1. Trench cutting in ore stacks for sampling at Chikla Mine(Gr.II/GM(M)/CONT/Trench-cut/83/CH/2017-18/2) 21-04-2017 28-04-2017 28-04-2017 28-04-2017 03:30 PM Active और देखें
2. Strengthening and construction of RCC Side walls for Railway Siding at Balaghat Mine(MOIL/17-18/ET/14) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active और देखें
3. Construction of Drain Motor garage Black smith Shop near workshop and construction of Shed and Cycle Stand near Vertical Shaft at Ukwa Mine.(MOIL/17-18/ET/13) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active और देखें
4. Maintenance and Operation of Water Supply Scheme Dongri Bz. Mine(MOIL/17-18/ET/15) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active और देखें
5. Construction of tar road from main PWD road to MOIL Rest house, MOIL gate no.1 to PWD road and mine and bungalow no.2 towards Jamrapani staff quarter at Tirodi Mine.(MOIL/17-18/ET/16) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active और देखें
6. Construction of substation building at Dongri Bz. Mine(MOIL/17-18/ET/20) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active और देखें
7. Construction of Railway Siding Platform at Chikla Mine(MOIL/17-18/ET/11) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active और देखें
8. Renovation of Office of Electrical Department and Cap Lamp Room and construction of shed for storage purpose at 6 th level premises at Balaghat Mine.(Civil /HO/17-18/BGT /09 Dated 18/04/2017) 20-04-2017 18-05-2017 18-05-2017 18-05-2017 03:30 PM Active और देखें
9. Removal of waste rock and handling the same by mechanized means from Magazine dump at Gumgaon Mine(MOIL/17-18/ET/17) 20-04-2017 22-05-2017 22-05-2017 22-05-2017 03:30 PM Active और देखें
10. Picking and collection of material from dumps at Munsar Mine(MOIL/17-18/ET/19) 20-04-2017 22-05-2017 22-05-2017 22-05-2017 03:30 PM Active और देखें
11. Removal of waste rock and magniferous rock and handling the same by mechanized means from Pit No.5 at Sitapatore Mine(MOIL/17-18/ET/18) 20-04-2017 25-05-2017 25-05-2017 25-05-2017 03:30 PM Active और देखें
12. Picking and Collection of Material from East Side of A Dump at Tirodi Mine(TRD/Mine/HO/2017-18/158) 19-04-2017 26-04-2017 26-04-2017 26-04-2017 04:30 PM Active और देखें
13. Picking and Collection of Material from Off The Pit area at Dump at Tirodi Mine(TRD/Mine/HO/2017-18/157) 19-04-2017 26-04-2017 26-04-2017 26-04-2017 04:30 PM Active और देखें
14. Picking and Collection of Material from North Dump at Tirodi Mine(TRD/Mine/HO/2017-18/156) 19-04-2017 26-04-2017 26-04-2017 26-04-2017 04:30 PM Active और देखें
15. Providing and Laying epoxy flooring for Work Shop at Munsar Mine.(Mun/C/HO/Agent/17-18/64 dt 19/04/2017) 19-04-2017 28-04-2017 28-04-2017 28-04-2017 04:30 PM Active और देखें
16. Providing and Fitting PVC over head water tank at 20 No. A type Quarter in Wahitola at Munsar Mine.(Mun/C/HO/Agent/17-18/63 Dt 19/04/2017) 19-04-2017 28-04-2017 28-04-2017 28-04-2017 04:30 PM Active और देखें
17. PURCHASE OF HSD-3882 KL (AS PER ANNEXURE - A ENCLOSED).(E-3 DT.19.04.2017) 19-04-2017 12-05-2017 12-05-2017 12-05-2017 03:30 PM Active और देखें
18. Cleaning of Surplus underground ROM at Munsar Mine.(Mun/Mine/HO/Agent/17-18/59 dt18/04/2017) 18-04-2017 24-04-2017 24-04-2017 24-04-2017 03:30 PM Active और देखें
19. Construction of Barbed wire fencing at near 6 No North Section Tirodi Mine.(TRD/Civil/A/2017-18/133) 18-04-2017 26-04-2017 26-04-2017 26-04-2017 04:30 PM Active और देखें
20. Transportation of Sand for sand stowing at Balaghat Mine(Gr.-I/CGM(PR)/CONT/SAND/02/BGT/2017-18/02) 18-04-2017 26-04-2017 26-04-2017 26-04-2017 05:00 PM Active और देखें
21. Waterproofing Works by means of laying torchshield over roof of Administrative Building including allied civil works at Balaghat Mine(CIVIL/BGT/T.E./2017-18/390 Date 13.04.2017) 18-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active और देखें
22. Construction of RCC Water Sump beside Slime Pond and Fencing Works for the front garden of Integrated Manganese Beneficiation Plant, IMB Balaghat Mine(CIVIL/BGT/T.E./2017-18/387 Date 16.04.2017) 18-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active और देखें
23. Waterproofing Works by means of laying torchshield over roof of Administrative Building including allied civil works at Balaghat Mine(CIVIL/BGT/T.E./2017-18/390 Date 13.04.2017) 18-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active और देखें
24. Construction of RCC Water Sump beside Slime Pond and Fencing Works for the front garden of Integrated Manganese Beneficiation Plant, IMB Balaghat Mine(CIVIL/BGT/T.E./2017-18/387 Date 16.04.2017) 18-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active और देखें
25. Replacement of old damaged and worn out steel doors and windows with new steel doors and windows for Camp Quarters of Balaghat Mine.(CIVIL/BGT/T.E./2017-18/304 Date 13.04.2017) 13-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active और देखें
26. Providing PVC Polythene Sheets to Mangalore Tiled Roofing to Camp Quarters and tarpaulin sheets over industrial structures including various miscellaneous repair works and retiling at Balaghat Mine(CIVIL/BGT/T.E./2017-18/307 Date 13.04.2017) 13-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active और देखें
27. Repair to roof of labour and staff quarter of New Colony, F.M.Colony, Chikla Type Quarters, Imlitekra Camp, Hirapur Camp, Awlajhari Camp under Monsoon Preparatory Works at Balaghat Mine(CIVIL/BGT/T.E./2017-18/298 Date 13.04.2017) 13-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active और देखें
28. Cleaning of surface drains under Monsoon Preparatory Works at Balaghat Mine(CIVIL/BGT/T.E./2017-18/301 Date 13.04.2017) 13-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active और देखें
29. Trench cutting in ore Stacks at Beldongri Mine.(bel/trench cut/sampling/17-18/103) 13-04-2017 25-04-2017 25-04-2017 25-04-2017 04:30 PM Active और देखें
30. Annual Repair to camp quarters at Chikla Mine.(Civil /HO/17-18 /CH/01 Dated 12/04/2017) 13-04-2017 12-05-2017 12-05-2017 12-05-2017 03:30 PM Active और देखें
31. Picking and sorting of SM grade ore from dumps at Kandri Mine(MOIL/17-18/ET/10) 13-04-2017 12-05-2017 12-05-2017 12-05-2017 03:30 PM Active और देखें
32. Construction of vehicle maintenance pit at work shop premises at Chikla Mine.(Civil /HO/17-18 /CH/02 Dated 12/04/2017) 13-04-2017 12-05-2017 12-05-2017 12-05-2017 03:30 PM Active और देखें
33. Disposal of Sludge at EMD Plant, Dongri Buzurg Mine(CGM (P and D)/EMD/17-18/04) 13-04-2017 05-05-2017 04-05-2017 04-05-2017 03:30 PM Active और देखें
34. U/G Sump Cleaning of Ukwa Mine (i) Vertical shaft U/G Section (ii) Ch 50 U/G Section.(A and Sr DGM(M)/Civil/UM/17-18/72) 12-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active और देखें
35. Construction of OCF Shed at Beldongri Mine.(Bel/Civil//Mine/AGT/17-18/90) 12-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active और देखें
36. Maintenance and operation of water supply scheme at Ukwa Mine(A and Sr DGM(M)/Civil/UM/17-18/75) 12-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active और देखें
37. Maintenance and operation of water supply scheme at Ukwa Mine(A and Sr DGM(M)/Civil/UM/17-18/75) 12-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active और देखें
38. 550 H.P., 1000 RPM, LAMINATED YOKE, SHUNT WOUND, D.C. MOTOR-1 NO. (FOR DOUBLE DRUM WINDER OF BALAGHAT MINE) (AS PER ANNEXURE - C ENCLOSED)(Only Through e-procurement)(WE-123 DT.24/03/2017, eTENDER NO.MOIL/17-18/ET/5) 12-04-2017 28-04-2017 28-04-2017 28-04-2017 03:30 PM Active और देखें
39. Cleaning of Sump in Underground at Balaghat Mine.(Agent Dy DGM/Mining/BGT/17-18/52 Dt 03.04.2017) 11-04-2017 14-04-2017 14-04-2017 14-04-2017 04:30 PM Active और देखें
40. Providing and Supplying of On Road DC Motor Speed Controller (DC Chopper) 550Amps, (72 to 120) Volts probably Curtis make of model 1231C 7701 or equivalent to for Gumgaon mine ( GM/Elect/TE/17-18/52,Dtd - 10.04.2017 ) 11-04-2017 24-04-2017 24-04-2017 24-04-2017 3:30 PM Active और देखें
41. Replacement of transfer chute liners bunker liners And chutes bunker repair at IMB plant Balaghat mine (BGT/MECH/IMBP/17-18/170) 10-04-2017 27-04-2017 27-04-2017 27-04-2017 4:30 PM Active और देखें
42. Replacement of transfer chute liners bunker liners And chutes bunker repair at IMB plant Balaghat mine (BGT/MECH/IMBP/17-18/170) 10-04-2017 27-04-2017 27-04-2017 27-04-2017 4:30 PM Active और देखें
43. Replacement of existing 3 phase, 5 wire, LT Overhead Line erected from IMB plant to tale end pond at Dongri Buzurg Mine.(DB/ELECT/17-18/1085) 07-04-2017 12-04-2017 12-04-2017 12-04-2017 04:30 PM Active और देखें
44. Construction of gantry for U/G development waste rock disposal near BDC at Kandri Mine.(KAN/CIVIL/17-18/02 DT.05.04.2017) 07-04-2017 15-04-2017 15-04-2017 15-04-2017 03:30 PM Active और देखें
45. Maintenance,watch ward of Garden in front of administrative building,Rest House, type B C quarters,M.M.Bungalow, Hospital,near Hanuman Mandir (Type A qtrs) garden at Kandri.(KAN/CIVIL/17-18/01 DT. 05/04/2017) 07-04-2017 15-04-2017 15-04-2017 15-04-2017 03:30 PM Active और देखें
46. Removal of accumulated Pebbles near sand stowing plants at Balaghat Mine(Gr.-I/CGM(PR)/CONT/PEBBLES/34/BGT/2017-18/01) 07-04-2017 18-04-2017 18-04-2017 18-04-2017 03:30 PM Active और देखें
47. Pushing of tubs and unloading in Underground at Chikla Mine(Gr.II/CGM/CONT/TUB/81/CH/2017-18/1) 07-04-2017 18-04-2017 18-04-2017 18-04-2017 03:30 PM Active और देखें
48. PARAFFIN WAX(PUR/MOIL/C-11/5/WE-1 (MOIL/17-18/ET/9)) 07-04-2017 02-05-2017 02-05-2017 02-05-2017 03:30 PM Active और देखें
49. PARAFFIN WAX (PUR/MOIL/C-11/5/WE-1 (MOIL/17-18/ET/9)) 07-04-2017 11-05-2017 11-05-2017 11-05-2017 3:30 PM Active और देखें
50. Replacement of conductor and cable of 3 phase, 3 wire, 11 KV HT Overhead Line from main electrical substation to IMB Plant at Dongri Buzurg Mine.(DB/ELECT/17-18/1084) 06-04-2017 11-04-2017 11-04-2017 11-04-2017 04:35 PM Active और देखें
51. Drilling of Bore holes with Submersible pump at Kesri Camp at Chikla mine(CH/CIVIL/16-17/1053 dated 25/03/2017) 04-04-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active और देखें
52. Making of Road from Manoj Trivedi dump to 9 No. near Jamrapani development area at Tirodi Mine.(TRD/Civil/A/2016-17/3751A) 04-04-2017 12-04-2017 12-04-2017 12-04-2017 04:30 PM Active और देखें
53. Drilling of Bore holes with Submersible pump at Kesri Camp at Chikla mine(CH/CIVIL/16-17/1053 dated 25/03/2017) 04-04-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active और देखें
54. Transporting, Shifting of accumulated gitti at fill pass at Ch.3200 7th Level U/G to other cross cuts at Balaghat Mine(Agent Sr.DGM(M)/Mining/BGT/2016-17/8940 Dt 30.03.1) 03-04-2017 10-04-2017 10-04-2017 10-04-2017 04:00 PM Active और देखें
55. Transporting, Shifting of accumulated gitti at fill pass at Ch.3200 7th Level U/G to other cross cuts at Balaghat Mine(Agent Sr.DGM(M)/Mining/BGT/2016-17/8940 Dt 30.03.1) 03-04-2017 10-04-2017 10-04-2017 10-04-2017 04:00 PM Active और देखें
56. Miscellaneous Contract works namely Cleaning of Leaching Vessels Stripping of EMD Flakes and Removing Bottom of EMD at EMD Plant, Dongri Buzurg Mine(CGM (P and D)/EMD/17-18/03) 03-04-2017 24-04-2017 24-04-2017 24-04-2017 03:30 PM Active और देखें
57. Miscellaneous Contract works at EMD Plant, Dongri Buzurg Mine.(CGM (P and D)/EMD/17-18/02) 03-04-2017 24-04-2017 24-04-2017 24-04-2017 03:30 PM Active और देखें
58. Washing and Neutralization of Sludge at EMD Plant, Dongri Buzurg Mine.(CGM (P and D)/EMD/17-18/01) 01-04-2017 20-04-2017 20-04-2017 20-04-2017 03:30 PM Active और देखें
59. Cleaning of Sump at Ch. 9500 and Ch. 10800 U/G Section of Ukwa Mine(Gr.-I/CGM(PR)/CONT/UG-SUMP/35/UK/2016-17/17) 31-03-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active और देखें
60. Cleaning of Sump at Ch. 9500 and Ch. 10800 U/G Section of Ukwa Mine(Gr.-I/CGM(PR)/CONT/UG-SUMP/35/UK/2016-17/17) 31-03-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active और देखें
61. Cleaning of surplus opencast ROM at Kandri Mine(GM(M)-III/CONT/ROM-CL/58/KAN/2016-17/56) 30-03-2017 07-04-2017 07-04-2017 07-04-2017 03:30 PM Active और देखें
62. Maintenance of Garden in Mine Office and Mine Manager Bungalow at Beldongri Mine(Bel/Mine/Civil/AGT/16-17/3468) 30-03-2017 05-04-2017 05-04-2017 05-04-2017 04:30 PM Active और देखें
63. Design and Detail Engineering ,supply Fabrication,Erection ang Commisioining,Testing of water softener at EMD PLANT Dongri Buzurg Mine(MOIL/EMD/CH/ADGM/2016-17/1063) 29-03-2017 08-04-2017 08-04-2017 08-04-2017 04:30 PM Active और देखें
64. Maintenance and operation of Water Filtration Plant and Water Supply Scheme at Tirodi Mine(TRD/Civil/A/2016-17/1045) 28-03-2017 07-04-2017 07-04-2017 07-04-2017 04:30 PM Active और देखें
65. Installation of LED Lights in place of Metal Halide Lamps at Badminton Court, West Court, MOIL Ltd. Nagpur(SDGM(E)/86/ HO/16-17/ 346) 24-03-2017 12-04-2017 12-04-2017 12-04-2017 03:30 PM Active और देखें
66. Supply of Drenging Submersible Pump With agitator and other attachment for Cleaning of underground Sump of Balaghat Mine (SDGM/BGT/MECH/PUMP/16-17/8750) 23-03-2017 30-03-2017 30-03-2017 30-03-2017 4:30 PM Active और देखें
67. purchase of Flexible Trailing Copper Conductor Cable 1200 Mtrs. (WE-122 (e-tender no. MOIL/17-18/ET/4)) 23-03-2017 19-04-2017 19-04-2017 19-04-2017 3:30 PM Active और देखें
68. Water Proofing to RCC Slabs Quarters/Repairs to roof of Labor and staff and executive quarter Ukwa ,Gudma and Prem Nagar camp at Ukwa Mine.(A and Sr DGM(M)/Civil/UM/16-17/3536) 22-03-2017 08-04-2017 08-04-2017 08-04-2017 04:30 PM Active और देखें
69. Replacement of old damaged doors and windows with new steel doors and windows at camp quarters at Ukwa Mine.(A and Sr DGM(M)/Civil/UM/16-17/3527) 22-03-2017 08-04-2017 08-04-2017 08-04-2017 04:30 PM Active और देखें
70. Retiling and Providing and laying Polythene sheet and GI sheet for repairs of roofs work of camp Qtr at UkwaMine(A and Sr DGM(M)/Civil/UM/16-17/3533) 22-03-2017 08-04-2017 08-04-2017 08-04-2017 04:30 PM Active और देखें
71. Cleaning of Surface Drain at Ukwa Mine(A and Sr DGM(M)/Civil/UM/16-17/3530) 22-03-2017 08-04-2017 08-04-2017 08-04-2017 04:30 PM Active और देखें
72. Cleaning of underground ROM sorting at Beldongri Mine(MOIL/17-18/ET/2) 22-03-2017 25-04-2017 25-04-2017 25-04-2017 03:30 PM Active और देखें
73. Underground development of ore drive at 13.50 feet level at Balaghat Mine(MOIL/17-18/ET/1) 22-03-2017 25-04-2017 25-04-2017 25-04-2017 03:30 PM Active और देखें
74. Picking and collection of material from North dump at Tirodi Mine(MOIL/17-18/ET/3) 22-03-2017 25-04-2017 25-04-2017 25-04-2017 03:30 PM Active और देखें
75. Purchase of 120 W LED Street Light fittings for Chikla mine(TE/CH/PUR-ELECT/16-17/1020) 21-03-2017 30-03-2017 30-03-2017 30-03-2017 03:30 PM Active और देखें
76. Construction of Sampal room at Sitapatore Mine(S-S/Civil/HO/2016-17/3715) 21-03-2017 30-03-2017 30-03-2017 30-03-2017 04:30 PM Active और देखें
77. TENDER FOR ANNUAL REPAIRS AND MAINTENANCE CONTRACT FOR DOMESTICELECTRICAL INSTALLATION OF RESIDENTIAL AND NON RESIDENTIAL BUILDINGS AT UKWA MINE(UK/ELECT/2016-17/3506) 21-03-2017 05-04-2017 05-04-2017 05-04-2017 04:30 PM Active और देखें
78. Construction of Retaining wall, drain and providing and fixing precast RCC covers over drain at new 64 nos. A-Type quarters at Chikla Mine.(MOIL/16-17/ET/201) 21-03-2017 17-04-2017 17-04-2017 17-04-2017 03:30 PM Active और देखें
79. for Construction of compound wall for guest house at TirodiMine(MOIL/16-17/ET/202) 21-03-2017 17-04-2017 17-04-2017 17-04-2017 03:30 PM Active और देखें
80. Providing Furniture and Interior For Director staff on 3rd Floor of MOIL BHAWAN, Katol Road, Nagpur(MOIL/16-17/ET/200) 21-03-2017 17-04-2017 17-04-2017 17-04-2017 03:30 PM Active और देखें
81. Annual Repairs to Camp Quarters at Dongri Bz. Mine.(CIVIL/HO/16-17/DB/ 90 Dt- 20/03/2017) 21-03-2017 20-04-2017 20-04-2017 20-04-2017 03:30 PM Active और देखें
82. Purchase of Drilling Accessories for CTH14 Single Boom Drilling machines(PUR/MOIL/C-5/23/WE-109 (MOIL/16-17/ET/205)) 20-03-2017 17-04-2017 17-04-2017 17-04-2017 03:30 PM Active और देखें
83. Cleaning of underground ROM sorting at Beldongri Mine(GM(M)-III/CONT/ROM/60/BEL/2016-17/55) 17-03-2017 24-03-2017 24-03-2017 24-03-2017 03:30 PM Active और देखें
84. Replacement of CFL Lamps and FI. Lamp fixture with LED Lights at CMD Bungalow MOIL Ltd. Nagpur(SDGM(E)/86/ HO/16-17/ 337) 17-03-2017 06-04-2017 06-04-2017 06-04-2017 03:30 PM Active और देखें
85. Making and Supply of stemming material(Mud Plug) used for Blasting at Ukwa Mine(A and Sr DGM(M)/Civil/UM/16-17/3461) 16-03-2017 01-04-2017 01-04-2017 01-04-2017 04:30 PM Active और देखें
86. Trench cutting in Ore stacks including sample bags carrying at Ukwa Mine(A and Sr DGM(M)/Civil/UM/16-17/3458) 16-03-2017 01-04-2017 01-04-2017 01-04-2017 04:30 PM Active और देखें
87. RENOVATION OF TOILETS IN MM BUNGALOW AT KANDRI MINE(KAN/CIVIL/16-17/197 DT 14.03.2017) 15-03-2017 21-03-2017 21-03-2017 21-03-2017 03:00 PM Active और देखें
88. PLOTTER (44) - 1 NO. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-121 DT.15/03/2017, eTENDER NO.MOIL/16-17/ET/204) 15-03-2017 07-04-2017 07-04-2017 07-04-2017 03:30 PM Active और देखें
89. outsource of pumping operation at underground vertical shaft 400 ft level at Gumgaon mine by contractual means for 2 months.(A-III/MUN/GUM/16-17/1605 dated-11.03.2017) 14-03-2017 16-03-2017 16-03-2017 16-03-2017 04:30 PM Active और देखें
90. REPAIRING OF TRACK CHAIN ASSY- 2 Nos, SPROCKET ASSY- 2 Nos AND IDLER ASSY- 2 Nos OF DI 500 No 1 SANDVIK MAKE DRILLING MACHINE OPERATING AT DONGRI BUZURG MINE(A-II/CHK/DB/16-17/997 dtd 11.03.2017) 14-03-2017 22-03-2017 22-03-2017 22-03-2017 04:30 PM Active और देखें
91. Construction of Residential Quarter at Chikla Mine of MOIL (AType 100 units 8 Nos Type B quarters, 4 Nos Type C quarters and 1 No Type D quarter ) including Internal and External Electrification Infrastructure amenities.(MOIL/16-17/ET/182) 14-03-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active और देखें
92. Construction of Residential Quarter at Chikla Mine of MOIL (AType 100 units 8 Nos Type B quarters, 4 Nos Type C quarters and 1 No Type D quarter ) including Internal and External Electrification Infrastructure amenities.(MOIL/16-17/ET/182) 14-03-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active और देखें
93. Refurbishing and deepening of 2nd outlet and modification of sinking winder at Balaghat mine.(SDGMT/BGT/II-Outlet/Tender/16-17/302/ET-195) 14-03-2017 18-04-2017 18-04-2017 18-04-2017 03:30 PM Active और देखें
94. Sinking of 2nd. Outlet- Ventilation shaft from surface to -150L (2nd. Level) at Kandri Mine(SDGMT/KAN/V-ShaftII-Outlet/Tender/16-17/303/ET-196) 14-03-2017 19-04-2017 19-04-2017 19-04-2017 03:30 PM Active और देखें
95. Out sourcing of crushing and screening plant operation at Gumgaon mine(A-III/MUN/GUM/16-17/1607 dated-11.03.2017) 11-03-2017 16-03-2017 16-03-2017 16-03-2017 04:30 PM Active और देखें
96. Sulphuric Acid(PUR/MOIL/C-11/3/WE-120 (MOIL/16-17/ET/203)) 11-03-2017 31-03-2017 31-03-2017 31-03-2017 03:30 PM Active और देखें
97. Providing and Supplying of Auxiliary Ventilation Fan 1.5 KW, 1480RPM, Hollow FRP Blade, 7000 cfm for Gumgaon mine 2 Nos(GM/ELECT/TE/16-17/3830 DT. 11.03.2017) 11-03-2017 31-03-2017 31-03-2017 31-03-2017 03:30 PM Active और देखें
98. Removal of spillage material accumulated during hoisting of skip from 15th L of production shaft at Balaghat Mine(Gr.-I/CGM(PR)/CONT/SPILLAGE/32/BGT/16-17/16) 10-03-2017 21-03-2017 21-03-2017 21-03-2017 03:30 PM Active और देखें
99. HIRING OF 80 MT CAPACITY MOBILE CRANE WITH 360 DEGREE REVOLVING TELESCOPIC EXTENDED BOOM OF UNLOADING AND ASSEMBLING OF TATA HITACHI EX1200V 1 NO EXCAVATOR AT DONGRI BUZURG MINE(A-II/CHK/DB/16-17/990 dtd 08.03.2017) 09-03-2017 14-03-2017 14-03-2017 14-03-2017 04:30 PM Active और देखें
100. Cleaning of surplus underground ROM at Kandri Mine (GM(M)-III/CONT/59/ROM-CL/KAN/16-17/54) 08-03-2017 15-03-2017 15-03-2017 15-03-2017 3:30 PM Active और देखें

निविदाएं अधिक जानकारी

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

(2204) वर्ष के निविदाएं देखें
(2024) वर्ष के निविदाएं देखें
(2023) वर्ष के निविदाएं देखें
(2022) वर्ष के निविदाएं देखें
(2021) वर्ष के निविदाएं देखें
(2020) वर्ष के निविदाएं देखें
(2019) वर्ष के निविदाएं देखें
(2018) वर्ष के निविदाएं देखें
(2017) वर्ष के निविदाएं देखें
(2016) वर्ष के निविदाएं देखें
(2015) वर्ष के निविदाएं देखें
(2014) वर्ष के निविदाएं देखें
(2013) वर्ष के निविदाएं देखें
(2012) वर्ष के निविदाएं देखें
(24) वर्ष के निविदाएं देखें
पूर्ण निविदा पुरालेख देखें
सभी मॉयल निविदाएं देखें