निविदा संग्रह

निविदाएं संग्रह

खोज के लिए शीर्षक निविदा जारी करने की तिथि निविदा जारी करने की अंतिम तिथि
क्रमांक शीर्षक अंक प्रारंभ दिनांक अंक अंतिम तिथी प्रस्तुत करने की अंतिम तिथि खुलने की तिथि खुलने का समय स्थिति और देखें
1. Manual Removal of Bottom Ash from the Sump Area of 06th and 13.5th Level Underground Pump House of Balaghat Mine(AGT/BGT/MECH/B-ASH/22-23/175) 10-05-2022 13-05-2022 13-05-2022 13-05-2022 04:30 PM Active और देखें
2. Making connection of 100 nos of newly constructed quarters to STP with Screen tank, additional sump tank and repair of old septic tank at Gumgaon Mine(Agent/GUM/Civil/NIT/22-23/256 DT 05/05/2022) 10-05-2022 18-05-2022 18-05-2022 18-05-2022 04:00 PM Active और देखें
3. Internal Painting Works for Main Administrative Building of Dongribuzurg Mine(DB/Civil/NIT/2022-23/501 Date 08.05.2022) 10-05-2022 17-05-2022 17-05-2022 17-05-2022 04:30 PM Active और देखें
4. Construction of Drain in rear side of B-Type Quarter in Officers Colony of Dongribuzurg Mine.(MOIL/DB/CIVIL/NIT/2022-23/502 Date 08.05.2022) 10-05-2022 17-05-2022 17-05-2022 17-05-2022 04:30 PM Active और देखें
5. Hiring of JCB Machinery Jcb and tipper(AGT/Min/UK/LT/222-23/164 Date- 05.05.2022) 09-05-2022 17-05-2022 17-05-2022 17-05-2022 04:00 PM Active और देखें
6. Up gradation of OCF section for Ch. minus 70 section at Chikla Mine(CIVIL/CH/T.E./22-23/501) 09-05-2022 21-05-2022 21-05-2022 21-05-2022 04:30 PM Active और देखें
7. RCC roof repairs to camp quarters at Chikla Mine(CIVIL/CH/T.E./22-23/511) 09-05-2022 23-05-2022 23-05-2022 23-05-2022 04:30 PM Active और देखें
8. Providing water supply arrangements by laying pipe line to maintain Earth pit values at tolerable limits ay 33KV substation premises at Balaghat Mine(CIVIL/BGT/LT/MM/2022-23/457) 06-05-2022 16-05-2022 16-05-2022 16-05-2022 04:30 PM Active और देखें
9. RCC Roof repair works to camp quarters at Balaghat mine(CIVIL/BGT/LT/MM/2022-23/456) 06-05-2022 16-05-2022 16-05-2022 16-05-2022 04:30 PM Active और देखें
10. Construction of Boundary wall along with Security Check post at Kalaphata Sand Ghat at Kandri Mine(MOIL/22-23/ET/19) 06-05-2022 09-06-2022 09-06-2022 09-06-2022 03:30 PM Active और देखें
11. Maintenance and operation of sewage treatement plant at Munsar Mine.(MOIL/22-23/ET/18) 06-05-2022 06-06-2022 06-06-2022 06-06-2022 03:30 PM Active और देखें
12. Chainlink fencing work towards construction of maintenance yard of heavy machinaries near open cast pit at Dongri Buzurg Mine.(MOIL/22-23/ET/17) 06-05-2022 15-06-2022 15-06-2022 15-06-2022 03:30 PM Active और देखें
13. Maintenance and Operation of water supply scheme at Balaghat Mine.(MOIL/22-23/ET/21) 06-05-2022 06-06-2022 06-06-2022 06-06-2022 03:30 PM Active और देखें
14. Construction of new Substation Building at Kandri Mine.(MOIL/22-23/ET/20) 06-05-2022 06-06-2022 06-06-2022 06-06-2022 03:30 PM Active और देखें
15. PURCHASE OF EXPLOSIVES AND ACCESSORIES(WE-01 DT.05.05.2022 (e-Tender No.MOIL/22-23/ET/30)) 05-05-2022 24-05-2022 24-05-2022 25-05-2022 03:30 PM Active और देखें
16. Construction of New shed for Compressor house at Chikla Mine(CIVIL/CH/T.E./22-23/460) 05-05-2022 18-05-2022 18-05-2022 18-05-2022 04:30 PM Active और देखें
17. Cleaning of Surface Drains and deepening work in industrial premises as monsoon preparatory work at Chikla Mine(CIVIL/CH/T.E./22-23/462) 05-05-2022 18-05-2022 18-05-2022 18-05-2022 04:30 PM Active और देखें
18. Purchase of Site Mixed Emulsion (SME) and Cast Booster(WE-04 DT.05.05.2022 (e-Tender No.MOIL/22-23/ET/32)) 05-05-2022 25-05-2022 25-05-2022 26-05-2022 03:30 PM Active और देखें
19. Retiling and roof repair including laying polythene sheet over of camp quarters and Industrial building at Chikla Mine(CIVIL/CH/T.E./22-23/286) 04-05-2022 14-05-2022 14-05-2022 14-05-2022 04:30 PM Active और देखें
20. Repairing works on Tippers, MH 36 F 614, MH36 F 1390, MH36 H 0744, MH 36 H 0745.(TE/CH/MECH/22-23/135) 04-05-2022 10-05-2022 10-05-2022 10-05-2022 03:30 PM Active और देखें
21. Providing and fixing of Vertical Delineators and retro-reflective traffic sign boards/cautionary sign boards inside Mine Lease Area at Dongribuzurg Mine.(DB/Civil/NIT/2022-23/367 Date 01.05.2022) 04-05-2022 10-05-2022 10-05-2022 10-05-2022 04:00 PM Active और देखें
22. Repairing Works towards upgradation and renovation for Road Weigh Bridge Office in Siding Region of Dongribuzurg Mine.(DB/Civil/NIT/2022-23/360 Date 01.05.2022) 04-05-2022 10-05-2022 10-05-2022 10-05-2022 04:30 PM Active और देखें
23. Supply of Medicines 278 items(PUR/MOIL/C-10/35/WE-02/ET-29) 02-05-2022 09-06-2022 09-06-2022 10-06-2022 03:30 PM Active और देखें
24. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR EPIROC MAKE ROCK BREAKER MODEL MB -1500.(PUR/MOIL/C-5/70/E-1 / 297 -M Dt. 30/04/2022) 30-04-2022 23-05-2022 23-05-2022 23-05-2022 03:30 PM Active और देखें
25. Replacement of Liner Plate 8/10mm of Transfer chute, Bunkers and repair of Transfer chutes,Bunker at various location of IMB plant at Balaghat Mine.(AGENT/BGT/MECH/IMB/22-23/115) 28-04-2022 06-05-2022 06-05-2022 06-05-2022 04:30 PM Active और देखें
26. Cleaning of Spilled ore near the Feed Conveyor Belt and Change over system Near Zero level of Production shaft of Balaghat Mine.(AGT/BGT/MECH/WINDER/22-23/116) 28-04-2022 11-05-2022 11-05-2022 11-05-2022 04:30 PM Active और देखें
27. Cleaning of Spilled ore near the Flap door of Holmes shaft Skip winder and 50MT Bunker area at surface of Balaghat Mine.(AGT/BGT/MECH/WINDER/22-23/117) 28-04-2022 11-05-2022 11-05-2022 11-05-2022 04:30 PM Active और देखें
28. Providing and installation of portable cabin for pit office at Dongri Buzurg Mine(MOIL/22-23/ET/9) 28-04-2022 27-05-2022 27-05-2022 27-05-2022 03:30 PM Active और देखें
29. Construction of metering Cubical room at Munsar Mine.(MOIL/22-23/ET/13) 28-04-2022 30-05-2022 30-05-2022 30-05-2022 03:30 PM Active और देखें
30. Providing and fixing motorized sliding gate near security check post at Kandri Mine(MOIL/22-23/ET/14) 28-04-2022 27-05-2022 27-05-2022 27-05-2022 03:30 PM Active और देखें
31. Construction of Ladies and Gents toilet block for workshop premises at Dongri Buzurg Mine.(MOIL/22-23/ET/15) 28-04-2022 27-05-2022 27-05-2022 27-05-2022 03:30 PM Active और देखें
32. Construction of Gantry at Gumgaon Mine. 2 Construction of room for a Metering cubical b Black smith c Crushing and Screening d Oil Storage e Cement godown f Geological core room g Electrical capital Equipment Panels h Mechanical Capital at Gumgaon(MOIL/22-23/ET/6) 28-04-2022 27-05-2022 27-05-2022 27-05-2022 03:30 PM Active और देखें
33. PURCHASE OF CONCAVE AND MANTLE 1SET FOR CONE CRUSHER(PUR/MOIL/BGT/PP-CC/22-23/110) 27-04-2022 06-05-2022 06-05-2022 06-05-2022 04:30 PM Active और देखें
34. purchase of SPRING STEEL SCREEN PANELS -30 Lots(MOIL/22-23/ET-28) 27-04-2022 18-05-2022 18-05-2022 19-05-2022 03:30 PM Active और देखें
35. Procurement of Gessmann Make Joystick for Chikla Mine(CH/ELECT/22-23/91) 23-04-2022 07-05-2022 07-05-2022 07-05-2022 04:30 PM Active और देखें
36. In House Maintenance of Rest House, Mine Manager Bungalow, Canteen and Recreation Hall at Gumgaon Mine.(Agent/GUM/Civil/NIT/22-23/122, DT-18/04/2022) 21-04-2022 28-04-2022 28-04-2022 28-04-2022 04:30 PM Active और देखें
37. Cleaning of drain sewer line of camp colonies at Balaghat Mine(CIVIL/BGT/LT/AGT/2022-23 dT 18/04/2022) 20-04-2022 25-04-2022 25-04-2022 25-04-2022 04:30 PM Active और देखें
38. Collection of garbage from camp colonies at Balaghat Mine(CIVIL/BGT/LT/AGT/2022-23/689 dT 18/04/2022) 20-04-2022 25-04-2022 25-04-2022 25-04-2022 04:30 PM Active और देखें
39. Non destructive testing NDT of Vital Components and Cage Suspension Gear Components of 250HP and 550 HP winder at Munsar Mine.(AGENT AND JT.GM.M/GR-3/22-23/98) 20-04-2022 27-04-2022 27-04-2022 27-04-2022 04:30 PM Active और देखें
40. Appointment of Registrar and Share Transfer Agent (R and TA).(MOIL/22-23/ET/26) 20-04-2022 06-05-2022 06-05-2022 06-05-2022 03:30 PM Active और देखें
41. Construction of soak pit for transformer oil in 33KV substation at Balaghat Mine(CIVIL/BGT/LT/MM/2022-23/195 dT 17.04.2022) 19-04-2022 27-04-2022 27-04-2022 27-04-2022 04:30 PM Active और देखें
42. Fabrication of spare Pinion shaft 1 No. for the Gear Train Unit in 550 HP Production shaft winding engine at Balaghat Mine(AGENT/BGT/MECH/PS/22-23/59) 18-04-2022 05-05-2022 05-05-2022 05-05-2022 04:30 PM Active और देखें
43. Hiring of Equipment for removal of Sub grade mineral reject of U/G ROM to recover S.M.Grade ore at Balaghat Mine(Mining/BGT/LT/AGT/2021-22/53) 18-04-2022 25-04-2022 25-04-2022 25-04-2022 04:30 PM Active और देखें
44. Fabrication of New Double Helical Gear 1 No of first stage gear box assembly of production shaft winding engine(AGENT/BGT/MECH/PS/22-23/58) 18-04-2022 25-04-2022 25-04-2022 25-04-2022 04:30 PM Active और देखें
45. Replacement of bed coils tubes with bends chemical cleaning of boiler Radiography and Ultrasonic testing of FBC Boiler and passing of Boiler at EMD Plant Dongri Buzurg Mine(MOIL/22-23/ET/16) 18-04-2022 19-05-2022 19-05-2022 19-05-2022 03:30 PM Active और देखें
46. Providing and Fixing of Furon resin ponting to RCC cell tanks at EMD Plant(MOIL/DB/EMD/AJGM/TE /22-23/15) 12-04-2022 29-04-2022 29-04-2022 29-04-2022 04:30 PM Active और देखें
47. Construction of GSR 20,000 Ltr Capacity for fire fighting System in New Administrative Building at Balaghat Mine(CIVIL/BGT/LT/AGT/2021-22 dT 06/04/2022) 11-04-2022 18-04-2022 18-04-2022 18-04-2022 04:30 PM Active और देखें
48. Supply of SS nuts and bolts to EMD plant DB Mine (MOIL/DB/EMD/AJGM/TE /22-23/14) 08-04-2022 26-04-2022 26-04-2022 26-04-2022 4:30 pm Active और देखें
49. Request for proposal for Appointment of General Insurance Intermediary/Broker for MOIL Limited. 07-04-2022 30-05-2022 30-05-2022 30-05-2022 3:30pm Active और देखें
50. Construction of Security Check Post i.e. Gunner Point for Mine Magazine of Dongribuzurg Mine (MOIL/DB/CIVIL/NIT/2022-23/33 Date 03.04.2022) 04-04-2022 12-04-2022 12-04-2022 12-04-2022 4:30 pm Active और देखें
51. Laying of Paver Blocks for portion infront of Heavy Vehicle Washing Pit in Workshop Premises at Dongribuzurg Mine. (MOIL/DB/CIVIL/NIT/2022-23/32 Date 03.04.2022) 04-04-2022 12-04-2022 12-04-2022 12-04-2022 4:30 PM Active और देखें
52. Fabrication of stainless steel hooks for EMD Plant DB Mine (MOIL/DB/EMD/AJGM/TE /21-22/1590) 02-04-2022 19-04-2022 19-04-2022 19-04-2022 4:30 pm Active और देखें
53. Repairing of Lead cathode Plates at EMD Plant, DB Mine(MOIL/DB/EMD/AJGM/TE /21-22/1574) 01-04-2022 16-04-2022 16-04-2022 16-04-2022 04:30 PM Active और देखें
54. Fabrication of FRVE Trays for hydraulic filter press A B C D at EMD Plant Dongri Buzurg Mine(MOIL/DB/EMD/AJGM/TE /21-22/1589) 01-04-2022 16-04-2022 16-04-2022 16-04-2022 04:30 PM Active और देखें
55. Modification and upgradation works for existing ladies toilet of Main Administrative Building of Chikla Mine(CIVIL/CH/T.E./21-22/ 4396) 31-03-2022 12-04-2022 12-04-2022 12-04-2022 04:30 PM Active और देखें
56. Construction of Compound Wall from Main Security Check Post upto EMD Plant Compound Wall near Security Check Post at Dongribuzurg Mine.(MOIL/DB/CIVIL/NIT/2021-22/4239 Date 30.03.2022) 30-03-2022 05-04-2022 05-04-2022 05-04-2022 04:30 PM Active और देखें
57. Construction of new leaching vessel foundation at EMD plant of Dongri Budurg Mine.(MOIL/22-23/ET/8) 30-03-2022 29-04-2022 29-04-2022 29-04-2022 03:30 PM Active और देखें
58. Construction of Ground Service Reservoir of 1.00 Lakh capacity for EMD plant, Dongri Buzurg Mine(MOIL/22-23/ET/12) 30-03-2022 29-04-2022 29-04-2022 29-04-2022 03:30 PM Active और देखें
59. Construction of stone masonary wall along waste dump at Syndicate camp at Dongri Buzurg Mine(MOIL/22-23/ET/10) 30-03-2022 29-04-2022 29-04-2022 29-04-2022 03:30 PM Active और देखें
60. Construction of one metering room at Satuk and one switch room at new colony at Beldongri Mine(MOIL/22-23/ET/7) 30-03-2022 29-04-2022 29-04-2022 29-04-2022 03:30 PM Active और देखें
61. Modification, Alteration and Renovation Works for Plant Cabin and Adjacent Toilet of Integrated Manganese Beneficiation, IMB Plant at Dongribuzurg Mine(MOIL/DB/CIVIL/NIT/2021-22/4235 Date 26.03.2022) 28-03-2022 05-04-2022 05-04-2022 05-04-2022 04:30 PM Active और देखें
62. Cleaning of accumulated silts from drains of Integrated Manganese Beneficiation Plant, IMB Dongribuzurg Mine.(MOIL/DB/CIVIL/NIT/2021-22/4233 Date 26.03.2022) 28-03-2022 05-04-2022 05-04-2022 05-04-2022 04:30 PM Active और देखें
63. Construction of Ramp towards compensating level difference including miscellaneous civil works for newly constructed vehicle parking shed in Workshop Premises at Dongribuzurg Mine.(MOIL/DB/CIVIL/NIT/2021-22/4234 Date 26.03.2022) 28-03-2022 05-04-2022 05-04-2022 05-04-2022 04:30 PM Active और देखें
64. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR CONE CRUSHER (MODEL-ACTPL-32).(PUR/MOIL/C-5/23 /E- 78 /276-M Dt. 25/03/2022) 26-03-2022 18-04-2022 18-04-2022 18-04-2022 03:30 PM Active और देखें
65. Structure Stability Test and Conditional Assessment of Foundation Concrete of Holmes Shaft Head Gear of Balaghat Mine(AGENT/BGT/MECH/WIN/21-22/1506) 23-03-2022 28-03-2022 28-03-2022 28-03-2022 04:30 PM Active और देखें
66. TENDER ENQUIRY IN SINGLE BID SYSTEM FOR TRANSPORT OF EXPLOSIVE / DETONATOR FROM PWD ROAD TO CHIKLA MINE MAGAZINE AT CHIKLA MINE(PUR/MOIL/AGENT/CH/21-22/1556) 23-03-2022 31-03-2022 31-03-2022 31-03-2022 04:30 PM Active और देखें
67. Construction of new substation building for operating 180HP ventilation fan and extension of substation No 2 for installation of panels for 3 Nos 1000 KVA transformer at Kandri Mine.(MOIL/22-23/ET/2) 22-03-2022 21-04-2022 21-04-2022 21-04-2022 03:30 PM Active और देखें
68. Construction of RCC retaining wall stone pitching wall with cement concrete platform at Kandri Mine(MOIL/22-23/ET/3) 22-03-2022 21-04-2022 21-04-2022 21-04-2022 03:30 PM Active और देखें
69. Providing and laying RCC hume pipe drainage network with settling tank from siding area to lease boundary of Kandri Mine(MOIL/22-23/ET/4) 22-03-2022 21-04-2022 21-04-2022 21-04-2022 03:30 PM Active और देखें
70. Construction of boundary wall and laying of concertina coil fencing along lease boundry at Chikla Mine(MOIL/22-23/ET/1) 22-03-2022 21-04-2022 21-04-2022 21-04-2022 03:30 PM Active और देखें
71. Providing water by tankers in residential colonies at Chikla Mine.(MOIL/22-23/ET/5) 22-03-2022 29-03-2022 29-03-2022 29-03-2022 03:30 PM Active और देखें
72. Maintenance of Garden at various places at Chikla Mine(CIVIL/CH/T.E./21-22/ 4307) 21-03-2022 31-03-2022 31-03-2022 31-03-2022 04:30 PM Active और देखें
73. Protection and Maintenance of plants for New plantation for FY 2021-22 require for next three months of security for plantation area in green belt zone thickness 7.5 M Width along lease boundary area at Chikla Mine.(CIVIL/CH/T.E./21-22/1539) 21-03-2022 02-04-2022 02-04-2022 02-04-2022 04:30 PM Active और देखें
74. Construction of oil godown shed for Mine store premises at Chikla Mine(CIVIL/CH/T.E./21-22/ 4303) 21-03-2022 02-04-2022 02-04-2022 02-04-2022 04:30 PM Active और देखें
75. Repairing of various civil work for Timber Yard Premises at Chikla Mine(CIVIL/CH/T.E./21-22/4305) 21-03-2022 02-04-2022 02-04-2022 02-04-2022 04:30 PM Active और देखें
76. PROVIDING SERVICES OF QUALIFIED COORDINATING AGENCY FOR 5MW SOLAR POWER PLANT AT MUNSAR AND QUALIFIED COORDINATING AGENCY FOR 15.2MW WIND ENERGY FARM AT RATEDI HILLS, DEWAS, MADHYA PRADESH.(MOIL/21-22/ET/111) 21-03-2022 21-04-2022 21-04-2022 21-04-2022 03:30 PM Active और देखें
77. Implementation of wired local area connection at New Administrative Building at Balaghat Mine(CVIL/BGT/LT/AGT/2021-22/4787 15/03/2022) 16-03-2022 24-03-2022 24-03-2022 24-03-2022 04:30 PM Active और देखें
78. Fabrication of rock bolts and bearing plates for underground of Gumgaon Mine(AGENT/GM/MECH/21-22/1732) 14-03-2022 26-03-2022 26-03-2022 26-03-2022 04:30 PM Active और देखें
79. or Removal of garbage, cleaning of drains and septic tank for camp colonies at Dongri Buzurg Mine(DB/Welfare/2021-22/1511 Date 12.03.22) 14-03-2022 19-03-2022 19-03-2022 19-03-2022 04:30 PM Active और देखें
80. Washing of Bottom EMD at EMD Plant, DB Mine(MOIL/DB/EMD/AJGM/TE /21-22/1505) 14-03-2022 23-03-2022 23-03-2022 23-03-2022 04:30 PM Active और देखें
81. Operation of Pumps for Drinking water Supply in Camp area at Beldongri Mine.(BEL/CIVIL/NIT/21-22/3420 DT 11.03.2022) 13-03-2022 21-03-2022 21-03-2022 21-03-2022 04:30 PM Active और देखें
82. Providing 10 mbps 1 is to 1 Internet Leased Line at Kandri Mine(AJGM/Group-III/SYS /NW/2021-22/3760) 09-03-2022 16-03-2022 16-03-2022 16-03-2022 04:00 PM Active और देखें
83. Procurement of Miscellaneous Electrical Items for EMD Plant(DB/ELECT/21-22/1489) 08-03-2022 15-03-2022 15-03-2022 15-03-2022 04:30 PM Active और देखें
84. Construction of collection tank for Tyre washer system at Dongri Buzurg Mine(DB/Civil/NIT/2021-22/3774 Date 26.02.2022) 05-03-2022 09-03-2022 09-03-2022 09-03-2022 04:30 PM Active और देखें
85. OUTSOURCING OF DOMESTIC METER READING, PREPARATION OF ELECTRICAL RECOVERY LIST AND PROCESSING OF LOCAL TENDER OF ELECTRICAL DEPARTMENT FOR 6 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/1451) 04-03-2022 10-03-2022 10-03-2022 10-03-2022 03:30 PM Active और देखें
86. Sealed tenders are invited in single bid system for SUPPLY OF APPROVED QUALITY BLACK GITTI FOR CONCRETING AT CHIKLA MINE(PUR/MOIL/CH/Mining/21-22/1491) 03-03-2022 10-03-2022 10-03-2022 10-03-2022 04:30 PM Active और देखें
87. Comprehensive Annual Maintenance Contract CAMC of computer hardware and peripherals installed at Kandri Munsar and Beldongri Mines(AJGM/Group-III/Sys/ AMC/2021-22/3657) 01-03-2022 08-03-2022 08-03-2022 08-03-2022 04:00 PM Active और देखें
88. Providing and fixing of W-Metal Beam Crash Barrier on either side of the main entrance of Workshop Premises of Dongribuzurg Mine(DB/Civil/NIT/2021-22/3773 Date 26.02.2022) 01-03-2022 05-03-2022 05-03-2022 05-03-2022 04:30 PM Active और देखें
89. Miscellaneous Carpentry Works, repairing of existing furniture and allied works for Conference Room of Main Administrative Building of Dongribuzurg Mine.(DB/Civil/NIT/2021-22/3774 Date 26.02.2022) 01-03-2022 05-03-2022 05-03-2022 05-03-2022 04:30 PM Active और देखें
90. Elevating the floor level of Heavy Mechanized Vehicle Washing Pit In Workshop Premises of Dongribuzurg Mine(DB/Civil/NIT/2021-22/3775 Date 26.02.2022) 01-03-2022 05-03-2022 05-03-2022 05-03-2022 04:30 PM Active और देखें
91. handling of ore tolley work at kandri mine(KD/mines/NIT/21-22/3648 dated 27.02.2022) 28-02-2022 11-03-2022 11-03-2022 11-03-2022 04:30 PM Active और देखें
92. WEBSITE SINGLE/ PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR INDUS MAKE ROCK BREAKER MODEL RB 4550(PUR/MOIL/C-5/ 78 /E- 76 /234-M Dt.28/02/2022) 28-02-2022 21-03-2022 21-03-2022 21-03-2022 03:30 PM Active और देखें
93. Construction of two wheeler parking shed for work shop and motor garrage section of Dongri Buzurg Mine(MOIL/21-22/ET/100) 28-02-2022 28-03-2022 28-03-2022 28-03-2022 03:30 PM Active और देखें
94. Annual repairs to camp quarters and annual repairs to plumbing and sanitory items for camp quarters at Gumgaon Mine.(MOIL/21-22/ET/94) 28-02-2022 28-03-2022 28-03-2022 28-03-2022 03:30 PM Active और देखें
95. Annual repairs to camp quarters Beldongri Mine.(MOIL/21-22/ET/96) 28-02-2022 28-03-2022 28-03-2022 28-03-2022 03:30 PM Active और देखें
96. Tender inviting in two bid system for requirement of Pneumatically operated handheld type rock breaker for Chikla Mine(TE/CH/AGENT/MECH/21-22/1460) 24-02-2022 04-03-2022 04-03-2022 04-03-2022 03:30 PM Active और देखें
97. Providing and fixing of pipe line for water sprinkler at 50 52 south siding at Tirodi mine(trd/civil/2021-22/1298 dt 21/01/2022) 24-02-2022 02-03-2022 02-03-2022 02-03-2022 03:30 PM Active और देखें
98. Schedule Maintenance and General inspection of Rigid Guide Rails of Holmes shaft cage and Production shaft winder of Balaghat Mine for the period of one year(AGENT/BGT/MECH/W/21-22/1426) 24-02-2022 17-03-2022 17-03-2022 17-03-2022 04:30 PM Active और देखें
99. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR LINCON MAKE AUTO LUBRICATION SYSTEM FOR GRADER AND DUMPER(PUR/MOIL/C-5/23 /E- 75 /231-M Dt. 23/02/2022) 23-02-2022 16-03-2022 16-03-2022 16-03-2022 03:30 PM Active और देखें
100. Repairing of kachha road dump and mine section area at siapatore mine(trd/civil/2021-22/1370 dt 08/02/2022) 23-02-2022 02-03-2022 02-03-2022 02-03-2022 03:30 PM Active और देखें

निविदाएं अधिक जानकारी

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

(2204) वर्ष के निविदाएं देखें
(2024) वर्ष के निविदाएं देखें
(2023) वर्ष के निविदाएं देखें
(2022) वर्ष के निविदाएं देखें
(2021) वर्ष के निविदाएं देखें
(2020) वर्ष के निविदाएं देखें
(2019) वर्ष के निविदाएं देखें
(2018) वर्ष के निविदाएं देखें
(2017) वर्ष के निविदाएं देखें
(2016) वर्ष के निविदाएं देखें
(2015) वर्ष के निविदाएं देखें
(2014) वर्ष के निविदाएं देखें
(2013) वर्ष के निविदाएं देखें
(2012) वर्ष के निविदाएं देखें
(24) वर्ष के निविदाएं देखें
पूर्ण निविदा पुरालेख देखें
सभी मॉयल निविदाएं देखें