निविदा संग्रह

निविदाएं संग्रह

खोज के लिए शीर्षक निविदा जारी करने की तिथि निविदा जारी करने की अंतिम तिथि
क्रमांक शीर्षक अंक प्रारंभ दिनांक अंक अंतिम तिथी प्रस्तुत करने की अंतिम तिथि खुलने की तिथि खुलने का समय स्थिति और देखें
1. Providing and fixing profile sheet on roof of Boiler House at EMD plant at Dongri Buzurg Mine(MOIL/21-22/ET/31) 24-05-2021 23-06-2021 23-06-2021 23-06-2021 03:30 PM Active और देखें
2. Manpower to assistance pumping operation in CH95 at Ukwa Mine(UK/TE/MECH/21-22/17270/309) 24-05-2021 08-06-2021 08-06-2021 08-06-2021 04:30 PM Active और देखें
3. providing 6 mbps 1 is to 1 Internet Leased Line (ILL) at Beldongri Mine(ADGM/Group-III/SYS/NW /2021-22/252) 24-05-2021 01-06-2021 01-06-2021 01-06-2021 04:00 PM Active और देखें
4. Construction of cremation shed at village Gurha Beldaran, Tahsil Hiranagar, Dist Kathua, UT of Jammu and Kashmir, under CSR(MOIL/21-22/ET/26) 24-05-2021 23-06-2021 23-06-2021 23-06-2021 03:30 PM Active और देखें
5. Slab Water Proofing Works for New Medical Administrative Building of Kandri Mine.(KAN/CIVIL/NIT/21-22/533 DT 21.05.2021) 22-05-2021 04-06-2021 04-06-2021 04-06-2021 04:30 PM Active और देखें
6. Handling and Despatch of ore for Tirodi Mine(MOIL/21-22/ET/33) 22-05-2021 21-06-2021 21-06-2021 21-06-2021 03:30 PM Active और देखें
7. Handling and Despatch of ore for Balaghat Mine(MOIL/21-22/ET/32) 22-05-2021 21-06-2021 21-06-2021 21-06-2021 03:30 PM Active और देखें
8. Handling and Despatch of ore for Sitapatore Mine(MOIL/21-22/ET/34) 22-05-2021 21-06-2021 21-06-2021 21-06-2021 03:30 PM Active और देखें
9. Cleaning of Storm water drain in surface and underground sump under monsoon preparatory work at Kandri Mine(KAN/CIVIL/NIT/21-22/521 DT 19.05.2021) 21-05-2021 28-05-2021 28-05-2021 28-05-2021 04:30 PM Active और देखें
10. False ceiling work of Transformer, Electric panel and Electrical store rooms of IMB Plant, Moil Ltd BGT mine(AGT/BGT/IMB PLANT/21-22/233) 21-05-2021 31-05-2021 31-05-2021 31-05-2021 04:30 PM Active और देखें
11. Removal of Spillage from the bottom of Conveyor belt structure and Bottom of the shaft at 15.5th Level Loading station Holmes Shaft.(AGT/BGT/MECH/WINDER/21-22/248) 21-05-2021 07-06-2021 07-06-2021 07-06-2021 04:30 PM Active और देखें
12. Cleaning of Surface Drains as monsoon preparatory work at Chikla Mine(CIVIL/CH/T.E./21-22/638) 20-05-2021 31-05-2021 31-05-2021 31-05-2021 04:30 PM Active और देखें
13. REAIRING OF TRACK COMPONENTS OF SIDE DUMP LOADERS MACHINE AT MUNSAR MINE.(Agent and DGM (Mines)/GrpIII/2021-22/214) 19-05-2021 07-06-2021 07-06-2021 07-06-2021 04:30 PM Active और देखें
14. Loading of Slag at Ferro Manganese Plant, Balaghat Mine(MOIL/21-22/ET/19) 19-05-2021 18-06-2021 18-06-2021 18-06-2021 03:30 PM Active और देखें
15. Breaking of Slag and Other Associated Works at Ferro Manganese Plant, Balaghat Mine(MOIL/21-22/ET/18) 19-05-2021 18-06-2021 18-06-2021 18-06-2021 03:30 PM Active और देखें
16. OUTSOURCING METER READING, PREPARATION OF ELECTRICITY RECOVERY LIST AND PROCESSING OF LOCAL DOCUMENMTATION OF ELECTRICAL DEPARTMENT FOR THE PERIOD 6 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/223) 18-05-2021 25-05-2021 25-05-2021 25-05-2021 03:30 PM Active और देखें
17. WEB SITE TENDER ENQUIRY FOR PIPELINE FITTING OF 200 MM, WITH CLAMPS BY LOWERING AND COMPLETE INSTALLED WITH FLANGES WELDING AND COMPLETE PAINTING OF PIPELINE AT MUNSAR MINE.(MUN/ENGG/TENDER/20-21/213) 17-05-2021 07-06-2021 07-06-2021 07-06-2021 04:30 PM Active और देखें
18. SELECTION OF ANNUAL REPORT CONSULTING SERVICE PROVIDER FOR MOIL LIMITED FOR THE FINANCIAL YEAR 2020-21(MOIL/21-22/ET/41) 17-05-2021 31-05-2021 31-05-2021 31-05-2021 03:30 PM Active और देखें
19. Repair and construction of front Compound Wall of Mine Managers Bungalow at Gumgaon Mine.(Agent/GUM/Civil/NIT/21-22/228 14/05/2021) 15-05-2021 22-05-2021 22-05-2021 22-05-2021 04:30 PM Active और देखें
20. Hiring of Machinery for loading unloading transportation of waste from Chitawer section to Nagara Plant at Section Ukwa Mine(AGT/Min/UK/LT/21-22/192) 15-05-2021 21-05-2021 21-05-2021 21-05-2021 04:30 PM Active और देखें
21. Supplying and Installation of Portable Toilet for deployed ladies workers in BDC/OCF Section at Gumgaon Mine.(GUM/Civil/NIT/21-22/217 13.05.2021) 14-05-2021 31-05-2021 31-05-2021 31-05-2021 04:30 PM Active और देखें
22. CAPLAMP MAINTENANCE, DISTRIBUTION AND COLLECTION FROM 18MAY 2021ONWARDS FOR 118 DAYS AT MANSAR MINE(ELECT/MUN/ADGM/21-22/157, Dated 03.05.2021) 12-05-2021 15-05-2021 15-05-2021 15-05-2021 05:00 PM Active और देखें
23. Purchase of High Speed Diesel (HSD)(PUR/MOIL/C-2/163/E-50/17-M DT.10/05/2021) 11-05-2021 24-05-2021 24-05-2021 24-05-2021 03:30 PM Active और देखें
24. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MATHER AND PLATT MAKE PUMP MODEL PUMP 10/12BLF, 132 KW.(PUR/MOIL/C-5/28/E- 48/ 14 -M Dt. 11/05/2021) 11-05-2021 02-06-2021 02-06-2021 02-06-2021 03:30 PM Active और देखें
25. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR DRY DENSITY SEPARATION PLANT(PUR/MOIL/C-5/23/E- 46/ 12 -M Dt. 07/05/2021) 07-05-2021 31-05-2021 31-05-2021 31-05-2021 03:30 PM Active और देखें
26. Structural Design consultancy for construction of screening plant for Pebble handling at Sand stowing Plant(Jt.GM/CH/MECH/TE/2021-22/192) 06-05-2021 12-05-2021 12-05-2021 12-05-2021 03:30 PM Active और देखें
27. Purchase and Installation of Digital Water Flow Meters with telemetry system for Munsar Mine(MS/GEO/NIT/2021-22/141 Date 02.05.2021) 03-05-2021 17-05-2021 17-05-2021 17-05-2021 04:30 PM Active और देखें
28. Purchase and Installation of Digital Water Flow Meters with telemetry system for Parsoda Mine(PS/GEO/NIT/2021-22/142 Date 02.05.2021) 03-05-2021 17-05-2021 17-05-2021 17-05-2021 04:30 PM Active और देखें
29. Procurement of Hydraulic Power Pack and Hydraulic Cylinders for Pit Bottom Buffer of production shaft at Balaghat Mine.(PUR/MOIL/BGT/WINDER/21-22/141) 03-05-2021 18-05-2021 18-05-2021 18-05-2021 04:30 PM Active और देखें
30. Dismantling, shifting and reassembling of 20Nos. of Joplin jig assembly from old site to New OCF Shed constructed along the Ferro Plant of Balaghat Mine.(AGT/BGT/MECH/OCF/21-22/139) 01-05-2021 17-05-2021 17-05-2021 17-05-2021 04:30 PM Active और देखें
31. Regular cleaning/ unblocking of main bunker ore flow in IMB Plant at Dongri Buzurg Mine.(DB/MECH/21-22/JGM(MECH)/164) 01-05-2021 04-05-2021 04-05-2021 04-05-2021 04:30 PM Active और देखें
32. OUTSOURCING FOR MONITORING AND OPERATION OF 33KV SUBSTATION FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/124) 28-04-2021 01-05-2021 01-05-2021 01-05-2021 03:30 PM Active और देखें
33. Erection of 11KV Overhead Line from Mine Pit Substation to Aggregate Crusher Plant.(DB/ELECT/21-22/163) 28-04-2021 06-05-2021 06-05-2021 06-05-2021 04:30 PM Active और देखें
34. Replacement of IBR Riser Tubes of FBC Boiler at EMD Plant, Dongri Buzurg Mine(MOIL/EMD/DB/AJGM/2021-22/159) 27-04-2021 03-05-2021 03-05-2021 03-05-2021 04:30 PM Active और देखें
35. Empanelment of Consultant Advisor for Identification of Domestic and Overseas assets for partial or total acquisition(MOIL/21-22/ET/20) 27-04-2021 27-05-2021 27-05-2021 27-05-2021 03:30 PM Active और देखें
36. Washing Picking and collection of Ferro grade and SM grade ore TD-4505 TDL-439 TDL-499 and TDL-469 from South side A dump at Tirodi Mine(MOIL/21-22/ET/24) 26-04-2021 26-05-2021 26-05-2021 26-05-2021 03:30 PM Active और देखें
37. Muffling for blasting at 6A 6B and 6C section of North Tirodi Mine(MOIL/21-22/ET/25) 26-04-2021 26-05-2021 26-05-2021 26-05-2021 03:30 PM Active और देखें
38. Underground exploratory drivage at -130 Level of Munsar Mine(MOIL/21-22/ET/23) 26-04-2021 26-05-2021 26-05-2021 26-05-2021 03:30 PM Active और देखें
39. Cleaning and collection waste from septic tanks, chambers in camp colony at Kandri Mine(KD/PER/NIT/2021-22/214) 24-04-2021 05-05-2021 05-05-2021 05-05-2021 04:30 PM Active और देखें
40. Cleaning and collection of Garbage and cleaning of Drains at Kandri Mine(KD/PER/NIT/2021-22/218) 24-04-2021 05-05-2021 05-05-2021 05-05-2021 04:30 PM Active और देखें
41. Cleaning maintenance and up keeping of Rest House at Kandri Mine(KD/PER/NIT/2021-22/216) 24-04-2021 05-05-2021 05-05-2021 05-05-2021 04:30 PM Active और देखें
42. Hiring of Machinery for loading(AGT/Min/UK/LT/21-22/94) 21-04-2021 01-05-2021 01-05-2021 01-05-2021 04:30 PM Active और देखें
43. Development cutting and levelling of Hill rock portion for consrtuction of WTP ESR for construction of new water supply schme at Ukwa Mine(Civil/UK/LT/21-22/153 Date- 19.04.2021) 21-04-2021 01-05-2021 01-05-2021 01-05-2021 04:30 PM Active और देखें
44. Handling and Despatch of ore from Tirodi and Sitapatore Mines for the period of two month(MOIL/21-22/ET/22) 20-04-2021 30-04-2021 30-04-2021 30-04-2021 03:30 PM Active और देखें
45. Removal of burnt LT and HT panel and shifting it to the required location.(AGT/BGT/IMB PLANT/21-22/60) 19-04-2021 27-04-2021 27-04-2021 27-04-2021 04:30 PM Active और देखें
46. labor assistant for material shifting during replacement of heavy assembly or repairing work in underground machineries like SDL, LHD, battery locomotive and Jumbo machines deployed in underground at Balaghat Mine(AGENT/BGT/MECH/WS/21-22/90) 19-04-2021 27-04-2021 27-04-2021 27-04-2021 04:30 PM Active और देखें
47. Operation of vibrating screen to screen sub grade mineral reject of Underground ROM at Balaghat Mine(MOIL/21-22/ET/12) 19-04-2021 19-05-2021 19-05-2021 19-05-2021 03:30 PM Active और देखें
48. Drilling 57 mm dia. drill holes for installing cable bolt in Manganiferous rock at 11 Level 12 Level and 13 Levels of underground at Balaghat Mine(MOIL/21-22/ET/13) 19-04-2021 19-05-2021 19-05-2021 19-05-2021 03:30 PM Active और देखें
49. Removal of spillage from the bottom of production shaft at 15th Level and bottom of Holmes shaft at 16.5th Level at Balaghat Mine(MOIL/21-22/ET/14) 19-04-2021 19-05-2021 19-05-2021 19-05-2021 03:30 PM Active और देखें
50. Picking and collection of 20 percent Mn. SM Grade Ore BGL-564 from sub grade mineral reject of Underground ROM at Balaghat Mine(MOIL/21-22/ET/15) 19-04-2021 21-05-2021 21-05-2021 21-05-2021 03:30 PM Active और देखें
51. Repairing of three row concertina coil fencing and lease boundary on Manegaon magazine side at Balaghat mine(CIVI/BGT/LT/AGT/21-22/72 DATE 15.04.2021) 16-04-2021 26-04-2021 26-04-2021 26-04-2021 04:30 PM Active और देखें
52. Providing and supplying of black gitti for underground concreating at Balaghat Mine(MIN/BGT/AGT/LT/21-22/73 DATE 15.04.2021) 16-04-2021 26-04-2021 26-04-2021 26-04-2021 04:30 PM Active और देखें
53. Underground Development at 13.5th Level South section at Balaghat Mine(MOIL/21-22/ET/10) 15-04-2021 12-05-2021 12-05-2021 12-05-2021 03:30 PM Active और देखें
54. Underground Development at -370 Level and -470 Level of Vertical Section at Chikla Mine(MOIL/21-22/ET/9) 15-04-2021 12-05-2021 12-05-2021 12-05-2021 03:30 PM Active और देखें
55. Extra excavation and RCC for sub-station at -450 Level and loco battery charging station at -450 Level and -550 Level of Kandri Mine(MOIL/21-22/ET/11) 15-04-2021 12-05-2021 12-05-2021 12-05-2021 03:30 PM Active और देखें
56. Pushing and Pulling of empty / loaded tubs / rock tubs in to / from cage at pit top and tipping the loaded tubs / rock tubs at OCF Gala / tipping point(BEL/MIN/2021-22/108) 13-04-2021 19-04-2021 19-04-2021 19-04-2021 04:30 PM Active और देखें
57. Removal of burnt cable and retrieving partially burnt cable for providing supply to equipment of IMB Plant(AGT/BGT/IMB PLANT/20-21/1379) 10-04-2021 16-04-2021 16-04-2021 16-04-2021 04:30 PM Active और देखें
58. Loading Transportation and Unloading of Manganese Ore ROM at Beldongri Mine(BEL/MIN/2021-22/73) 09-04-2021 15-04-2021 15-04-2021 15-04-2021 04:30 PM Active और देखें
59. Large Diameter drilling at Old Satak section at Beldongri Mine(BEL/MIN/2021-22/69) 09-04-2021 15-04-2021 15-04-2021 15-04-2021 04:00 PM Active और देखें
60. Washing Picking and collection of Ferro grade and SM grade ore TD-4505 TDL-439 TDL-499 and TDL-469 from east side of South Staff Quarter dump at Tirodi Mine(MOIL/20-21/ET/327) 09-04-2021 10-05-2021 10-05-2021 10-05-2021 03:30 PM Active और देखें
61. Cleaning of Underground ROM at Beldongri Mine(MOIL/20-21/ET/326) 09-04-2021 10-05-2021 10-05-2021 10-05-2021 03:30 PM Active और देखें
62. Cleaning of surplus contaminated ROM to recover Ferro grade and LGHS ore at Jawahar vertical shaft at Chikla Mine(MOIL/20-21/ET/329) 09-04-2021 10-05-2021 10-05-2021 10-05-2021 03:30 PM Active और देखें
63. GENERAL DAILY MAINT OF HEMMS AND LVS (TATA1200 HYD EXC, BD155 DOZER, DUMPERS, DRILL MC ICM 260, LV ETC.(DB/MECH/21-22/JGM(MECH)/21) 08-04-2021 16-04-2021 16-04-2021 16-04-2021 04:30 PM Active और देखें
64. Underground Development work at -450 Level of Kandri Mine(MOIL/20-21/ET/325) 07-04-2021 07-05-2021 07-05-2021 07-05-2021 03:30 PM Active और देखें
65. Removal of waste rock and magniferous rock and handling the same by mechanized means from Pit No.6 at Sitapatore Mine(MOIL/20-21/ET/324) 07-04-2021 07-05-2021 07-05-2021 07-05-2021 03:30 PM Active और देखें
66. Hiring of Hydraulic Rock Breaker suitable for Hydraulic Excavator of 45 Ton Class for Primary and Secondary Breaking of rock along with providing manpower for Operation an Maintenance of associated departmental Excavator at Dongri Buzurg Mine for the(MOIL/20-21/ET/328) 06-04-2021 05-05-2021 05-05-2021 05-05-2021 03:30 PM Active और देखें
67. LOWERING AND LAYING OF 100 PAIR TELEPHONE CABLE IN HOME SHAFT WINDER FROM SURFACE TO 12th LEVEL UNDERGROUND OF BALAGHAT MINE(BGT/TE/ELECT/AGENT/21-22/03) 05-04-2021 09-04-2021 09-04-2021 09-04-2021 03:30 PM Active और देखें
68. TENDER DOCUMENTS FOR REPAIRS TO JIG PANEL AND PROVISION FOR POWER SUPPLY TO INDIVIDUAL MOTOR OF JIG AT BALAGHAT MINE(BGT/TE/ELECT/AGENT/21-22/02) 05-04-2021 09-04-2021 09-04-2021 09-04-2021 03:30 PM Active और देखें
69. Repairing of Mechanical Dust Collector (MDC) , Providing and replacement of IBR blow down piping and suction strainers, air pre-heater repairing etc., for F.B.C. Boiler at EMD Plant(MOIL/EMD/CH/ADGM/2020-21/06) 05-04-2021 13-04-2021 13-04-2021 13-04-2021 04:30 PM Active और देखें
70. Removal of Garbage and cleaning of drain at camp areaTirodi Mine(TRD/CIVIL/20-21/09 DT- 29/03/2021) 03-04-2021 10-04-2021 10-04-2021 10-04-2021 03:30 PM Active और देखें
71. Purchasing of Digital Water Flow Meter with Telemetry System for Kandri Mine(KD/GEO/NIT/2021-22/2) 03-04-2021 16-04-2021 16-04-2021 16-04-2021 04:30 PM Active और देखें
72. Removal of Spillage from the bottom of Conveyor belt structure and Bottom of the shaft at 15th Level Loading station Holmes Shaft(AGT/BGT/MECH/WINDER/21-22/01) 02-04-2021 12-04-2021 12-04-2021 12-04-2021 04:30 PM Active और देखें
73. OPERATION OF PUMPS FOR DRINKING WATER SUPPLY IN CAMP AREA AND OFFICER COLONY AT KANDRI MINE.(KAN/CIVIL/NIT/21-22/5240 DT 02.04.2021) 02-04-2021 07-04-2021 07-04-2021 07-04-2021 04:30 PM Active और देखें
74. WEBSITE SINGLE/ PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF FDAO 60 GEAR OIL AND GREASE FOR CATERPILLAR MAKE (60 T) 773 E DUMPER(PUR/MOIL/C-5/10/E- 44/ 585 -M Dt.31/03/2021) 01-04-2021 30-04-2021 30-04-2021 30-04-2021 03:30 PM Active और देखें
75. TENDER DOCUMENTS FOR LAYING OF 3C X 120SQMM 11KV XLPE CABLE FROM PRODUCTION SHAFT SUBSTATION TO 8TH LEVEL UNDERGROUND FOR FEEDING SUPPLY TO UNDERGROUND 13.5TH LEVEL, 3.3KV/433 SUBSTATION OF PRODUCTION SHAFT AT BALAGHAT MINE 2 LENGTHS(BGT/TE/ELECT/AJGM/20-21/1397) 01-04-2021 08-04-2021 08-04-2021 08-04-2021 03:30 PM Active और देखें
76. Civil Interior and allied works for new Board Room at 3rd floor East west wing at MOIL BHAWAN, Nagpur.(MOIL/21-22/ET/16) 31-03-2021 30-04-2021 30-04-2021 30-04-2021 03:30 PM Active और देखें
77. Manual removal of sludge from S.K. Tank of IMB Plant at Balaghat Mine for the period of 5 Months(AGT/BGT/IMB PLANT/20-21/1388) 30-03-2021 09-04-2021 09-04-2021 09-04-2021 04:30 PM Active और देखें
78. PURCHASE OF EXPLOSIVES AND ACCESSORIES.(WE-111(ET-21) DT.30/03/2021) 30-03-2021 21-04-2021 21-04-2021 22-04-2021 03:30 PM Active और देखें
79. ET 6 for Rehabilitation of Integrated Manganese Ore Beneficiation Plant at Balaghat Mine.(MOIL/21-22/ET/6) 30-03-2021 16-04-2021 16-04-2021 16-04-2021 03:30 PM Active और देखें
80. Impact assessment study for CSR project of MOIL Limited.(MOIL/21-22/ET/7) 30-03-2021 30-04-2021 30-04-2021 30-04-2021 03:30 PM Active और देखें
81. construction of tipper loading platform beside vertical shaft at Gumgaon Mine.(MOIL/21-22/ET/8) 30-03-2021 30-04-2021 30-04-2021 30-04-2021 03:30 PM Active और देखें
82. Maintenance of various gardens at Balaghat Mine.(MOIL/21-22/ET/1) 25-03-2021 26-04-2021 26-04-2021 26-04-2021 03:30 PM Active और देखें
83. Operation of pumps for drinking water supply in different colonies at Kandri Mine.(MOIL/21-22/ET/3) 25-03-2021 26-04-2021 26-04-2021 26-04-2021 03:30 PM Active और देखें
84. ET4 for Construction of Mine lease boundary wall in pre cast pre stressed columns and panels with concertina coil at Ukwa Mine.(MOIL/21-22/ET/4) 25-03-2021 30-04-2021 30-04-2021 30-04-2021 03:30 PM Active और देखें
85. Maintenance and operation of water supply scheme at Balaghat Mine(MOIL/21-22/ET/2) 25-03-2021 30-04-2021 30-04-2021 30-04-2021 03:30 PM Active और देखें
86. ET5 for Construction of Retaining wall behind 1st vertical shaft to crushing and screening plant at Chikla Mine.(MOIL/21-22/ET/5) 25-03-2021 26-04-2021 26-04-2021 26-04-2021 03:30 PM Active और देखें
87. PURCHASE OF INVERTER AND 150AH TUBULAR BATTERIES FOR KANDRI MINE(PUR/KD/ELECT/20-21/5164) 24-03-2021 23-04-2021 23-04-2021 23-04-2021 04:30 PM Active और देखें
88. Purchasing of Digital Water Flow Meter with Telemetry System at Chikla Mine(TE-26 Dt.21032021) 22-03-2021 30-03-2021 30-03-2021 30-03-2021 04:30 PM Active और देखें
89. Operation and Maintenance of New Electrolytic cells at EMD Plant(MOIL/EMD/CH/AJGM/20-21/1556) 22-03-2021 03-04-2021 03-04-2021 03-04-2021 04:30 PM Active और देखें
90. Desigining, Engineering, Supplying, Installation, Commissioning and testing of 2 X 1600KVA, 11KV/415V Indoor Substation for second vertical Shaft at Ukwa Mine(MOIL/20-21/ET/312) 22-03-2021 22-04-2021 22-04-2021 22-04-2021 03:30 PM Active और देखें
91. Purchase of digital water flow meter with telemetry for dongri buzurg mine(MOIL/DB/20-21/1552 Dt 20/03/2021) 21-03-2021 30-03-2021 30-03-2021 30-03-2021 04:30 PM Active और देखें
92. Renovation of old toilet of EMD Plant at Dongri Buzurg Mine(DB/CIVIL/20-21/3432) 20-03-2021 25-03-2021 25-03-2021 25-03-2021 04:30 PM Active और देखें
93. PROCUREMENT OF NEOPRENE RUBBER BELLOWS FOR AIR PULSATING JIGS MOIL LTD BALAGHAT MINE.(PUR/MOIL/BGT/IMB/RUBBER BELLOWS/20-21/1355) 20-03-2021 31-03-2021 31-03-2021 31-03-2021 04:30 PM Active और देखें
94. Fixing of FRP sheet roofing at cell bay section of EMD Plant at Dongri Buzurg Mine(DB/CIVIL/20-21/1529) 20-03-2021 25-03-2021 25-03-2021 25-03-2021 04:30 PM Active और देखें
95. Dismantling of old Mangalore tiled roof A type Quarters for site preparation of Medical Administrative Building at Munsar Mine(Munsar/Civil/NIT/2020-21/215 17.03.2021) 19-03-2021 23-03-2021 23-03-2021 23-03-2021 04:30 PM Active और देखें
96. TWO BID SYSTEM FOR PURCHASE OF HORIZONTAL AND VERTICAL BRAKE TIE RODS FOR 250 HP WINDER AT MUNSAR MINE.(MUN/ENGG/TENDER/20-21/2133) 17-03-2021 31-03-2021 31-03-2021 31-03-2021 04:30 PM Active और देखें
97. Repairs to be done in Interface card and control card of Existing 1200 Amps 6RA 80 Siemens make DC Drive of kandri mine(KD/ELECT/20-21/5103) 17-03-2021 31-03-2021 31-03-2021 31-03-2021 04:30 PM Active और देखें
98. Modification in as built drawing of 40TPH crushing and screening plant for Munsar Mine.(MUN/ENGG/TENDER/20-21/2131, Dated - 15.03.2021) 16-03-2021 30-03-2021 30-03-2021 30-03-2021 04:30 PM Active और देखें
99. Large Diameter drilling at old satak section at Beldongri Mine(Bel/Min/NIT/2020-21/2832) 16-03-2021 24-03-2021 24-03-2021 24-03-2021 04:30 PM Active और देखें
100. Procurement of Motor and Brake Assembly of EOT Crane of Make Meeka Machinery Private Limited for EMD Plant, Dongri Buzurg Mine.(DB/EMD/ELECT/20-21/1505) 13-03-2021 06-04-2021 06-04-2021 06-04-2021 04:30 PM Active और देखें

निविदाएं अधिक जानकारी

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

(2204) वर्ष के निविदाएं देखें
(2024) वर्ष के निविदाएं देखें
(2023) वर्ष के निविदाएं देखें
(2022) वर्ष के निविदाएं देखें
(2021) वर्ष के निविदाएं देखें
(2020) वर्ष के निविदाएं देखें
(2019) वर्ष के निविदाएं देखें
(2018) वर्ष के निविदाएं देखें
(2017) वर्ष के निविदाएं देखें
(2016) वर्ष के निविदाएं देखें
(2015) वर्ष के निविदाएं देखें
(2014) वर्ष के निविदाएं देखें
(2013) वर्ष के निविदाएं देखें
(2012) वर्ष के निविदाएं देखें
(24) वर्ष के निविदाएं देखें