निविदाएं संग्रह
| क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
|---|---|---|---|---|---|---|---|---|
| 1. | Purchase of Hose Fittings for Rock Drill and Air Leg Machines.(WE-69 e -Tender No. MOIL/19-20/ET-263 Dt.30.9.2019) | 30-09-2019 | 22-10-2019 | 22-10-2019 | 23-10-2019 | 03:30 PM | Active | और देखें |
| 2. | Fabrication, Supply, Erection and Commissioning of Top cover of Leaching Vessel at EMD Plant Dongri Buzurg Mine(MOIL/19-20/ET/255) | 27-09-2019 | 25-10-2019 | 25-10-2019 | 25-10-2019 | 03:30 PM | Active | और देखें |
| 3. | Single bid system for Collection and transportation of sand at Chikla mine(TE/CH/Civil/355) | 26-09-2019 | 05-10-2019 | 05-10-2019 | 05-10-2019 | 03:30 PM | Active | और देखें |
| 4. | Recovery of cleaned ore from surface bed reject area at Parsoda Mine(MOIL/19-20/ET/250) | 26-09-2019 | 09-10-2019 | 09-10-2019 | 09-10-2019 | 03:30 PM | Active | और देखें |
| 5. | Additional excavation in Manganiferous rock between Ch.36.25 to Ch.38 at -300 Level at Gumgaon Mine(MOIL/19-20/ET/251) | 26-09-2019 | 25-10-2019 | 25-10-2019 | 25-10-2019 | 03:30 PM | Active | और देखें |
| 6. | Transportation of ROM/rock tubs from vertical shaft top to OCF at Beldongri Mine(MOIL/19-20/ET/254) | 26-09-2019 | 25-10-2019 | 25-10-2019 | 25-10-2019 | 03:30 PM | Active | और देखें |
| 7. | Sorting of surplus ROM underground section of Ukwa Mine( MOIL/19-20/ET/252) | 26-09-2019 | 25-10-2019 | 25-10-2019 | 25-10-2019 | 03:30 PM | Active | और देखें |
| 8. | Picking and collection of UKL -471 20 percent from Ch.6800 to Ch.9500 footwall dump area at Ukwa Mine(MOIL/19-20/ET/258) | 26-09-2019 | 25-10-2019 | 25-10-2019 | 25-10-2019 | 03:30 PM | Active | और देखें |
| 9. | Cleaning of surplus contaminated ROM to recover LGHS Ore at 2nd vertical shaft of Chikla Mine(MOIL/19-20/ET/253) | 26-09-2019 | 25-10-2019 | 25-10-2019 | 25-10-2019 | 03:30 PM | Active | और देखें |
| 10. | PURCHASE OF STEEL BRAIDED RUBBER HOSE-3 ITEMS(PUR/MOIL/C-5/43/E-46/561-M Dt. 26/09/2019) | 26-09-2019 | 25-10-2019 | 25-10-2019 | 25-10-2019 | 03:30 PM | Active | और देखें |
| 11. | Purchase of 200Watt LED Flood Lights for Mobile Lighting Towers at Dongri Buzurg Mine, MOIL Limited.( DB/ELECT/19-20/328) | 25-09-2019 | 17-10-2019 | 17-10-2019 | 17-10-2019 | 04:30 PM | Active | और देखें |
| 12. | Cleaning of Septik tank with vaccume machine at camp and colony area at Tirodi Mine.(TRD/CIVIL/19-20/15 DATED 17.09.2019) | 24-09-2019 | 30-09-2019 | 30-09-2019 | 30-09-2019 | 03:30 PM | Active | और देखें |
| 13. | Purchase of CEMENT-1196 MT(WE-67 e -Tender No. MOIL/19-20/ET-261 Dt.24.9.2019) | 24-09-2019 | 16-10-2019 | 16-10-2019 | 17-10-2019 | 03:30 PM | Active | और देखें |
| 14. | Construction of D.G.set and chimney foundation and switch and breaker room and shed over DG set at Dongri Buzurg Mine(MOIL/19-20/ET/236) | 24-09-2019 | 23-10-2019 | 23-10-2019 | 23-10-2019 | 03:30 PM | Active | और देखें |
| 15. | Watch and ward of new colony premises at Chandmara village at Dongri Buzurg Mine(MOIL/19-20/ET/233) | 24-09-2019 | 23-10-2019 | 23-10-2019 | 23-10-2019 | 03:30 PM | Active | और देखें |
| 16. | Construction of cement concrete platform, RCC boundry wall and vehicle parking / repair cum maintenance shed at Dongri Buzurg Mine(MOIL/19-20/ET/234) | 24-09-2019 | 23-10-2019 | 23-10-2019 | 23-10-2019 | 03:30 PM | Active | और देखें |
| 17. | Construction of weigh bridge office and weigh bridge foundation pit for Parsoda Mine(MOIL/19-20/ET/239) | 24-09-2019 | 23-10-2019 | 23-10-2019 | 23-10-2019 | 03:30 PM | Active | और देखें |
| 18. | Providing land scaping and beautification works at newly constructed administrative building at Ukwa Mine(MOIL/19-20/ET/238) | 24-09-2019 | 23-10-2019 | 23-10-2019 | 23-10-2019 | 03:30 PM | Active | और देखें |
| 19. | Construction of Brick masonry compound wall with RCC colunm at Mine Managers bungalow at Dongri Buzurg Mine(MOIL/19-20/ET/237) | 24-09-2019 | 23-10-2019 | 23-10-2019 | 23-10-2019 | 03:30 PM | Active | और देखें |
| 20. | Purchase of Hand Held Electro-Hydraulic Drill Machine for Underground Mining Application at Various Mines with Operation and Maintenance Spares - 6 Nos.(4 Lots).(Only Through e-procurement)(WE-64(ET-259) DT.23/09/2019) | 24-09-2019 | 21-10-2019 | 21-10-2019 | 22-10-2019 | 03:30 PM | Active | और देखें |
| 21. | Operation and minor maintenance of water supply scheme at MOIL Bhawan, CMD Bungalow, CMS with A type quarters and West court with guest house, Transit house and Bansivilla compound area, MOIL Nagpur(MOIL/19-20/ET/235) | 24-09-2019 | 23-10-2019 | 23-10-2019 | 23-10-2019 | 03:30 PM | Active | और देखें |
| 22. | Purchase of Lighting Transformers - 7 Lots. for Various Mines (Only Through e-procurement)(WE-72(ET-262) DT.24/09/2019) | 24-09-2019 | 30-10-2019 | 30-10-2019 | 31-10-2019 | 03:30 PM | Active | और देखें |
| 23. | Purchase of Semi Automatic Analyser - 1 No. and Cell Counter - 1 No.(2 Lots.) (Only Through e-procurement)(WE-71(ET-260) DT.24/09/2019) | 24-09-2019 | 04-11-2019 | 05-11-2019 | 05-11-2019 | 03:30 PM | Active | और देखें |
| 24. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR DTO JAWCRUSHER( PUR/MOIL/C-5/23/E-39/428-M Dt. 23/09/2019) | 23-09-2019 | 14-10-2019 | 14-10-2019 | 14-10-2019 | 03:30 PM | Active | और देखें |
| 25. | Purchase of Accessories for Cable Bolting Machines(WE-57 e -Tender No. MOIL/19-20/ET-257 Dt.23.9.2019) | 23-09-2019 | 22-10-2019 | 22-10-2019 | 23-10-2019 | 03:30 PM | Active | और देखें |
| 26. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR FLOWMORE MAKE PUMP MODEL-590-150 X 150-6TG.(PUR/MOIL/C-5/28/E-40/457-M Dt. 20-09-2019) | 20-09-2019 | 11-10-2019 | 11-10-2019 | 11-10-2019 | 03:30 PM | Active | और देखें |
| 27. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR ATLAS COPCO MAKE ROCK BREAKER MODEL MB -1500.(PUR/MOIL/C-5/70/E-41/511-M Dt. 19/09/2019) | 19-09-2019 | 09-10-2019 | 09-10-2019 | 09-10-2019 | 03:30 PM | Active | और देखें |
| 28. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF KOEL DIESEL ENGINE (4R1040TC) SUITABLE FOR TEREX BACKHOE LOADER.(PUR/MOIL/C-5/68/E-44/552-M Dt. 19-09-2019) | 19-09-2019 | 16-10-2019 | 16-10-2019 | 16-10-2019 | 03:30 PM | Active | और देखें |
| 29. | Ridgid Pipe Wrench (PUR/MOIL/C-1/226/E-45 dt. 19/09/2019) | 19-09-2019 | 16-10-2019 | 16-10-2019 | 16-10-2019 | 3:30 PM | Active | और देखें |
| 30. | Ridgid Pipe Wrench(PUR/MOIL/C-1/226/E-45 dt. 19/09/2019) | 19-09-2019 | 11-10-2019 | 11-10-2019 | 11-10-2019 | 03:30 PM | Active | और देखें |
| 31. | Tarpaulins(PUR/MOIL/C-1/210/E-43 dt. 18/09/2019) | 18-09-2019 | 09-10-2019 | 09-10-2019 | 09-10-2019 | 03:30 PM | Active | और देखें |
| 32. | Repairing of Grouser Shoe for BEML Dozer BD155- No.2 operating at Dongri Buzurg Mine.(DB/MECH/19-20/JGM(MECH)/309) | 17-09-2019 | 03-10-2019 | 03-10-2019 | 03-10-2019 | 04:30 PM | Active | और देखें |
| 33. | Purchase of Transformers Various Types - 7 Nos.(7 Lots.) (Only Through e-procurement)( WE-61(ET-247) DT.17/09/2019) | 17-09-2019 | 09-10-2019 | 09-10-2019 | 10-10-2019 | 03:30 PM | Active | और देखें |
| 34. | Strengthning of foundation of 132 KW motor of pump house near slime pond of Crushing and screening plant at Balaghat Mine(Civil/BGT/LT/2019-20/616) | 16-09-2019 | 30-09-2019 | 30-09-2019 | 30-09-2019 | 04:30 PM | Active | और देखें |
| 35. | Cleaning of surplus underground ROM at Kandri Mine.(MOIL/KD/2019-20/MINING/2040 Date 14.09.2019) | 14-09-2019 | 21-09-2019 | 21-09-2019 | 21-09-2019 | 04:30 PM | Active | और देखें |
| 36. | Tea Snacks and lunch for technical program to be conducted at Munsar Training Center for the year 2019-20(MUN/Per/NIT/2019-20/VTC/119 Date 14.09.19) | 14-09-2019 | 24-09-2019 | 24-09-2019 | 24-09-2019 | 04:30 PM | Active | और देखें |
| 37. | CLEANING OF SPILLAGE ORE AND FINES FROM VARIOUS PLACES OF IMB PLANT AT DONGRI BUZURG MINE (DB/MECH/IMB/19-20 /306 ) | 14-09-2019 | 04-10-2019 | 04-10-2019 | 04-10-2019 | 4:30 PM | Active | और देखें |
| 38. | Procurement of lugs glands and ferruls (BGT/ELECT/19-20/562) | 11-09-2019 | 17-09-2019 | 17-09-2019 | 17-09-2019 | 4:30 PM | Active | और देखें |
| 39. | Dismantling of male ward female ward canteen of mine hospital and dismantling of old A type quarters(4 blocks) near play ground at Chikla mine(TE 181 CIVIL) | 11-09-2019 | 25-09-2019 | 25-09-2019 | 25-09-2019 | 3:30 PM | Active | और देखें |
| 40. | Purchase of Electrical HT/LT Cables (Assorted Size) for various Mines (WE62 DT.10.09.2019 (e-Tender no.MOIL/19-20/ET/249)) | 10-09-2019 | 03-10-2019 | 04-10-2019 | 04-10-2019 | 3:30 PM | Active | और देखें |
| 41. | Blanket Rate Contract for one Year for supply of various types of Paints, Thinner etc (WE-42 DT.10.09.2019(e-TENDER NO. MOIL/19-20/ET/248) | 10-09-2019 | 03-10-2019 | 04-10-2019 | 04-10-2019 | 3:30 PM | Active | और देखें |
| 42. | Providing and laying of Paver blocks in Administrative Building premises at Kandri Mine (KAN/CIVIL/NIT/19-20/1954 Date 07.09.2019) | 09-09-2019 | 17-09-2019 | 17-09-2019 | 17-09-2019 | 4:30 PM | Active | और देखें |
| 43. | Cleaning, maintenance, watch and ward and operation pump of Sewage treatment plant Kandri Mine. (KAN/CIVIL/NIT/19-20/1968 Date 08.09.2019) | 09-09-2019 | 18-09-2019 | 18-09-2019 | 18-09-2019 | 4:30 PM | Active | और देखें |
| 44. | Development Works for developing site and approach road for upcoming Guest House, Munsar Mine(MUN/CIVIL/NIT/19-20/111 Date 07/09/2019) | 07-09-2019 | 14-09-2019 | 14-09-2019 | 14-09-2019 | 04:30 PM | Active | और देखें |
| 45. | Providing and fixing Paver blocks in front of officers B and C type quarters at Munsar Mine.(MUN/CIVIL/NIT/19-20/112 DT 07.09.2019) | 07-09-2019 | 14-09-2019 | 14-09-2019 | 14-09-2019 | 04:30 PM | Active | और देखें |
| 46. | Development of approach road at Parsoda Mine.(PARSODA/CIVIL/NIT/19-20/109 DT 06.09.2019) | 06-09-2019 | 14-09-2019 | 14-09-2019 | 14-09-2019 | 04:30 PM | Active | और देखें |
| 47. | GARDEN MAINTENANCE OF CHILDDREN PARK, MINE HOSPITAL, ADMINISTRATIVE BUILDING, MM BUNGALOW AT MUNSAR MINE(MUN/CIVIL/NIT/18-19/108 DT 06.09.2019) | 06-09-2019 | 14-09-2019 | 14-09-2019 | 14-09-2019 | 04:30 PM | Active | और देखें |
| 48. | LAYING OF PAVER BLOCKS FOR COMMEN AREA BETWEEN A TYPE QTRS OF WAHITOLA NEAR OFFICERS COLONY AT MUNSAR MINE.(MUN/CIVIL/NIT/19-20/105 DT 06.09.2019) | 06-09-2019 | 14-09-2019 | 14-09-2019 | 14-09-2019 | 04:30 PM | Active | और देखें |
| 49. | Recovery of Cleaned Ore from open cast ROM at Parsoda Mine(Agent JTGM/Mining/PS/NIT/19-20/106 Dt 06.09.19) | 06-09-2019 | 16-09-2019 | 16-09-2019 | 16-09-2019 | 04:30 PM | Active | और देखें |
| 50. | Tub Wheel and Axle Assembly(PUR/MOIL/C-12/6/WE-55/ET/245) | 03-09-2019 | 25-09-2019 | 25-09-2019 | 26-09-2019 | 03:30 PM | Active | और देखें |
| 51. | Purchase of DGMS approved LED based Miner Safely Cap Lamp Assembly Complete with all accessories and Metal Frame Charging Rack complete with Charger(WE56 DT.28.08.2019 (e-Tender no.MOIL/19-20/ET/244)) | 03-09-2019 | 25-09-2019 | 25-09-2019 | 26-09-2019 | 03:30 PM | Active | और देखें |
| 52. | Reduction of Manganese Ore on Conversion basis for EMD Plant, Dongri Buzurg Mine(MOIL/19-20/ET/231) | 31-08-2019 | 30-09-2019 | 30-09-2019 | 30-09-2019 | 03:30 PM | Active | और देखें |
| 53. | Picking and collection of Ferro grade and LGHS ore from Sidha Baba Mandir Dump at Tirodi Mine(MOIL/19-20/ET/241) | 30-08-2019 | 30-09-2019 | 30-09-2019 | 30-09-2019 | 03:30 PM | Active | और देखें |
| 54. | Sampling of manganese ore for output production and dispatch railing for all the mines of MOIL Ltd(MOIL/19-20/ET/242) | 30-08-2019 | 30-09-2019 | 30-09-2019 | 30-09-2019 | 03:30 PM | Active | और देखें |
| 55. | Providing Backup Internet Connectivity at Nagpur Office(MOIL/19-20/ET/240) | 30-08-2019 | 30-09-2019 | 30-09-2019 | 30-09-2019 | 03:30 PM | Active | और देखें |
| 56. | Supply, installation, commissioning of OFC wired (Armored) LAN connectivity to Weigh Bridge, Mine Stores Magazine from Admin building at Ukwa Mine(BG/SYSTEM/NETWORK/2019-20/560) | 29-08-2019 | 09-09-2019 | 09-09-2019 | 09-09-2019 | 04:00 PM | Active | और देखें |
| 57. | Transporting of one no. TATA Hitachi make excavator from Dongri Buzurg Mine to Tirodi Mine through Truck Trailer.(DB/MECH/19-20/ 231) | 29-08-2019 | 17-09-2019 | 17-09-2019 | 17-09-2019 | 04:30 PM | Active | और देखें |
| 58. | TENDER DOCUMENTS FOR LAYING OF 3C X 120SQMM, 11KV XLPE CABLE FROM MAIN VERTICAL SHAFT SUBSTATION TO 3RD LEVEL UNDERGROUND FOR FEEDING POWER SUPPLY TO 3RD LEVEL UNDERGROUND SUBSTATION AT MUNSAR MINE(ELECT/MUN/ADGM/19-20/565) | 28-08-2019 | 06-09-2019 | 06-09-2019 | 06-09-2019 | 04:00 PM | Active | और देखें |
| 59. | Drilling of holes for cable bolting and grouting operation at Kandri Mine(MOIL/19-20/ET/230) | 28-08-2019 | 27-09-2019 | 27-09-2019 | 27-09-2019 | 03:00 PM | Active | और देखें |
| 60. | Removal of accumulated pebbles near sand stowing plants at Chikla Mine(MOIL/19-20/ET/228) | 28-08-2019 | 27-09-2019 | 27-09-2019 | 27-09-2019 | 03:30 PM | Active | और देखें |
| 61. | Muffling for blasting at 5 No. and 6 No. pit at Sitapatore Mine(MOIL/19-20/ET/229) | 28-08-2019 | 27-09-2019 | 27-09-2019 | 27-09-2019 | 03:30 PM | Active | और देखें |
| 62. | Cleaning of surplus underground ROM at Kandri Mine(MOIL/19-20/ET/227) | 28-08-2019 | 27-09-2019 | 27-09-2019 | 27-09-2019 | 03:30 PM | Active | और देखें |
| 63. | Purchase of High Head Slurry Dewatering Pump for Dongri Buzurg Mine(M.S) - 1 No.(2 Lots) (Only Through e-procurement(WE-58(ET-243) DT.27.08.2019) | 27-08-2019 | 19-09-2019 | 19-09-2019 | 20-09-2019 | 03:30 PM | Active | और देखें |
| 64. | Purchase of High Head Slurry Dewatering Pump for Dongri Buzurg Mine(M.S) - 1 No.(2 Lots) (Only Through e-procurement(WE-58(ET-243) DT.27.08.2019) | 27-08-2019 | 24-09-2019 | 24-09-2019 | 25-09-2019 | 03:30 PM | Active | और देखें |
| 65. | Supply of Welding Electrodes As per Annex C(T.E.No.PUR/DB/19-20/180) | 26-08-2019 | 25-09-2019 | 25-09-2019 | 25-09-2019 | 04:30 PM | Active | और देखें |
| 66. | Secondary recovery of UKL -471 20 percent from F W dump from Ch.4300 to Ch.6800 at Ukwa Mine(MOIL/19-20/ET/225) | 26-08-2019 | 26-09-2019 | 26-09-2019 | 26-09-2019 | 03:30 PM | Active | और देखें |
| 67. | Hiring of machinery for sub grade mineral reject from Underground handling from magazine area at Kandri Mine(MOIL/19-20/ET/224) | 26-08-2019 | 26-09-2019 | 26-09-2019 | 26-09-2019 | 03:30 PM | Active | और देखें |
| 68. | Hiring of machinery for loading unloading and transportation of Hutch from Hutch settling pond and hutch drain at Balaghat Mine(MOIL/19-20/ET/226) | 26-08-2019 | 26-09-2019 | 26-09-2019 | 26-09-2019 | 03:30 PM | Active | और देखें |
| 69. | Transportation of bottom ash from Adani power plant tiroda to Balaghat Mine(BGT/Minin/LT/2019-20/539 A) | 23-08-2019 | 02-09-2019 | 02-09-2019 | 02-09-2019 | 04:30 PM | Active | और देखें |
| 70. | Renovation of IMB plant office and toilet at D.B. Mine(DB/C/HO/19-20/1704 Dt 20/08/2019) | 23-08-2019 | 10-09-2019 | 10-09-2019 | 10-09-2019 | 04:30 PM | Active | और देखें |
| 71. | Renovation of old toilet of EMD plant office at Dongri Buzurg Mine.(DB/C/HO/19-20/1705 Dt 20/08/2019) | 23-08-2019 | 10-09-2019 | 10-09-2019 | 10-09-2019 | 04:30 PM | Active | और देखें |
| 72. | Purchase of High quality Electrical Insulating Transformer Oil - 5880 Litres.(2 Lots.)(Only Through e-procurement)(WE-60(ET-232) DT.22/08/2019) | 22-08-2019 | 16-09-2019 | 16-09-2019 | 17-09-2019 | 03:30 PM | Active | और देखें |
| 73. | PURCHASE OF FASTNERS WIRE NAIL AND ROSE NAILS(PUR/MOIL/BGT/FASTNER/19-20/536) | 22-08-2019 | 18-09-2019 | 18-09-2019 | 18-09-2019 | 04:30 PM | Active | और देखें |
| 74. | PURCHASE OF G I PIPE FITTINGS(PUR/MOIL/BGT/PIPE FITTINGS/19-20/537) | 22-08-2019 | 18-09-2019 | 18-09-2019 | 18-09-2019 | 04:30 PM | Active | और देखें |
| 75. | Providing and laying Hume pipe from sand stowing plant for collection of pebbles at lower level bench, Kandri Mine(MOIL/19-20/ET/215) | 22-08-2019 | 20-09-2019 | 20-09-2019 | 20-09-2019 | 03:30 PM | Active | और देखें |
| 76. | Tea, Snacks and Lunch for Technical Programs to be conducted at Munsar Training Centre for the year 2019-20(MUN/Civil/NIT/2019-20/VTC/93 Date 10.08.2019) | 19-08-2019 | 21-08-2019 | 21-08-2019 | 21-08-2019 | 04:30 PM | Active | और देखें |
| 77. | Removal of Spillage material accumulated in 16.5 level at Balaghat Min(Mining/LT/2019-20/64) | 12-08-2019 | 21-08-2019 | 21-08-2019 | 21-08-2019 | 04:30 PM | Active | और देखें |
| 78. | Repairs to roof of camp quarters at Balaghat Mine(Civil/BGT/LT/2019-20/492) | 12-08-2019 | 26-08-2019 | 26-08-2019 | 26-08-2019 | 04:30 PM | Active | और देखें |
| 79. | Retaining wall for Installation of new pump shed foundation for 170 150HP pump North section Tirodi(TRD/CIVIL/19-20/1103 DATED 03.08.2019) | 11-08-2019 | 20-08-2019 | 20-08-2019 | 20-08-2019 | 03:30 PM | Active | और देखें |
| 80. | Proposal of outsourcing of repairs and maintenace of auto electrical work.(TRD/Elect/19-20/1059 Date 01/08/2019) | 11-08-2019 | 20-08-2019 | 20-08-2019 | 20-08-2019 | 03:30 PM | Active | और देखें |
| 81. | Removal of garbage cleaning of septic tankDrain at Camp area at Tirodi Mine(TRD/CIVIL/19-20/1074A DATED 03.08.2019) | 11-08-2019 | 20-08-2019 | 20-08-2019 | 20-08-2019 | 03:30 PM | Active | और देखें |
| 82. | Major repairing of Terex Loader at Munsar Mine(A-III/MUN/19-20/1516) | 10-08-2019 | 19-08-2019 | 19-08-2019 | 19-08-2019 | 04:00 PM | Active | और देखें |
| 83. | Procurement Of Float Gear Box With Motor For 400mm Conveyor Belt For Chikla Mine(TE-05 DT.10082019) | 10-08-2019 | 26-08-2019 | 26-08-2019 | 26-08-2019 | 04:30 PM | Active | और देखें |
| 84. | Lowering of HT XLPE copper cable from Production shaft surface inset to 13.5Level at Balaghat Mine(BGT/ELECT/19-20/470) | 09-08-2019 | 26-08-2019 | 26-08-2019 | 26-08-2019 | 04:30 PM | Active | और देखें |
| 85. | Water proofing to service magazine building at Balaghat Mine(Civil/BGT/LT/2019-20/2390) | 08-08-2019 | 20-08-2019 | 20-08-2019 | 20-08-2019 | 04:30 PM | Active | और देखें |
| 86. | Repairing of Lead Cathodes Plates at EMD Plant Dongri Buzurg Mine(MOIL/EMD/DB/Jt.GM/2019-20/214) | 07-08-2019 | 20-08-2019 | 20-08-2019 | 21-08-2019 | 10;30 AM | Active | और देखें |
| 87. | Purchase of Organic Waste Converter Machine Along with Shredder and Weiging Machines with Annual Maintenance Contact - 10 Nos.(2 Lots) (Only Through e-procurement)(WE-48(ET-222) DT.06/08/2019) | 06-08-2019 | 28-08-2019 | 28-08-2019 | 29-08-2019 | 03:30 PM | Active | और देखें |
| 88. | Purchase of Special bearing Grease, Multipurpose usage, MOSIL Make BRB-100 or equivalent - 900 Kgs.(2 Lots) (Only Through e-procurement)(WE-54(ET-223) DT.06/08/2019) | 06-08-2019 | 28-08-2019 | 28-08-2019 | 29-08-2019 | 03:30 PM | Active | और देखें |
| 89. | Purchase of D.G.Set in The Range of 1250KVA To 1500KVA, 11KV with Erection and Commissioning for Chikla Mine(M.S) - 1 No.(2 Lots) and D.G.Set Rated 1000KVA, 11 KV with Erection and Commissioning for Dongri Buzurg Mine(M.S) - 1 No.(2 Lots)(WE-47(ET-221) DT | 06-08-2019 | 03-09-2019 | 03-09-2019 | 04-09-2019 | 03:30 PM | Active | और देखें |
| 90. | Confining the openings of B and C-Type Quarters of Officers Colony by providing MS grills, Munsar Mine.(Munsar/Civil/2019-20/82 Date 03.08.2019) | 05-08-2019 | 13-08-2019 | 13-08-2019 | 13-08-2019 | 04:30 PM | Active | और देखें |
| 91. | Construction of Shed for Jigging near Canteen Building at Munsar Mine.(Munsar/Civil/2019-20/79 Date 31.07.2019) | 05-08-2019 | 10-08-2019 | 10-08-2019 | 10-08-2019 | 04:30 PM | Active | और देखें |
| 92. | Development of approach road to Parsoda Mine.(Parsoda/Civil/NIT/19-20/86 Date 03.08.2019) | 05-08-2019 | 13-08-2019 | 13-08-2019 | 13-08-2019 | 04:30 PM | Active | और देखें |
| 93. | Making and Supplying of stemming material mud plug used to Blasting /fragment in underground at various working level at Balaghat Mine(BGT/Mining/LT/2019-20/50) | 05-08-2019 | 13-08-2019 | 13-08-2019 | 13-08-2019 | 04:30 PM | Active | और देखें |
| 94. | Construction of New generator house at North 6 No section at Tirodi Mine( MOIL/19-20/ET/184) | 05-08-2019 | 23-08-2019 | 23-08-2019 | 23-08-2019 | 03:30 PM | Active | और देखें |
| 95. | Procurement of HDPE Pipe 140 MM At Dongri Buzurg Mine.(PUR/DB/19-20/130) | 05-08-2019 | 20-08-2019 | 20-08-2019 | 20-08-2019 | 04:30 PM | Active | और देखें |
| 96. | Installation of centralised control for compressed air distribution system by installation of motorised valves and control panel at Balaghat Mine(MOIL/19-20/ET/216) | 02-08-2019 | 02-09-2019 | 02-09-2019 | 02-09-2019 | 03:30 PM | Active | और देखें |
| 97. | Request for Empanelment For Empanelment of Consultant/ Transaction Advisor For Due Diligence and advise on Transaction of Targets Assets( MOIL/RFE/CTA/2019-20) | 02-08-2019 | 06-09-2019 | 06-09-2019 | 07-09-2019 | 11:00 AM | Active | और देखें |
| 98. | Loading and unloading of steel section and various materials with stacking at Dongri Buzurg Mine(MOIL/19-20/ET/211) | 02-08-2019 | 03-09-2019 | 03-09-2019 | 03-09-2019 | 03:30 PM | Active | और देखें |
| 99. | Cleaning of excess ROM at Beldongri Mine(MOIL/19-20/ET/209) | 02-08-2019 | 03-09-2019 | 03-09-2019 | 03-09-2019 | 03:30 PM | Active | और देखें |
| 100. | Picking and collection of material DBL-456 25 percent and DBL-563 20 percent Mn from contaminated low grade at Dongri Buzurg Mine North West side part-5(MOIL/19-20/ET/213) | 02-08-2019 | 03-09-2019 | 03-09-2019 | 03-09-2019 | 03:30 PM | Active | और देखें |
| निविदाएं अधिक जानकारी |
|---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.5.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
| (2027) वर्ष के निविदाएं देखें |
| (2025) वर्ष के निविदाएं देखें |
| (2024) वर्ष के निविदाएं देखें |
| (2023) वर्ष के निविदाएं देखें |
| (2022) वर्ष के निविदाएं देखें |
| (2021) वर्ष के निविदाएं देखें |
| (2020) वर्ष के निविदाएं देखें |
| (2019) वर्ष के निविदाएं देखें |
| (2018) वर्ष के निविदाएं देखें |
| (2017) वर्ष के निविदाएं देखें |
| (2016) वर्ष के निविदाएं देखें |
| (2015) वर्ष के निविदाएं देखें |
| (2014) वर्ष के निविदाएं देखें |
| (2013) वर्ष के निविदाएं देखें |
| (2012) वर्ष के निविदाएं देखें |
| (24) वर्ष के निविदाएं देखें |
| पूर्ण निविदा पुरालेख देखें |
| सभी मॉयल निविदाएं देखें |