 06-06-2024 13-06-2024 13-06-2024 13-06-2024 04:30 PM Active View
87. Purchase of Tooth Point and Adaptor for PC450 Hydraulic Excavator operating at Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2023-24/311) 05-06-2024 15-06-2024 15-06-2024 15-06-2024 04:30 PM Active View
88. Purchase of Carrier Roller Assy for FRD DCR 20 DRILLING MACHINE Operating at Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2024-25/312) 05-06-2024 15-06-2024 15-06-2024 15-06-2024 04:30 PM Active View
89. Hiring of 30hp tractor mounted diesel pump with tractor for 07no pit of Tirodi Mine(MOIL/MN01/TD/24-25/458 DT-04.06.2024) 05-06-2024 12-06-2024 12-06-2024 12-06-2024 03:30 PM Active View
90. Chemical Analysis by different methods at EMD Plant Laboratory Dongri Buzurg Mine(MOIL/DB/EMD/ADGM/TE/24-25/348) 05-06-2024 20-06-2024 20-06-2024 20-06-2024 04:30 PM Active View
91. Repair of kachcha road from weigh bridge to 05no pit at Sitapatore Mine(SP/CIVIL/24-25/226 DT-31.05.2024) 05-06-2024 11-06-2024 11-06-2024 11-06-2024 04:30 PM Active View
92. Providing and laying hume pipe across the road hear 6no pit at Sitapatore Mine(SP/CIVIL/24-25/222 DT-30.05.2024) 05-06-2024 11-06-2024 11-06-2024 11-06-2024 04:30 PM Active View
93. Repair of road from hirapur dump to 04no magazine dump at Tirodi Mine(TRD/CIVIL/24-25/389 DT-25.05.2024) 05-06-2024 11-06-2024 11-06-2024 11-06-2024 04:30 PM Active View
94. Purchase of Spares Lift nd Steering Cylinder for L and T Loader of Dongri Buzurg Mine.(PUR/AGTGRII//DB/2024-25/304) 04-06-2024 08-06-2024 08-06-2024 08-06-2024 04:30 PM Active View
95. Providing 15 mbps 1 is to 1 Internet Leased Line (ILL) at Beldongri Mine(ADGM/GroupIIISYSNW/2024-25/318) 04-06-2024 19-06-2024 19-06-2024 19-06-2024 04:00 PM Active View
96. Proposal for Hiring of 3 Nos winding Engine Driver for 622 HP winder of Ukwa Mine.(AJGM/UK/MECH/2024-25/303) 04-06-2024 11-06-2024 11-06-2024 11-06-2024 04:30 PM Active View
97. STATIONERY ITEM FOR CHIKLA MINE(CH/TE/PWE/24-25/258 DT.22.05.2024) 04-06-2024 15-06-2024 15-06-2024 15-06-2024 03:30 PM Active View
98. Purchase of Cummins QSK 19C engine filters for BEML 60T Dumpers of Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2024-25/305) 03-06-2024 21-06-2024 21-06-2024 21-06-2024 04:30 PM Active View
99. Purchase of Button Bit (of hammer) for Furukawa Rock Drill Machine, model DCR 20.(PUR/MOIL//2024-25/302) 03-06-2024 08-06-2024 08-06-2024 08-06-2024 04:30 PM Active View
100. Renewal of structure stability test of headgear structure of 1st vertical shaft at Munsar Mine(MM/MUN/MECH/24-25/520) 03-06-2024 10-06-2024 10-06-2024 10-06-2024 04:30 PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above

 Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.5.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2027) Year Tenders
View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.