निविदाएं संग्रह
| क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
|---|---|---|---|---|---|---|---|---|
| 1. | Construction of Retaining wall and approach road to Pit Office at Kandri Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/25) | 18-05-2024 | 21-06-2024 | 21-06-2024 | 21-06-2024 | 04:00 PM | Active | और देखें |
| 2. | Cleaing of strom drain water drains at surface and UG sumps and drains at diffrent levels for monsoon preparatory works at Kandri Mine(CIVIL/KD/T.E./24-25/25 Date 15.05.2024) | 17-05-2024 | 04-06-2024 | 04-06-2024 | 04-06-2024 | 04:30 PM | Active | और देखें |
| 3. | Repairs and renovation of existing sewage treatment plant at Kandri Mine(CIVIL/KD/T.E./24-25/27 Date 15.05.2024) | 17-05-2024 | 04-06-2024 | 04-06-2024 | 04-06-2024 | 04:30 PM | Active | और देखें |
| 4. | Repair of domestic pipe line and SWR pipeline at 36 A Type quarters at Tirodi Mine(TRD/CIVIL/24-25/169A DT-07/05/2024) | 17-05-2024 | 24-05-2024 | 24-05-2024 | 24-05-2024 | 04:30 PM | Active | और देखें |
| 5. | Extension of shed in oil room at workshop premises Tirodi Mine(TRD/CIVIL/23-24/168B DT- 07.05.2024) | 17-05-2024 | 24-05-2024 | 24-05-2024 | 24-05-2024 | 04:30 PM | Active | और देखें |
| 6. | Garbage disposal, drain cleaning, grass cutting and other sanitation work at Sitapatore Mine.(SP/PERS/24-25/184 DATED 14/05/2024) | 17-05-2024 | 22-05-2024 | 22-05-2024 | 22-05-2024 | 04:00 PM | Active | और देखें |
| 7. | Cleaning of storm water Drain at Gumgaon Mine(MM/GUM/CIVIL/LT/24-25/419 DT 15.05.2024023) | 17-05-2024 | 25-05-2024 | 25-05-2024 | 25-05-2024 | 04:30 PM | Active | और देखें |
| 8. | Purchase of Jaw Plates for Primary Jaw Cruher-1050X150mm of Pilot Plant of Balaghat Mine.(PUR/MOIL/BGT/IMB/24-25/210) | 16-05-2024 | 30-05-2024 | 30-05-2024 | 30-05-2024 | 04:30 PM | Active | और देखें |
| 9. | PROCUREMENT OF CARRYING AND RETURN ROLLERS FOR CONVEYOR BELTS OF PRODUCTION SHAFT OF BALAGHAT MINE.(PUR/BGT/PS/ROLLER/24-25/211) | 16-05-2024 | 30-05-2024 | 30-05-2024 | 30-05-2024 | 04:30 PM | Active | और देखें |
| 10. | Overhauling of Mahindra Make Engine ACE Backhoe wheel loader of Ukwa Mine.(AJGM/UK/MECH/2024-25/199) | 16-05-2024 | 23-05-2024 | 23-05-2024 | 23-05-2024 | 04:30 PM | Active | और देखें |
| 11. | INSTALLATION AND COMMISSIONING OF 11KV VCB PANEL, 1600KVA TRANSFORMER, LT PANEL WITH LAYING OF CABLE(BGT/TE/ELECT/AJGM/24-25/201) | 16-05-2024 | 28-05-2024 | 28-05-2024 | 28-05-2024 | 03:30 PM | Active | और देखें |
| 12. | Obtaining Capacity Expansion EC from existing 1500 TPA to 2000 TPA at EMD Plant, Dongri Buzurg mine of MOIL Limited.(TE/EMD/EC/24-25/110 date 14/05/2024) | 15-05-2024 | 28-05-2024 | 28-05-2024 | 28-05-2024 | 03:30 PM | Active | और देखें |
| 13. | DRILLING OF MUCK GENERATION HOLE FOR PRODUCTION IN 2ND LEVEL AT MUNSAR MINE.(MUN/TENDER/24-25/342) | 15-05-2024 | 22-05-2024 | 22-05-2024 | 22-05-2024 | 04:30 PM | Active | और देखें |
| 14. | Stripping of ore body loading of blasted muck and pushing of loaded tubs up to haulage Road and supporting of the stripping Area(MUN/TENDER/24-25/339) | 15-05-2024 | 22-05-2024 | 22-05-2024 | 22-05-2024 | 04:30 PM | Active | और देखें |
| 15. | PURCHASE OF MULTIFUNCTION METER -10 NOS. AND 8 CHANNEL ANNUNCIATOR -8NOS. OF 11KV HT VCB PANEL(BGT/TE/ELECT/AJGM/24-25/191) | 14-05-2024 | 27-05-2024 | 27-05-2024 | 27-05-2024 | 03:30 PM | Active | और देखें |
| 16. | Purchase of spares for TATA make Tippers of Dongri Buzurg Mine.(PUR/MOIL//DB/2024-25/161) | 13-05-2024 | 29-05-2024 | 29-05-2024 | 29-05-2024 | 04:30 PM | Active | और देखें |
| 17. | PROVIDING SUPPLYING AND LAYING OFC CABLE FOR BIOMETRIC MACHINE FROM MINE OFFICE TO 7 NO PIT OFFICE TIRODI MINE(TRD/ELECT/2024-25/244) | 10-05-2024 | 18-05-2024 | 18-05-2024 | 18-05-2024 | 03:30 PM | Active | और देखें |
| 18. | Transportation of Bottom Ash from Super Thermal Power Station, NTPC Mauda to Sand Stowing Plant of Gumgaon Mine.(Agent/Gum/Min/24-25/199, date 10.05.2024) | 10-05-2024 | 18-05-2024 | 18-05-2024 | 18-05-2024 | 04:30 PM | Active | और देखें |
| 19. | REPAIR AND REWINDING OF 80V, 10HP AND 6HP DC SERIES MOTOR OF BALAGHAT MINE(BGT/TE/ELECT/AJGM/24-25/182) | 10-05-2024 | 24-05-2024 | 24-05-2024 | 24-05-2024 | 03:30 PM | Active | और देखें |
| 20. | PURCHASE OF DIFFERENT SIZE OF CARBON BRUSH AND CARBON BRUSH HOLDER DC SERIES MOTOR OF LOCOMOTIVE FOR BALAGHAT MINE(BGT/TE/ELECT/AJGM/24-25/183) | 10-05-2024 | 23-05-2024 | 23-05-2024 | 23-05-2024 | 03:30 PM | Active | और देखें |
| 21. | Supply of 1050 Meter HDPE Pipe, 63.5 mm for Water supply from GSR at 48-52 colony to 1st Vertical S.(CH/MECH/24-25/10009860/160) | 09-05-2024 | 15-05-2024 | 15-05-2024 | 15-05-2024 | 04:30 PM | Active | और देखें |
| 22. | Supply of Chisel Tool TE3630 for Rock Breaker of TATA ZX 220LC Excavator of Chikla Mine.(CH/MECH/24-25/1-9861/159) | 09-05-2024 | 18-05-2024 | 18-05-2024 | 18-05-2024 | 04:30 PM | Active | और देखें |
| 23. | Construction of Anganwadi Building at Ukwa under Corporate Environment Responsibility (CER).(MOIL/MOIL LIMITED/CMC/24-25/ET/14) | 09-05-2024 | 18-06-2024 | 18-06-2024 | 18-06-2024 | 04:00 PM | Active | और देखें |
| 24. | Providing and fixing Outdoor Green Gym Equipment at Mines of MOIl Limited.(MOIL/MOIL LIMITED/CMC/24-25/ET/19) | 09-05-2024 | 18-06-2024 | 18-06-2024 | 18-06-2024 | 04:00 PM | Active | और देखें |
| 25. | Annual Miscellaneous works and minor civil repairs works for Industrial Buildings at Chikla Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/18) | 09-05-2024 | 18-06-2024 | 18-06-2024 | 18-06-2024 | 04:00 PM | Active | और देखें |
| 26. | Providing and fixing barbed wire fencing to protect thr sapling of plant planted to develop the 7.50 meter wide green belt at Parsoda Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/20) | 09-05-2024 | 18-06-2024 | 18-06-2024 | 18-06-2024 | 04:00 PM | Active | और देखें |
| 27. | SUPPLY OF DRINKING WATER THROUGH WATER TANKERS TO CAMP AND COLONY AT CHIKLA MINE.(Civil/CH/NIT/24-25/163 DT.07.05.2024) | 08-05-2024 | 18-05-2024 | 18-05-2024 | 18-05-2024 | 04:30 PM | Active | और देखें |
| 28. | Surplus Underground ROM Cleaning at Munsar Mine.(MUN/TENDER/24-25/183) | 08-05-2024 | 15-05-2024 | 15-05-2024 | 15-05-2024 | 04:30 PM | Active | और देखें |
| 29. | Hiring of Statutory Staff (Mine Foremen) for Munsar Mine.(MUN/TENDER/24-25/171) | 07-05-2024 | 13-05-2024 | 13-05-2024 | 13-05-2024 | 04:30 PM | Active | और देखें |
| 30. | Hiring of Statutory Staff (Mine Mate) for Munsar Mine.(MUN/TENDER/24-25/174) | 07-05-2024 | 13-05-2024 | 13-05-2024 | 13-05-2024 | 04:30 PM | Active | और देखें |
| 31. | Removal of pebbles generated during sand stowing at Balaghat Mine(MINING/BGT/LTE/24-25/442 Dt. 03.05.2024) | 06-05-2024 | 10-05-2024 | 10-05-2024 | 10-05-2024 | 04:30 PM | Active | और देखें |
| 32. | Outsourcing the work of making, collecting canteen items serving it in UG, BDC, Workshop, Administrative building of Kandri Mine(KD/PER/NIT/2024-25/223) | 06-05-2024 | 27-05-2024 | 27-05-2024 | 27-05-2024 | 04:30 PM | Active | और देखें |
| 33. | Material required turbocharger assembly for TATA450 Hyd Excavator at Tirodi Mine(MOIL/TD01/MECH/2024/192 DT 04.05.2024) | 06-05-2024 | 15-05-2024 | 15-05-2024 | 15-05-2024 | 03:30 PM | Active | और देखें |
| 34. | Concreting 13.5th Level (South) at Balaghat Mine(MINING/BGT/LTE/24-25/163 Dt 06.05.2024) | 06-05-2024 | 14-05-2024 | 14-05-2024 | 14-05-2024 | 04:30 PM | Active | और देखें |
| 35. | Operation of Vibratory Screen Installed at Surface in Gumgaon Mine.(Agent/Gum/Min/24-25/169, Dt 06.05.2024) | 06-05-2024 | 16-05-2024 | 16-05-2024 | 16-05-2024 | 04:30 PM | Active | और देखें |
| 36. | The transportation of sand from Kanhan River to the area near Rest House.(Agent/Gum/Min/23-24/346, date 06.05.2024) | 06-05-2024 | 17-05-2024 | 17-05-2024 | 17-05-2024 | 04:30 PM | Active | और देखें |
| 37. | Loading and unloading of steel items, cement, timbers and other store items in the mine store.(CH/MECH/24-25/76-30630/109) | 02-05-2024 | 09-05-2024 | 09-05-2024 | 09-05-2024 | 04:30 PM | Active | और देखें |
| 38. | Procurement of 33KV Oil Immersed 40/5A CTPT Metering Unit for Ukwa Mine(Procurement of 33KV Oil Immersed 40/5A CTPT Metete) | 02-05-2024 | 09-05-2024 | 09-05-2024 | 09-05-2024 | 04:30 PM | Active | और देखें |
| 39. | Empanelment of LOCAL CHEMIST/MEDICAL SHOPS.(MOIL/MS/24-25/EC/01) | 02-05-2024 | 03-06-2024 | 03-06-2024 | 03-06-2024 | 03:30 PM | Active | और देखें |
| 40. | Maintenance and Repairing work of Vertical shaft at Chikla Mine.(CH/MECH/24-25/76-30353/110) | 02-05-2024 | 09-05-2024 | 09-05-2024 | 09-05-2024 | 04:30 PM | Active | और देखें |
| 41. | Fabrication of Turn Table Suitable for 24CFT Tilting Tubs of 13.5th level of Balaghat Mine.(AGT/BGT/MECH/TT/24-25/120) | 30-04-2024 | 21-05-2024 | 21-05-2024 | 21-05-2024 | 04:30 PM | Active | और देखें |
| 42. | Fabrication of STEEL MANWAYS-1.5X0.84M For Ukwa Mine(AJGM/UK/MECH/2024-25/122) | 30-04-2024 | 08-05-2024 | 08-05-2024 | 08-05-2024 | 04:30 PM | Active | और देखें |
| 43. | Installation of Ventilation fan at 2nd vertical and 5000CH Section and allied work for Ventilation in Underground of Ukwa Mine(AJGM/UK/MECH/2024-25/123) | 30-04-2024 | 09-05-2024 | 09-05-2024 | 09-05-2024 | 04:30 PM | Active | और देखें |
| 44. | Restoration of Pipeline network of 9500CH Underground section at Ukwa Mine.(AJGM/UK/MECH/2024-25/124) | 30-04-2024 | 11-05-2024 | 11-05-2024 | 11-05-2024 | 04:30 PM | Active | और देखें |
| 45. | Outsourcing of Operation and general maintenance of Side discharge loader at night shift of 1st vertical at Ukwa Mine.(AJGM/UK/MECH/2024-25/125) | 30-04-2024 | 13-05-2024 | 13-05-2024 | 13-05-2024 | 04:30 PM | Active | और देखें |
| 46. | Schedule Maintenance and General Inspection of Rigid Guides Rails of 1st vertical shaft and 2nd vertical shaft Winder of Ukwa Mine(AJGM/UK/MECH/2024-25/126) | 30-04-2024 | 13-05-2024 | 13-05-2024 | 13-05-2024 | 04:30 PM | Active | और देखें |
| 47. | Retrofitting Works towards strenghening of foundation of new Cell bay Building (01-09 No. Cell) and Interior Renovation Works for EMD Plant, Dongri Buzurg Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/16) | 30-04-2024 | 16-06-2024 | 16-06-2024 | 16-06-2024 | 04:00 PM | Active | और देखें |
| 48. | Construction of Drain Network at Ukwa Village under Corporate Environment Responsibility (CER).(MOIL/MOIL LIMITED/CMC/24-25/ET/15) | 30-04-2024 | 06-06-2024 | 06-06-2024 | 06-06-2024 | 04:00 PM | Active | और देखें |
| 49. | Renovation of Mine Canteen Building at Chikla Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/17) | 30-04-2024 | 06-06-2024 | 06-06-2024 | 06-06-2024 | 04:00 PM | Active | और देखें |
| 50. | Drilling of Production holes at 8L North ,9 L North Balaghat Mine(MINING/BGT/LTE/24-25/130 Dt 30.04.2024) | 30-04-2024 | 08-05-2024 | 08-05-2024 | 08-05-2024 | 04:30 PM | Active | और देखें |
| 51. | Drilling of Production holes at 13 L North at Balaghat Mine(MINING/BGT/LTE/24-25/392 Dt 30.04.2024) | 30-04-2024 | 09-05-2024 | 09-05-2024 | 09-05-2024 | 04:30 PM | Active | और देखें |
| 52. | For Extra excavation of haulage road of 13.5 L North section at Balaghat Mine(MINING/BGT/LTE/24-25/394 Dt 30.04.2024) | 30-04-2024 | 09-05-2024 | 09-05-2024 | 09-05-2024 | 04:30 PM | Active | और देखें |
| 53. | Making of Artificial pillar of RCC at 12th level north section Balaghat Mine(MINING/BGT/LTE/24-25/396 Dt 30.04.2024) | 30-04-2024 | 08-05-2024 | 08-05-2024 | 08-05-2024 | 04:30 PM | Active | और देखें |
| 54. | Repairing of RH Travelling device of Hydraulic Excavator Tata Hitachi-220 deployed at Balaghat Mine.(AGT/BGT/MECH/EXC/24-25/116) | 29-04-2024 | 07-05-2024 | 07-05-2024 | 07-05-0024 | 04:30 PM | Active | और देखें |
| 55. | Repairing of Bhatera pipe line between Boda and Tawejhari village beside Railway track at Balaghat Mine(CIVIL/BGT/LTE/24-25/114 Dt 29.04.2024) | 29-04-2024 | 07-05-2024 | 07-05-2024 | 07-05-2024 | 04:30 PM | Active | और देखें |
| 56. | Major Renovation to Mine Manager Bunglow and under ground managers Bunglow at Balaghat Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/11) | 27-04-2024 | 28-05-2024 | 28-05-2024 | 28-05-2024 | 04:00 PM | Active | और देखें |
| 57. | Construction of Community hall at Sitasaongi Village under CER.(MOIL/MOIL LIMITED/CMC/24-25/ET/12) | 27-04-2024 | 04-06-2024 | 04-06-2024 | 04-06-2024 | 04:00 PM | Active | और देखें |
| 58. | Construcion of community hall at Chikla village under CER.(MOIL/MOIL LIMITED/CMC/24-25/ET/13) | 27-04-2024 | 04-06-2024 | 04-06-2024 | 04-06-2024 | 04:00 PM | Active | और देखें |
| 59. | Fabrication of steel hopper and mixing chamber for new sand stowing plant at Chikla-B for Chikla.(CH/Mech/24-25/76-30535/231/84) | 26-04-2024 | 02-05-2024 | 02-05-2024 | 02-05-2024 | 04:30 PM | Active | और देखें |
| 60. | OUTSOURCING OF SKILLED MANPOWER ELECTRICIAN FOR MAINTENANCE OF ELECTRICAL INSTALLAION IN UDERGROUND AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/24-25/99) | 26-04-2024 | 07-05-2024 | 07-05-2024 | 07-05-2024 | 03:30 PM | Active | और देखें |
| 61. | Annual Repair to Camp and Residential Quarters at Chikla Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/8) | 26-04-2024 | 03-06-2024 | 03-06-2024 | 03-06-2024 | 04:00 PM | Active | और देखें |
| 62. | Construction of Cement Concrete Road at Chakhdehi Village, District Mandala (M.P) under CSR.(MOIL/MOIL LIMITED/CMC/24-25/ET/9) | 26-04-2024 | 03-06-2024 | 03-06-2024 | 03-06-2024 | 04:00 PM | Active | और देखें |
| 63. | Annual Repair to Camp quarters at Balaghat Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/10) | 26-04-2024 | 27-05-2024 | 27-05-2024 | 27-05-2024 | 04:00 PM | Active | और देखें |
| 64. | Dismantling of major Components, Shifting and Lowering to 7th and 2nd Level Underground assembling and Commissioning of 1 nos. new Load Haul Dump(LHD) Loader each at both Levels of Ukwa Mine(AJGM/UK/MECH/2024-25/102) | 25-04-2024 | 02-05-2024 | 02-05-2024 | 02-05-2024 | 04:30 PM | Active | और देखें |
| 65. | Garbage disposal, drain cleaning,grass cutting and other sanitation work at Tirodi Mine.(MOIL/TRD/pers/24-25/128 DATED 24/04/2024) | 24-04-2024 | 29-04-2024 | 29-04-2024 | 29-04-2024 | 04:00 PM | Active | और देखें |
| 66. | cleaning underground sump drain at munsar mine(MUN/TENDER/24-25/96) | 22-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:30 PM | Active | और देखें |
| 67. | Providing and Applying weather shield paint, Interior emulsion and oil paint to MOIL VT Center building at Munsar Mine(AGT/GUM/CIVIL/LT/24-25/102) | 22-04-2024 | 29-04-2024 | 29-04-2024 | 29-04-2024 | 04:30 PM | Active | और देखें |
| 68. | Drilling of Muck generation hole for production at -30 Level at Munsar Mine.(AGT/MUN/MIN/LT/24-25/103) | 22-04-2024 | 29-04-2024 | 29-04-2024 | 29-04-2024 | 04:30 PM | Active | और देखें |
| 69. | Recover SM grade Ore Underground sub grade mineral rejects Mn rock at Munsar Mine(AGT/MUN/MIN/NIT/24-25/121) | 22-04-2024 | 29-04-2024 | 29-04-2024 | 29-04-2024 | 04:30 PM | Active | और देखें |
| 70. | Drilling of Bore Hole 110mm(Diameter)5nos (30 Meters each)150RMT at 2nd level(MUN/TENDER/24-25/98) | 22-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:30 PM | Active | और देखें |
| 71. | Ancillary Works for Crusher Unit installed at BDC Section, Dongribuzurg Mine(DB/CIVIL/NIT/TE/2024-25/47 Date 16.04.24) | 18-04-2024 | 23-04-2024 | 23-04-2024 | 23-04-2024 | 04:30 PM | Active | और देखें |
| 72. | Development Works towards making of approach ramps, drains around Slime Pond near Integrated Manganese Beneficiation Plant, Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2024-25/ Date 16.04.2024) | 18-04-2024 | 26-04-2024 | 26-04-2024 | 26-04-2024 | 04:30 PM | Active | और देखें |
| 73. | Providing and laying 1 GI pipeline for drinking water with accessories as per inset level of 2nd Vertical shaft of Ukwa Mine(AJGM/UK/MECH/2024-25/86) | 18-04-2024 | 25-04-2024 | 25-04-2024 | 25-04-2024 | 04:30 PM | Active | और देखें |
| 74. | Repairing of lubi make 40HP and 15HPN Submersible Pump of Ukwa Mine.(AJGM/UK/MECH/2024-25/85) | 18-04-2024 | 25-04-2024 | 25-04-2024 | 25-04-2024 | 04:30 PM | Active | और देखें |
| 75. | The transportation of sand from Kanhan River to the area near Rest House.(Agent/Gum/Min/24-25/90, date 17.04.2024) | 17-04-2024 | 29-04-2024 | 29-04-2024 | 29-04-2024 | 04:30 PM | Active | और देखें |
| 76. | Formation of base foundation for installation of Chock in underground faces.(Gum/Min/24-25/191, date 17.04.2024) | 17-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:30 PM | Active | और देखें |
| 77. | Making of garland drain along various waste dumps at Tirodi Mine.(TRD/CIVIL/2023-24/2049 DATED 21/01/2024) | 17-04-2024 | 23-04-2024 | 23-04-2024 | 23-04-2024 | 04:00 PM | Active | और देखें |
| 78. | Construction of stone masonry wall along South and North waste dump at Tirodi Mine.(TRD/CIVIL/2023-24/2048 DATED 21/03/2024) | 17-04-2024 | 23-04-2024 | 23-04-2024 | 23-04-2024 | 04:00 PM | Active | और देखें |
| 79. | Making of garland drain along various waste dumps at Sitapatore Mine.(MOIL/SP/Civil/2023-24/2050 Dated 21/03/2024) | 17-04-2024 | 23-04-2024 | 23-04-2024 | 23-04-2024 | 04:00 PM | Active | और देखें |
| 80. | EXTRA EXCAVATION IN 2ND LEVEL AT MUNSAR MINE(MUN /TENDER/24-25/100) | 17-04-2024 | 24-04-2024 | 24-04-2024 | 24-04-2024 | 04:30 PM | Active | और देखें |
| 81. | PRINTING OF VARIOUS FORMS, FORMATS AND REGISTER FOR CHIKLA MINE.(CH/TE/PERS/24-25/30 DATE-08.04.2024) | 16-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 03:30 PM | Active | और देखें |
| 82. | Construction of Boundary wall around government Primary and secondary School at ukwa under CER.(MOIL/MOIL LIMITED/CMC/24-25/ET/5) | 16-04-2024 | 16-05-2024 | 16-05-2024 | 16-05-2024 | 04:00 PM | Active | और देखें |
| 83. | Laying of water Distribution Line to Chikla Village under CER.(MOIL/MOIL LIMITED/CMC/24-25/ET/6) | 16-04-2024 | 24-05-2024 | 24-05-2024 | 24-05-2024 | 04:00 PM | Active | और देखें |
| 84. | Construction of Toilet Block in Government Girls School in Ukwa Village under Corporate Environment Responsibility (CER).(MOIL/MOIL LIMITED/CMC/24-25/ET/7) | 16-04-2024 | 16-05-2024 | 16-05-2024 | 16-05-2024 | 04:00 PM | Active | और देखें |
| 85. | DEVELOPMENT OF GARDEN IN FRONT OF ADMINISTRATIVE BUILDING AT CHIKLA MINE.(CH/CIVIL/NIT/24-25/57 DATE-15.04.2024) | 16-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:30 PM | Active | और देखें |
| 86. | Cleaning of accumulated sand from -50L at Kandri Mine(KD/MINES/NIT/2024-25/112) | 13-04-2024 | 04-05-2024 | 04-05-2024 | 04-05-2024 | 04:30 PM | Active | और देखें |
| 87. | Cleaning of accumulated sand incline to from -150L at Kandri Mine(KD/MINES/NIT/2024-25/115) | 13-04-2024 | 06-05-2024 | 06-05-2024 | 06-05-2024 | 04:30 PM | Active | और देखें |
| 88. | Supply, Installation, Commissioning of Wired Networking Equipment with necessary accessories/equipment for Re-setup of LAN of Admin Building at Ukwa Mine(AGT/UK/SYS/NETWORK/2024-25/65) | 12-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:00 PM | Active | और देखें |
| 89. | REPAIR AND REWINDING OF 80V, 7.5KW, 10HP DC SERIES MOTOR OF BALAGHAT MINE 2 NOS.(BGT/TE/ELECT/AJGM/24-25/62) | 12-04-2024 | 02-05-2024 | 02-05-2024 | 02-05-2024 | 03:30 PM | Active | और देखें |
| 90. | Annual repair work of School Bus MH40N3405 of kandri Mine(Mech/KD/24-25/107) | 11-04-2024 | 04-05-2024 | 04-05-2024 | 04-05-2024 | 04:30 PM | Active | और देखें |
| 91. | Dismantling of existing 30lb Tram line of pit top and laying of 60lb Tram line and Fabrication of 60lb rail LH and diamond crossing(Mech/KD/24-25/94) | 11-04-2024 | 30-04-2024 | 30-04-2024 | 30-04-2024 | 04:30 PM | Active | और देखें |
| 92. | Construction of RCC retaining wall for new Crushing and screening Plant at Sitapatore Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/4) | 10-04-2024 | 10-05-2024 | 10-05-2024 | 10-05-2024 | 04:00 PM | Active | और देखें |
| 93. | Overhauling Centrifugal Pump Kirloskar 150HP second level(Mech/KD/24-25/105) | 10-04-2024 | 01-05-2024 | 01-05-2024 | 01-05-2024 | 04:30 PM | Active | और देखें |
| 94. | Miscellaneous civil works for Slime pond at Nagra plant of Ukwa Mine.(AGT/CIVIL/UK/LT/2024-25/15 DT. 09/04/2024) | 09-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | और देखें |
| 95. | providing, supplying and installing fire fighting system FMP, balaghat mine(TE/MOIL/AGT/FMP/ELECT/24-25/08) | 08-04-2024 | 25-04-2024 | 25-04-2024 | 25-04-2024 | 04:25 PM | Active | और देखें |
| 96. | Purchase of spring Steel Mesh Wire Panel for 6mm and 25mm Vibrating Screen of IMB plant of Balaghat Mine.(PUR/MOIL/BGT/IMB/24-25/16) | 08-04-2024 | 22-04-2024 | 22-04-2024 | 22-04-2024 | 04:30 PM | Active | और देखें |
| 97. | PURCHASE OF SPARES FOR AIR AND WATER COOLED COMPRESSORS FOR KANDRI MINE(PUR/MOIL/KD/MECH/01) | 08-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:30 PM | Active | और देखें |
| 98. | Hiring of JCB Machine with Tolley Breaker at Tirodi Mine.(MOIL/TRD/MINE/2024/257 dated - 23/03/2024) | 08-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:00 PM | Active | और देखें |
| 99. | Stripping of ore body, loading of blasted muck and pushing of loaded tubs upto haulage Road and supporting of the stripping Area.(MUN/TENDER/24-25/43) | 08-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | और देखें |
| 100. | Construction of boundary wall for Existing school building at Ukwa Mine.(AGT/CIVIL/UK/LT/2024-25/13 DT. 08/04/2024) | 08-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | और देखें |
| निविदाएं अधिक जानकारी |
|---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.5.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
| (2027) वर्ष के निविदाएं देखें |
| (2025) वर्ष के निविदाएं देखें |
| (2024) वर्ष के निविदाएं देखें |
| (2023) वर्ष के निविदाएं देखें |
| (2022) वर्ष के निविदाएं देखें |
| (2021) वर्ष के निविदाएं देखें |
| (2020) वर्ष के निविदाएं देखें |
| (2019) वर्ष के निविदाएं देखें |
| (2018) वर्ष के निविदाएं देखें |
| (2017) वर्ष के निविदाएं देखें |
| (2016) वर्ष के निविदाएं देखें |
| (2015) वर्ष के निविदाएं देखें |
| (2014) वर्ष के निविदाएं देखें |
| (2013) वर्ष के निविदाएं देखें |
| (2012) वर्ष के निविदाएं देखें |
| (24) वर्ष के निविदाएं देखें |
| पूर्ण निविदा पुरालेख देखें |
| सभी मॉयल निविदाएं देखें |