निविदा संग्रह

निविदाएं संग्रह

खोज के लिए शीर्षक निविदा जारी करने की तिथि निविदा जारी करने की अंतिम तिथि
क्रमांक शीर्षक अंक प्रारंभ दिनांक अंक अंतिम तिथी प्रस्तुत करने की अंतिम तिथि खुलने की तिथि खुलने का समय स्थिति और देखें
1. Construction of Cement concrete road, drain network and retaining wall from Mine Hospital to Pit office, screening plant and siding at Kandri Mine.(MOIL/21-22/ET/92) 03-12-2021 23-12-2021 23-12-2021 23-12-2021 03:30 PM Active और देखें
2. Construction of Industrial shed (PEB structure) at Bed Debries Cleaning (BDC) floor North and South section Tirodi Mone 2 No and at Sitapatore Mine 4 No(MOIL/21-22/ET/91) 03-12-2021 23-12-2021 23-12-2021 23-12-2021 03:30 PM Active और देखें
3. PURCHASE OF SPARES FOR 36KV, 1250A, EDF-SK1-l SF6 HT BREAKERS, MAKE MS ABB LTD. AT FERRO MANGANESE PLANT, BALAGHAT MINE M.P.(PUR/MOIL/C-3/13/E-63/167-M DT.03/12/2021) 03-12-2021 13-12-2021 13-12-2021 13-12-2021 03:30 PM Active और देखें
4. Purchase ESE Type Lighting Arrestor for kandri mine.(PUR/KD/ELECT/21-22/2966) 01-12-2021 15-12-2021 15-12-2021 15-12-2021 04:30 PM Active और देखें
5. REPAIR OF AIR END OF KIRLOSKAR COMPRESOR OF BELDONGRI MINE AS PER SCOPE OF WORK(BL/MECH/21-22/2042) 01-12-2021 10-12-2021 10-12-2021 10-12-2021 04:30 PM Active और देखें
6. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER.(PUR/MOIL/C-5/30/E- 62 /164 -M Dt. 01/12/2021) 01-12-2021 22-12-2021 22-12-2021 22-12-2021 05:30 PM Active और देखें
7. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-5/28 /E- 61/162-M Dt. 30/11/2021) 30-11-2021 22-12-2021 22-12-2021 22-12-2021 03:30 PM Active और देखें
8. PURCHASE OF M.S. PIPES AND M.S. FLANGES FOR BALAGHAT MINE(PUR/MOIL/BGT/IMB/21-22/1105) 29-11-2021 17-12-2021 17-12-2021 17-12-2021 04:30 PM Active और देखें
9. Designing Supply Installation and Commissioning of Automatic Fire Detection and Suppression System in EIMCO ELECON Loader(AGENT and JGM/MINES/GRIII/1314) 29-11-2021 15-12-2021 15-12-2021 15-12-2021 04:30 PM Active और देखें
10. Construction of Engineered revetment structure at area of river bank adjacent to high speed shaft location at Gumgaon Mine.(MOIL/21-22/ET/ 84) 29-11-2021 20-12-2021 20-12-2021 20-12-2021 03:30 PM Active और देखें
11. Construction of new leaching vessel foundation at EMD plant , Dongri Buzurg Mine.(MOIL/21-22/ET/87) 29-11-2021 20-12-2021 20-12-2021 20-12-2021 03:30 PM Active और देखें
12. Construction of Cement concrete platform at Railway siding at Tirodi Mine(MOIL/21-22/ET/86) 29-11-2021 23-12-2021 23-12-2021 23-12-2021 03:30 PM Active और देखें
13. Providing and installation of portable cabin for pit office for open cast at Dongri Buzurg Mine(MOIL/21-22/ET/85) 29-11-2021 20-12-2021 20-12-2021 20-12-2021 03:30 PM Active और देखें
14. Providing 10 mbps 1 is to 1 Internet Leased Line at Gumgaon Mine(AJGM/Group-III/SYS/NW/ 2021-22/1311) 29-11-2021 06-12-2021 06-12-2021 06-12-2021 03:30 PM Active और देखें
15. TENDER DOCUMENT FOR OUTSOURCING OF MAINTENANCE, DISTRIBUTION AND COLLECTION OF CAPLAMP FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/1099) 27-11-2021 30-11-2021 30-11-2021 30-11-2021 03:30 PM Active और देखें
16. PURCHASE OF SUCTION END CASING- 2NOS. OF 240HP KIRLOSKAR MAKE CENTRIFUGAL PUMP. MODEL-RKB-125/3OK, 8STG 240 HP PUMP AT BALAGHAT MINE(PUR/MOIL/BGT/PUMP/21-22/1100) 27-11-2021 06-12-2021 06-12-2021 06-12-2021 04:30 PM Active और देखें
17. PURCHASE OF CS WHEEL ASSEMBLY WITH COVER FOR 4 MT GB CAR IN UNDERGROUND AT BALAGHAT MINE(UR/MOIL/BGT/GB CAR/21-22/1098) 27-11-2021 03-12-2021 03-12-2021 03-12-2021 04:30 PM Active और देखें
18. Purchase of Black gitti for UG concreting at Kandri Mine(KAN/MINES/NIT/21-22/2654 dt. 26.11.2021) 26-11-2021 03-12-2021 03-12-2021 03-12-2021 04:30 PM Active और देखें
19. Laying of 6 and 4 G.I Pipe Lines for Compressed Air supply in underground levels at Balaghat Mine.(AGT/BGT/MECH/PIPE/21-22/1079) 23-11-2021 13-12-2021 13-12-2021 13-12-2021 04:30 PM Active और देखें
20. Interior Renovation work for Gents Toilet in Main Administrative Building of Dongri Buzurg Mine.(DB/Civil/2021-22/2560 Date 22.11.2021) 23-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active और देखें
21. Widening of Entrance Gate including fixing of structural steel gate, concreting work and speed breakers for workshop premises at Dongri Buzurg Mine(DB/Civil/2021-22/2561 Date 22.11.2021) 23-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active और देखें
22. Construction of walkway platform for Railway Weigh Bridge including chain link fencing all around the building at Dongri Buzurg Mine.(DB/Civil/2021-22/2562 Date 22.11.2021) 23-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active और देखें
23. Minor repair works comprising of replacement of old worn out and damaged windows with three track aluminium sliding windows for C-Type quarters at Dongri Buzurg Mine.(DB/Civil/2021-22/2563 Date 22.11.2021) 23-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active और देखें
24. Development and beautification of garden at New Medical Administrative building at Chikla Mine(CIVIL/CH/T.E./21-22/2811) 20-11-2021 06-12-2021 06-12-2021 06-12-2021 04:30 PM Active और देखें
25. WEBSITE SINGLE/ PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR OVIS MAKES - 4 AND 3 TON BATTERYD/DIESEL OPERATED LOCOMOTIVES.(PUR/MOIL/C-5/44/E- 60/155 -M Dt.20/11/2021) 20-11-2021 13-12-2021 13-12-2021 13-12-2021 03:30 PM Active और देखें
26. Cleaning of Workshop premises of Dongri Buzurg Mine.(DB/MECH/20-21/AGENT/1159) 19-11-2021 27-11-2021 27-11-2021 27-11-2021 04:30 PM Active और देखें
27. Fabrication of Guide Rollers for Tub Tipplers at Chikla Mine.(TE/CH/MECH/21-22/19065/1146) 19-11-2021 24-11-2021 24-11-2021 24-11-2021 03:30 PM Active और देखें
28. EXPRESSION OF INTEREST FOR THE TRANSFER OF TECHNOLOGY FOR PRODUCTION OF ELECTROLYTIC MANGANESE METAL (EMM) AND/ OR DESIGN AND CONSTRUCTION OF A NEW ELECTROLYTIC MANGANESE METAL (EMM) PLANT(SMG/EMM-EOI/21-22/01) 18-11-2021 18-01-2022 18-01-2022 18-01-2022 03:30 PM Active और देखें
29. Purchase of PEARL COKE with Transportation - 6600 MT(MOIL/21-22/ET-83 dt.17.11.2021) 17-11-2021 07-12-2021 07-12-2021 08-12-2021 03:30 PM Active और देखें
30. OUTSOURCING FOR MONITORING AND OPERATION OF 33KV SUBSTATION FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/1047) 16-11-2021 18-11-2021 18-11-2021 18-11-2021 03:30 PM Active और देखें
31. Providing and Supplying of Drive Sinamics G120 55KW Heavy Duty Power Module As per Annexure A(PUR/MOIL/2021-22/1890) 16-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active और देखें
32. Fabrication of Hose Fittings required in Underground at Balaghat Mine.(AGT/BGT/MECH/HO-FIT/21-22/1042) 15-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active और देखें
33. Cleaning of accumulated sand from UG50L and UG150L at Kandri Mine.(KD/MINES/NIT/2021-22/2520) 11-11-2021 22-11-2021 22-11-2021 22-11-2021 04:30 PM Active और देखें
34. Purchase of Black Gitti for U/G concreting at Kandri Mine(KD/MINES/NIT/2021-22/2482) 10-11-2021 19-11-2021 19-11-2021 19-11-2021 04:30 PM Active और देखें
35. Repairing of Worn Our Wheels 50nos.and Axle Shaft 30nos of GB Car Deployed in Underground Levels of Balaghat Mine.(AGT/BGT/MECH/GB-CAR/21-22/1032) 10-11-2021 18-11-2021 18-11-2021 18-11-2021 04:30 PM Active और देखें
36. Fabrication of Hydraulic Power Pack with Intercooler Assy. for Secondary Brake/ Thruster Brake at Holmes Shaft Cage winder-350 HP. of Balaghat Mine.(AGT/BGT/MECH/WINDER/21-22/1031) 10-11-2021 15-11-2021 15-11-2021 15-11-2021 04:30 PM Active और देखें
37. TENDER DOCUMENTS FOR INSTALLATION AND COMMISSIONING OF 11KV HT VCB PANEL 6TH LEVEL SURFACE SUBSTATION AT BALAGHAT MINE.(BGT/TE/ELECT/AJGM/21-22/1025) 09-11-2021 15-11-2021 15-11-2021 15-11-2021 03:30 PM Active और देखें
38. PURCHASE ESE LIGHTING ARRESTOR FOR KANDRI MINE(PUR/KD/ELECT/21-22/ 2451) 08-11-2021 17-11-2021 17-11-2021 17-11-2021 04:30 PM Active और देखें
39. Repairing of Centre Joint Assy of Tata Hitachi 1200 Hydraulic Excavator operating at Dongri Buzurg Mine Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1102) 04-11-2021 16-11-2021 16-11-2021 16-11-2021 04:30 PM Active और देखें
40. Repairing of Bucket Cylinder of Tata 450-1 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1101) 04-11-2021 16-11-2021 16-11-2021 16-11-2021 04:30 PM Active और देखें
41. Development, Beautification and Horticulture works towards landscaping works for new Medical Administrative Building at Dongri Buzurg Mine.(DB/CIVIL/21-22/2366 Date 02.11.2021) 04-11-2021 12-11-2021 12-11-2021 12-11-2021 04:30 PM Active और देखें
42. Cutting and cleaning of grass, shrubs Bushes from Residential Premises in Officers Colony, Syndicate Camp and Chandmara Colony at Dongri Buzurg Mine.(DB/CIVIL/21-22/2368 Date 02.11.2021) 04-11-2021 12-11-2021 12-11-2021 12-11-2021 04:30 PM Active और देखें
43. Carpentry Works, Repair to Furniture, Construction of Runner and Glass works for Mine Managers Cabin at Dongri Buzurg Mine(DB/CIVIL/21-22/2367 Dated 02.11.2021) 04-11-2021 12-11-2021 12-11-2021 16-11-2021 04:30 PM Active और देखें
44. 15 NOS CHEMICAL EARTH PIT FOR DIFFERENT SURFACE SUBSTATION AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/994) 01-11-2021 08-11-2021 08-11-2021 08-12-2021 03:30 PM Active और देखें
45. Major Repair of Gear Boxes of Ashok Leyland Tippers MP50-H-1266 and MP-50-H-1267 Operating at Balaghat Mine.(AGENT/BGT/MECH/TIPP/21-22/1007) 30-10-2021 08-11-2021 08-11-2021 08-11-2021 04:30 PM Active और देखें
46. PURCHASE OF TOP AND BOTTOM ASSEMBLY 2Nos FOR DSM80 by 36 KIRLOSKAR MAKE 60HP PUMP FOR IMB PLANT AT DONGRI BUZURG MINE(DB/MECH/21-22/MECH/1093) 30-10-2021 17-11-2021 17-11-2021 17-11-2021 04:30 PM Active और देखें
47. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MAXFLOW PUMP.(PUR/MOIL/C-5/28 /E-59 /142-M Dt.30/10/2021) 30-10-2021 19-11-2021 19-11-2021 19-11-2021 03:30 PM Active और देखें
48. Designing Supply Installation and Commissioning of Automatic Fire Detection and Suppression System in EIMCO ELECON Loader(AGENT and JGM/MINES/GRIII/1161) 29-10-2021 10-11-2021 10-11-2021 15-11-2021 04:30 PM Active और देखें
49. Annual service maintenance contract for winder system installed at various mines for a period of two years.(MOIL/21-22/ET/79) 27-10-2021 26-11-2021 26-11-2021 26-11-2021 03:30 PM Active और देखें
50. Supply of black Metal(Gitti) for Undergroung concreting work at munsar mine(Mun/Min/NIT/2021-22/1134) 27-10-2021 02-11-2021 02-11-2021 02-11-2021 04:30 PM Active और देखें
51. Transportation Unloading of ROM Rock Tubs from Vertical Shaft to OCF Return of empty tubs to UG at Beldongri Mine(BEL/MIN/2021-22/1726) 25-10-2021 01-11-2021 01-11-2021 01-11-2021 04:30 PM Active और देखें
52. Construction of parking shed at BDC OCF and Administrative building premises at Gumgaon Mine(MOIL/21-22/ET/74) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active और देखें
53. Construction of boundry wall around Mine lease area at Tirodi and Sitapatore Mines(MOIL/21-22/ET/76) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active और देखें
54. Construction of boundry wall Retaining wall and Drain near Ferro Manganese plant Office at Balaghat Mine(MOIL/21-22/ET/78) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active और देखें
55. Construction of Pit office beside Vertical Shaft at Kandri Mines(MOIL/21-22/ET/80) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active और देखें
56. Construction of 100000 Liters Capacity Circular Ground Service Reservoir near Sand Stowing Plant at Ukwa Mine(MOIL/21-22/ET/81) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active और देखें
57. Construction of shed to preserve core boxes at Pani Mines GMDC Ltd Manganese project District Chhota Udepur of Gujrat State(MOIL/21-22/ET/75) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active और देखें
58. Painting of various structures of Winding Engine Installations , Waste Rock bunker and spillage bunker(AGENT/BGT/MECH/WIN/21-22/2915) 22-10-2021 11-11-2021 11-11-2021 11-11-2021 04:30 PM Active और देखें
59. PURCHASE OF COMPLETE WHEEL AND AXLE ASSEMBLY WITH BEARING AND COVER FOR 4 MT GB CAR IN UNDERGROUND AT BALAGHAT MINE.(PUR/MOIL/BGT/GB CAR/21-22/972) 21-10-2021 25-10-2021 25-10-2021 25-10-2021 04:30 PM Active और देखें
60. Purchase of Hose Fittings for Rock Drill and Air Leg Machines(MOIL/21-22/ET-82,Dt.21/10/2021) 21-10-2021 11-11-2021 11-11-2021 12-11-2021 03:30 PM Active और देखें
61. PURCHASE OF SPARES FOR ATLAS COPCO MAKE COMPRESSOR.(PUR/MOIL/C-5/40 /E-58 / 138-M Dt.20/10/2021) 20-10-2021 09-11-2021 09-11-2021 10-11-2021 03:30 PM Active और देखें
62. PURCHASE OF HIGH PRESSURE MULTISTAGE WATER PUMP KSB MAKE QTY 2 NOS MOVI 32/6(MOIL/EMD/CH/AJGM/21-22/1013) 19-10-2021 09-11-2021 09-11-2021 09-11-2021 04:30 PM Active और देखें
63. PURCHASE OF SOLID TYRE 10.00 X 20-4nos., MAKE TRIDENT BRAND-TRAXTER SUITABLE FOR LHD (Loader) MACHINE IN UNDREGROUND OF BALAGHAT MINE(PUR/MOIL/BGT/Sol-Tyr/21-22/960) 18-10-2021 25-10-2021 25-10-2021 25-10-2021 04:30 PM Active और देखें
64. PURCHASE OF SPARES FOR SIEMENS MAKE PLC PANEL OF WINDER FOR GUMGAON MINE (M.S).(PUR/MOIL/C-3/13/E-57/136-M Dt.18/10/2021) 18-10-2021 03-11-2021 03-11-2021 03-11-2021 03:30 PM Active और देखें
65. Interior Renovation for Toilet adjacent to Conference Hall at Main Administrative Building of Dongribuzurg Mine(DB/CIVIl/2021-22/ Dated 15.10.2021) 16-10-2021 22-10-2021 22-10-2021 22-10-2021 04:30 PM Active और देखें
66. PURCHASE OF SPARES FOR SULLAIR COMPRESSOR.(PUR/MOIL/C-5/73 /E- 56 / 132 -M ,Dt.16/10/2021) 16-10-2021 06-11-2021 06-11-2021 08-11-2021 03:30 PM Active और देखें
67. Purchase of Site Mixed Emulsion (SME).(WE-9 Dt 16.10.2021(e-Tender NO.MOIL/21-22/ET/77)) 16-10-2021 25-10-2021 25-10-2021 26-10-2021 03:30 PM Active और देखें
68. Interior Renovation works for Mine Managers Cabin at Dongri Buzurg Mine(DB/Civil/2021-22/ Dated 12.10.2021) 15-10-2021 19-10-2021 19-10-2021 19-10-2021 04:30 PM Active और देखें
69. Providing and Installation of Tyre Washing System at Dongri Buzurg Mine(DB/CIVIL/2021-22/2095 Dated 12.10.2021) 15-10-2021 22-10-2021 22-10-2021 22-10-2021 04:30 PM Active और देखें
70. Supply of Tools for Chikla and Dongri(PUR/MOIL/CH/820) 14-10-2021 11-11-2021 11-11-2021 11-11-2021 04:30 PM Active और देखें
71. CLEANING OF SPILLAGE ORE AND FINES FROM VARIOUS PLACES OF IMB PLANT AT DONGRI BUZURG MINE(DB/MECH/IMB/21-22 /996) 13-10-2021 29-10-2021 29-10-2021 29-10-2021 04:30 PM Active और देखें
72. Installation and commissioning of Automatic Fire Detection and Suppression System in Eimco Elecon Front End Wheel Loader Model AL520Z at Gumgaon Mine(AGENT/GM/MECH/21-22/1062) 13-10-2021 02-11-2021 02-11-2021 02-11-2021 04:30 PM Active और देखें
73. Muffle Blasting work and ANFO filling work AT DONGRI BUZURG MINE(DB/Blasting /21-22/991) 12-10-2021 20-10-2021 20-10-2021 20-10-2021 04:30 PM Active और देखें
74. Supply of Incremental Encoder(ELECT/MUN/ADGM/21-22/1072, Dated - 10.10.2021) 11-10-2021 23-10-2021 23-10-2021 23-10-2021 04:30 PM Active और देखें
75. Grass Seed Plantation Program in waste dump benches stabilization of mine area for the Compliance of Condition stipulated in Environmental Clearance and as per guideline of Indian Bureau of Mine at Chikla Mine(CIVIL/CH/T.E./21-22/989) 11-10-2021 25-10-2021 25-10-2021 25-10-2021 04:30 PM Active और देखें
76. Purchase of Compressed Oxygen Gas and Dissolved Acetylene Gas(MOIL/21-22/ET-73 dt.11.10.2021) 11-10-2021 25-10-2021 25-10-2021 26-10-2021 03:30 PM Active और देखें
77. WEBSITE SINGLE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF C CLASS FASTENERS-II MATERIALS FOR CHIKLA AND DONGRI BUZURG MINE(TE-MOIL/CH/819/FastenerPart-II) 10-10-2021 25-10-2021 25-10-2021 25-10-2021 04:30 PM Active और देखें
78. Supply of Multi Axis Controller Joystick equivalent to V11(ELECT/MUN/ADGM/21-22/1063, Dated - 08.10.2021) 09-10-2021 22-10-2021 22-10-2021 22-10-2021 04:30 PM Active और देखें
79. PURCHASE OF 1200mm SWEEP CEILING FAN NOS.100, FOR BALAGHAT MINE(GT/TE/ELECT/AJGM/21-22/910) 07-10-2021 13-10-2021 13-10-2021 13-10-2021 03:30 PM Active और देखें
80. Fabrication of Butterfly Valve Diaphragm-3nos along with the Spline Shaft of Air Pulsating Jig of IMB Plant of Balaghat Mine.(AGT/BGT/MECH/IMB/21-22/907) 06-10-2021 05-11-2021 05-11-2021 05-11-2021 04:30 PM Active और देखें
81. Monthly Maintenance Contract for Cap Lamp and cap lamp racks of Munsar Mine for 118 Day(ELECT/MUN/ADGM/21-22/1030, Dated - 01.10.2021) 06-10-2021 13-10-2021 13-10-2021 13-10-2021 03:30 PM Active और देखें
82. Cleaning works, painting works and other miscellaneous preparatory works for Durga Stage Bhuvaneshwari Temple New 220 A Type Quarters colony Rantoli area ahead of Durga Pooja at Dongri Buzurg Mine(DB/CIVIL/21-22/1997) 06-10-2021 07-10-2021 07-10-2021 07-10-2021 04:30 Pm Active और देखें
83. Slab Water Proofing Works for New Medical Administrative Building of Kandri Mine.(KAN/CIVIL/NIT/21-22/2092 DT 05.10.2021) 05-10-2021 12-10-2021 12-10-2021 12-10-2021 04:30 PM Active और देखें
84. Outsourcing of distribution Collection and Cleaning of cap lamps of Kandri Mines for a period of 3 months(KD/ELECT/ 21-22/2075) 04-10-2021 18-10-2021 18-10-2021 18-10-2021 04:30 PM Active और देखें
85. Cleaning and Collection Waste from Septic Tanks, Chambers in Camp Colony at Kandri Mine.(KD/PER/NIT/2021-22/2000) 01-10-2021 15-10-2021 15-10-2021 15-10-2021 04:30 PM Active और देखें
86. PURCHASE OF SOLID TYRE 10.00 X 20-4nos., MAKE TRIDENT BRAND-TRAXTER SUITABLE FOR LHD (Loader) MACHINE IN UNDREGROUND OF BALAGHAT MINE.(PUR/MOIL/BGT/SolTyre/21-22/845) 30-09-2021 08-10-2021 08-10-2021 08-10-2021 04:30 PM Active और देखें
87. Construction of foundation and Fabrication of new gear box of Ruby winder at Balaghat Mine(MOIL/21-22/ET/71) 30-09-2021 20-10-2021 20-10-2021 20-10-2021 03:30 PM Active और देखें
88. Providing and fixing supporting structures for solar panel at Directors Bungalow at MOIL, Nagpur(MOIL/21-22/ET/72) 30-09-2021 20-10-2021 20-10-2021 20-10-2021 03:30 PM Active और देखें
89. Annual repairs to camp quarters at Kandri Mine(MOIL/21-22/ET/69) 30-09-2021 01-11-2021 01-11-2021 01-11-2021 03:30 PM Active और देखें
90. Cleaning and collection of Garbage and cleaning of Drain at Kandri Mine.(KD/PERS/NIT/2021-22/ 1999) 29-09-2021 15-10-2021 15-10-2021 15-10-2021 04:30 PM Active और देखें
91. WEBSITE SINGLE/ PROPRIETORY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SPARES FOR 40 TON HYDRAULIC PRESS AND VIBRATING CUP MILL(PUR/MOIL/C-3/43/E-55/114-M Dt. 28/09/2021) 29-09-2021 11-10-2021 11-10-2021 11-10-2021 03:30 PM Active और देखें
92. PURCHASE OF SOLID TYRE 10.00X20-2nos.,MAKE TRIDENT BRAND-TRAXTER SUITABLE FOR LHD(Loader) MACHINE IN UNDERGROUND OF BALAGHAT MINE.(PUR/MOIL/BGT/Soltyre/21-22/840) 28-09-2021 07-10-2021 07-10-2021 07-10-2021 04:30 PM Active और देखें
93. Procurement of 3 Nos of Restricted Neutral Earthing at Chikla Mine for 1000KVA Transformer(CH/ELECT/21-22/949) 28-09-2021 09-10-2021 09-10-2021 09-10-2021 04:30 PM Active और देखें
94. Providing 6 mbps 1 is to 1 Internet Leased Line at Munsar Mine(AJGM/Group-III/SYS /NW/2021-22/2001) 28-09-2021 05-10-2021 05-10-2021 05-10-2021 04:30 PM Active और देखें
95. Handling of ore tolley work at Kandri Mine(KD/mines/NIT/21-22/1745 dated 26.09.2021) 28-09-2021 11-10-2021 11-10-2021 11-10-2021 04:30 PM Active और देखें
96. PURCHASE OF SPARES FOR EXIDE MAKE LED CAP LAMPS(PUR/MOIL/C-3/615/E-54/109-M Dt.23/09/2021) 24-09-2021 13-10-2021 13-10-2021 13-10-2021 03:30 PM Active और देखें
97. In House Maintenance of Rest House, Canteen and Recreation Hall at Gumgaon Mine.(Agent/GUM/PER/NIT/21-22/1231, 21/09/2021) 23-09-2021 30-09-2021 30-09-2021 30-09-2021 04:30 PM Active और देखें
98. Production of 25 percent Mn. SM Grade ore (BGL-523) from U/G old sub grade mineral rejects material at Balaghat Mine(MINING/BGT/AGT/LT/2021-22/823 dt21.09.2021) 21-09-2021 30-09-2021 30-09-2021 30-09-2021 04:30 PM Active और देखें
99. Development and beatification of garden at New Medical Administrative Building at Gumgaon Mine.(MM/GUM/Civil/LT/21-22/1219 18.09.2021) 20-09-2021 29-09-2021 29-09-2021 29-09-2021 04:30 PM Active और देखें
100. Removal of Waste rock by mechanical means JCB Back loader at Chitaver near ch 12000 section at Ukwa Mine(AGT/Min/UK/LT/21-22/800 Date- 16.09.2021) 20-09-2021 28-09-2021 28-09-2021 28-09-2021 04:30 PM Active और देखें

निविदाएं अधिक जानकारी

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

(2204) वर्ष के निविदाएं देखें
(2024) वर्ष के निविदाएं देखें
(2023) वर्ष के निविदाएं देखें
(2022) वर्ष के निविदाएं देखें
(2021) वर्ष के निविदाएं देखें
(2020) वर्ष के निविदाएं देखें
(2019) वर्ष के निविदाएं देखें
(2018) वर्ष के निविदाएं देखें
(2017) वर्ष के निविदाएं देखें
(2016) वर्ष के निविदाएं देखें
(2015) वर्ष के निविदाएं देखें
(2014) वर्ष के निविदाएं देखें
(2013) वर्ष के निविदाएं देखें
(2012) वर्ष के निविदाएं देखें
(24) वर्ष के निविदाएं देखें
पूर्ण निविदा पुरालेख देखें
सभी मॉयल निविदाएं देखें