निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Purchase of Mine Ventilation Fans for various Mines - 2 Sets (2 Lots.) (Only Through e-procurement)(WE-96(ET-346) DT.09/12/2019) | 09-12-2019 | 06-01-2020 | 06-01-2020 | 07-01-2020 | 03:30 PM | Active | और देखें |
2. | Trench cutting in ore stacks for sampling at Tirodi Mine(TRD/CIVIL/19-20/4026 DT-05/12/2019) | 07-12-2019 | 14-12-2019 | 14-12-2019 | 14-12-2019 | 03:30 PM | Active | और देखें |
3. | Outsourcing of Operation and General Maintenance of Industrial Pumps in Underground levels at Balaghat Mine for the period of one years (12 months)(MOIL/19-20/ET/290) | 07-12-2019 | 06-01-2020 | 06-01-2020 | 06-01-2020 | 03:30 PM | Active | और देखें |
4. | Raking of Raw Material and Preparation of Sand beds and associated works at Ferro Manganese Plant, Balaghat Mine( MOIL/19-20/ET/308) | 07-12-2019 | 06-01-2020 | 06-01-2020 | 06-01-2020 | 03:30 PM | Active | और देखें |
5. | Purchase of sand for underground concreting work at Ukwa Mine(MOIL/19-20/ET/329) | 06-12-2019 | 13-12-2019 | 13-12-2019 | 13-12-2019 | 03:30 PM | Active | और देखें |
6. | Cleaning and sorting of ROM recovered from South off the pit plot No. 6 at Sitapatore Mine(MOIL/19-20/ET/334) | 06-12-2019 | 06-01-2020 | 06-01-2020 | 06-01-2020 | 03:30 PM | Active | और देखें |
7. | Transportation of ROM and Rock tubs, hoisted from underground at Gumgaon mine( MOIL/19-20/ET/331) | 06-12-2019 | 06-01-2020 | 06-01-2020 | 06-01-2020 | 05:00 PM | Active | और देखें |
8. | Recovery of cleaned ore from subgrade mineral at Parsoda Mine(MOIL/19-20/ET/333) | 06-12-2019 | 06-01-2020 | 06-01-2020 | 06-01-2020 | 03:35 PM | Active | और देखें |
9. | Washing, picking and collection of material from waste reject crude from West side of 6 B section at Tirodi Mine(MOIL/19-20/ET/335) | 06-12-2019 | 06-01-2020 | 06-01-2020 | 06-01-2020 | 03:30 PM | Active | और देखें |
10. | Supply of Timber (As per Annexure - C Enclosed) (27 Lots) (Only Through e-procurement)(WE-86(ET-345) DT.06/12/2019) | 06-12-2019 | 02-01-2020 | 02-01-2020 | 03-01-2020 | 03:30 PM | Active | और देखें |
11. | Pattern making , casting, repairing , machining and Dynamic balancing of Pump spares with complete fitting for 150 HP M P make multistage pump at 6th level underground of Balaghat Mine(AGT/BGT/MECH/PUMP/19-20/858) | 05-12-2019 | 26-12-2019 | 26-12-2019 | 26-12-2019 | 04:30 PM | Active | और देखें |
12. | NDT Testing of Vital Component such as Drum shaft , brake path, Tie rods , Brake pins, Links, Foundation bolts , sheave wheel shaft etc of all winder at balaghat mine(AGENT/BGT/MECH/NDT/19-20/785) | 05-12-2019 | 26-12-2019 | 26-12-2019 | 26-12-2019 | 04:30 PM | Active | और देखें |
13. | PURCHASE OF PEOPLELINK EXTENSION MICROPHONE(PUR/MOIL/C-4/138/E-58/766-M DT.05.12.2019) | 05-12-2019 | 20-12-2019 | 20-12-2019 | 20-12-2019 | 03:30 PM | Active | और देखें |
14. | PROCUREMENT OF GEAR BOX FOR 500MM CONVEYOR BELT FOR CHIKLA MINE(TE-13 DT.04122019) | 05-12-2019 | 25-12-2019 | 25-12-2019 | 25-12-2019 | 04:30 PM | Active | और देखें |
15. | Providing and fixing of Barbed Wire Fencing with RCC pole for Chitawar Section at Ukwa Mine(AGT/Civil/UK/LT/19-20/849) | 04-12-2019 | 12-12-2019 | 12-12-2019 | 12-12-2019 | 04:30 PM | Active | और देखें |
16. | Major repair of Terex Loader at Munsar Mine(A-III/MUN/19-20/842) | 04-12-2019 | 11-12-2019 | 11-12-2019 | 11-12-2019 | 04:00 PM | Active | और देखें |
17. | Procurement 90W LED Street Light fittings for Balaghat Mine(BGT/ELECT/19-20/856) | 04-12-2019 | 24-12-2019 | 24-12-2019 | 24-12-2019 | 04:30 PM | Active | और देखें |
18. | WEBSITE PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF HYDRAULIC CYLINDER SEAL KIT AND HOSE ASSEMBLY(PUR/MOIL/C-11/118/E-54/658-M Dt. 04-12-2019) | 04-12-2019 | 27-12-2019 | 27-12-2019 | 27-12-2019 | 03:30 PM | Active | और देखें |
19. | PURCHASE OF TRANSMISSION ASSEMBLY (AVTEC M6610) FOR BEML MAKE BH60-M DUMPER SR.NO.60080 TO 60084 OPERATING AT DONGRI BUZURG MINE(M.S) (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/270/E-57/753-M DT.04/12/2019) | 04-12-2019 | 30-12-2019 | 30-12-2019 | 30-12-2019 | 03:30 PM | Active | और देखें |
20. | Miscellaneous Contract Work of Cell Bay, Neutralization and Boiler Section at EMD Plant, Dongri Buzurg Mine(MOIL/19-20/ET/293) | 04-12-2019 | 03-01-2020 | 03-01-2020 | 03-01-2020 | 03:30 PM | Active | और देखें |
21. | Outsourcing of pilot plant operation at Balaghat Mine(MIN/BGT/19-20/LT/AGT/853 DT 02.12.2019) | 03-12-2019 | 12-12-2019 | 12-12-2019 | 12-12-2019 | 04:30 PM | Active | और देखें |
22. | Crushing and mixing of manganese ore samples at Central Laboratory(MOIL/19-20/ET/309) | 03-12-2019 | 03-01-2020 | 03-01-2020 | 03-01-2020 | 03:30 PM | Active | और देखें |
23. | Miscellaneous Contract Work of Leaching Section at EMD Plant, Dongri Buzurg Mine(MOIL/19-20/ET/292) | 03-12-2019 | 03-01-2020 | 03-01-2020 | 03-01-2020 | 03:30 PM | Active | और देखें |
24. | PURCHASE OF C CLASS MISCELLANEOUS MATERIALS FOR CHIKLA AND DONGRI BUZURG MINE(TE-12 DT.30112019) | 30-11-2019 | 23-12-2019 | 23-12-2019 | 23-12-2019 | 04:30 PM | Active | और देखें |
25. | PURCHASE OF C CLASS PIPE FITTINGS MATERIALS FOR CHIKLA AND DONGRI BUZURG MINE(TE-10 DT.30112019) | 30-11-2019 | 21-12-2019 | 21-12-2019 | 21-12-2019 | 04:30 PM | Active | और देखें |
26. | PURCHASE OF C CLASS FASTENERS FOR CHIKLA AND DONGRI BUZURG MINE(TE-11 DT.30112019) | 30-11-2019 | 21-12-2019 | 21-12-2019 | 21-12-2019 | 04:30 PM | Active | और देखें |
27. | Maintenance and operation of water supply scheme at Ukwa Mine(AGENT/CIVIL/BGT/LT/19-20/839 DATE 28.11.2019) | 29-11-2019 | 07-12-2019 | 07-12-2019 | 07-12-2019 | 04:30 PM | Active | और देखें |
28. | Hiring of excavator for surface levelling of new sand stowing plant at ch 6500 near vertical shaft at Ukwa Mine(AGENT/MIN/UK/LT/19-20/837 DATE 28.11.2019) | 29-11-2019 | 10-12-2019 | 10-12-2019 | 10-12-2019 | 04:30 PM | Active | और देखें |
29. | Ore tolly breaking work at Ukwa Mine(AGENT/MIN/UK/LT/19-20/838 DATE 28.11.2019) | 29-11-2019 | 10-12-2019 | 10-12-2019 | 10-12-2019 | 04:30 PM | Active | और देखें |
30. | Purchase of Laptop (Touch Screen) - 2 Nos.(1 Lot) (Only Through e-procurement)(WE-92 (ET-326) DT.29/11/2019) | 29-11-2019 | 16-12-2019 | 16-12-2019 | 17-12-2019 | 03:30 PM | Active | और देखें |
31. | Fluorescent Jackets(PUR/MOIL/C-1/190/WE-88/ET/327) | 29-11-2019 | 19-12-2019 | 19-12-2019 | 20-12-2019 | 03:30 PM | Active | और देखें |
32. | Inner Harness(PUR/MOIL/C-1/190/WE-89/ET/328) | 29-11-2019 | 20-12-2019 | 20-12-2019 | 21-12-2019 | 11:00 AM | Active | और देखें |
33. | Excavation for reclamation of site for construction of proposed hospital building and new vocational training center at Munsar Mine(MOIL/19-20/ET/314) | 29-11-2019 | 06-01-2020 | 06-01-2020 | 06-01-2020 | 03:30 PM | Active | और देखें |
34. | Annual repairs to camp quarters at Munsar Mine(MOIL/19-20/ET/319) | 29-11-2019 | 06-01-2020 | 06-01-2020 | 06-01-2020 | 03:30 PM | Active | और देखें |
35. | Construction of railway siding plateform at Munsar Mine.(MOIL/19-20/ET/317) | 29-11-2019 | 06-01-2020 | 06-01-2020 | 06-01-2020 | 03:30 PM | Active | और देखें |
36. | Maintenance and operation of pumps for drinking water supply in camp area at Kandri Mine(MOIL/19-20/ET/318) | 29-11-2019 | 06-01-2020 | 06-01-2020 | 06-01-2020 | 03:30 PM | Active | और देखें |
37. | Annual repairs to camp quarters at Dongri Buzurg Mine(MOIL/19-20/ET/316) | 29-11-2019 | 30-12-2019 | 30-12-2019 | 30-12-2019 | 03:30 PM | Active | और देखें |
38. | Hiring of Architect and structural consultancy services for construction of new training center at Chikla Mine(MOIL/19-20/ET/320) | 29-11-2019 | 30-12-2019 | 30-12-2019 | 30-12-2019 | 03:30 PM | Active | और देखें |
39. | Construction of Slime pond for IMB plant at Balaghat Mine(MOIL/19-20/ET/315) | 29-11-2019 | 30-12-2019 | 30-12-2019 | 30-12-2019 | 03:30 PM | Active | और देखें |
40. | Safety Belts(PUR/MOIL/C-1/190/WE-87/ET/325) | 28-11-2019 | 19-12-2019 | 19-12-2019 | 20-12-2019 | 03:30 PM | Active | और देखें |
41. | Printing of Diary for the year 2020(PUR/MOIL/C-12/26/WE-90/ET/324) | 27-11-2019 | 09-12-2019 | 09-12-2019 | 10-12-2019 | 03:30 PM | Active | और देखें |
42. | Company Calendar(PUR/MOIL/C-12/26/E-56 Dt. 26/11/2019) | 26-11-2019 | 05-12-2019 | 05-12-2019 | 05-12-2019 | 03:30 PM | Active | और देखें |
43. | Installlation of 550 HP motor with gear box work included Drilling and grouting at Balaghat Mine(Civil/BGT/LT/19-20/3798) | 25-11-2019 | 10-12-2019 | 10-12-2019 | 10-12-2019 | 04:30 PM | Active | और देखें |
44. | Transportation of Coal to EMD Plant Dongri Buzurg Mine - 4800 MT(WE-83 e -Tender No. MOIL/19-20/ET-323 Dt.25.11.19) | 25-11-2019 | 17-12-2019 | 17-12-2019 | 18-12-2019 | 03:30 PM | Active | और देखें |
45. | SUPPLY OF MINER SAFETY CAP LAMP WITH LI-ION BATTERY FOR KANDRI MINE(Elect/KD/19-20/2781) | 23-11-2019 | 13-12-2019 | 13-12-2019 | 13-12-2019 | 03:30 PM | Active | और देखें |
46. | FOR PURCHASE OF MISCELLENEOUS ITEMS C CLASS AS PER ANNEXURE III(MOIL/EMD/CH/AJGM/19-20/572) | 22-11-2019 | 11-12-2019 | 11-12-2019 | 11-12-2019 | 11:00 AM | Active | और देखें |
47. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF BARE AIR END FOR INDUS ROCK TOOL MAKE DRILL MACHINE IRB-300, MAKE-INDUS ROCK TOOL.(PUR/MOIL/C-5/77/E-55/717-M Dt. 21/11/2019) | 21-11-2019 | 02-12-2019 | 02-12-2019 | 02-12-2019 | 03:30 PM | Active | और देखें |
48. | TENDER FOR REPAIRING OF RADICON MAKE REDUCTION GEARBOX(MOIL/EMD/CH/AJGM/2019-20/571) | 21-11-2019 | 11-12-2019 | 11-12-2019 | 11-12-2019 | 04:30 PM | Active | और देखें |
49. | Fabrication of Hose Fitting required in underground at Balaghat Mine( AGENT/BGT/MECH/HOSE FITTING/19-20/815) | 21-11-2019 | 10-12-2019 | 10-12-2019 | 10-12-2019 | 04:30 PM | Active | और देखें |
50. | Outsourcing the Operation of Pilot Plant at Balaghat Mine for period of one year(MOIL/19-20/ET/296) | 20-11-2019 | 20-12-2019 | 20-12-2019 | 20-12-2019 | 03:30 PM | Active | और देखें |
51. | Work for outsourcing meter reading, preparation of deduction list and processing of local tenders of Electrical Dept of Balaghat Mine(BGT/ELECT/19-20/807) | 19-11-2019 | 09-12-2019 | 09-12-2019 | 09-12-2019 | 04:30 PM | Active | और देखें |
52. | Picking and collection of 20 percent Mn. SM Grade ore BGL-564 from subgrade mineral reject of Underground ROM at Balaghat mine(MOIL/19-20/ET/306) | 19-11-2019 | 19-12-2019 | 19-12-2019 | 19-12-2019 | 03:30 PM | Active | और देखें |
53. | Picking and collection of UKL -471 20 percent from Footwall subgrade mineral stock from Ch.10000 to Ch.12000 at Ukwa Mine(MOIL/19-20/ET/303) | 19-11-2019 | 19-12-2019 | 19-12-2019 | 19-12-2019 | 03:30 PM | Active | और देखें |
54. | Picking and collection of 20 percent SM grade ore CHL-535 from cleaning of sub grade mineral reject from ROM at Magazine sub grade mineral stock area west side section of Chikla Mine(MOIL/19-20/ET/304) | 19-11-2019 | 19-12-2019 | 19-12-2019 | 19-12-2019 | 03:30 PM | Active | और देखें |
55. | Cleaning and sorting of ROM recovered from North off the pit plot No.6 at Sitapatore Mine(MOIL/19-20/ET/305) | 19-11-2019 | 19-12-2019 | 19-12-2019 | 19-12-2019 | 03:30 PM | Active | और देखें |
56. | Maintenance and watering for plantation at Kandri Mine.(Kan/Civil/NIT/19-20/2716 Date 17.11.2019) | 18-11-2019 | 23-11-2019 | 23-11-2019 | 23-11-2019 | 04:30 PM | Active | और देखें |
57. | Additional Laying of Paver Blocks infront of B And C Type Officers Quarters in Officers Colony, Wahitola Munsar Mine.(MUN/Civil/NIT/LT/19-20/145 Date 17.11.2019) | 18-11-2019 | 25-11-2019 | 25-11-2019 | 25-11-2019 | 04:30 PM | Active | और देखें |
58. | Transportation of Coal to Fe. Mn. Plant, Balaghat Mine- 2,600 MT(WE-82 e -Tender No. MOIL/19-20/ET-322 Dt.18.11.19) | 18-11-2019 | 10-12-2019 | 10-12-2019 | 11-12-2019 | 03:30 PM | Active | और देखें |
59. | Repairing of Hydraulic Control Valve of Dozer BD155 No 2 operating at Dongri Buzurg Mine(DB/MECH/19-20/JGM(MECH)/562) | 18-11-2019 | 03-12-2019 | 03-12-2019 | 03-12-2019 | 04:30 PM | Active | और देखें |
60. | Repairing of Bucket Assembly 5.6 CU M 4 Nos. of TATA Hitachi 1200 No 3 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/19-20/JGM(MECH)/561) | 18-11-2019 | 03-12-2019 | 03-12-2019 | 03-12-2019 | 04:30 PM | Active | और देखें |
61. | Purchase of HT VCB Panels for Various Mines - 8 Lots. (Only Through e-procurement)(WE-85(ET-321) DT.16/11/2019) | 16-11-2019 | 09-12-2019 | 09-12-2019 | 10-12-2019 | 03:30 PM | Active | और देखें |
62. | Deployment of manpower for the necessary watch and ward of Parsoda Mine.(MUN/Personnel/NIT/LT/19-20/141 Date 15.11.2019) | 15-11-2019 | 25-11-2019 | 25-11-2019 | 25-11-2019 | 04:30 PM | Active | और देखें |
63. | Shifting of EMD flakes from New Electrolytic Cell to Neutralization Section at EMD PLANT DONGRI BUZURG MINE(MOIL/EMD/DB/Jt.GM/2019-20/322) | 14-11-2019 | 23-11-2019 | 23-11-2019 | 23-11-2019 | 04:30 PM | Active | और देखें |
64. | Dismantling of old sheave wheel and installation, Commissioning of new sheave wheel 2800 mm diameter 1 no at Kandri Mine(A-III/KAN/19-20/2672) | 13-11-2019 | 03-12-2019 | 03-12-2019 | 04-11-2019 | 04:30 PM | Active | और देखें |
65. | Dismantling of old sheave wheel and installation, Commissioning of new sheave wheel 2800 mm diameter 1 no at Kandri Mine(A-III/KAN/19-20/2672) | 13-11-2019 | 03-12-2019 | 03-12-2019 | 04-12-2019 | 04:30 PM | Active | और देखें |
66. | Maintenence, distribution and collection of caplamps at Balaghat Mine(BGT/ELECT/19-20/3694) | 13-11-2019 | 03-12-2019 | 03-12-2019 | 03-12-2019 | 04:30 PM | Active | और देखें |
67. | Cleaing of Drains sewer lines of Camp Colonies at Balaghat Mine(Civil/BGT/T.E./19-20/780) | 11-11-2019 | 19-11-2019 | 19-11-2019 | 19-11-2019 | 04:30 PM | Active | और देखें |
68. | Dismantling 92 unit old labour quarters having old A.C.Sheet roof at south camp at Tirodi Mine(TRD/CIVIL/19-20/1950 DT-07/11/2019) | 09-11-2019 | 16-11-2019 | 16-11-2019 | 16-11-2019 | 03:30 PM | Active | और देखें |
69. | Drilling of Bore holes 100 mm dia from 13.5 level to 15 level in underground at Balaghat Mine(AGENT/BGT/19-20/778) | 09-11-2019 | 29-11-2019 | 29-11-2019 | 29-11-2019 | 04:30 PM | Active | और देखें |
70. | Scanning and Digitization of Company Records(MOIL/19-20/ET/277) | 06-11-2019 | 26-11-2019 | 26-11-2019 | 26-11-2019 | 03:30 PM | Active | और देखें |
71. | Recasting of 4 nos copper contact clamps (FMP/Elect/19-20/203) | 05-11-2019 | 26-11-2019 | 26-11-2019 | 26-11-2019 | 4:30 PM | Active | और देखें |
72. | Outsourcing of Operation and Maintenance of Crushing and Screening Plant at Gumgaon Mine for the period of 24 Months (Two Years) (MOIL/19-20/ET/281) | 05-11-2019 | 05-12-2019 | 05-12-2019 | 05-12-2019 | 3:30 PM | Active | और देखें |
73. | Transportation of bottom ash from Adani power plant, Tiroda to Balaghat Mine of M/S MOIL Limited for stowing purpose (MIN/BGT/19-20/LT/AGT/759 DATE 03.11.2019) | 04-11-2019 | 15-11-2019 | 15-11-2019 | 15-11-2019 | 4:30 PM | Active | और देखें |
74. | Outsourcing of Industrial Pumping Operation and Maintenance in Underground Vertical Shaft at Munsar Mine for the period of One year (12 Months) (MOIL/19-20/ET/280) | 02-11-2019 | 05-12-2019 | 05-12-2019 | 05-12-2019 | 3:30 PM | Active | और देखें |
75. | Providing main and check meters with metering equipment at 15.2 MW and 4.8 MW Wind Energy Farms, ratedi and Nagda Hills, Dewas(MP) respectively (MOIL/19-20/ET/295) | 01-11-2019 | 18-11-2019 | 18-11-2019 | 18-11-2019 | 3:30 PM | Active | और देखें |
76. | Concreting of Shaft cross cut at -450 Level using precast slab at Kandri Mine (MOIL/19-20/ET/287) | 01-11-2019 | 15-11-2019 | 15-11-2019 | 15-11-2019 | 3:30 PM | Active | और देखें |
77. | Picking and collection of low grade Ore DBL-563 from ROM processed through mobile crushing and screening plant at East Side Part-6 of Dongri Buzurg Mine (MOIL/19-20/ET/289) | 01-11-2019 | 09-12-2019 | 09-12-2019 | 09-12-2019 | 3:30 PM | Active | और देखें |
78. | Trench cutting in ore stacks at Beldongri Mine (MOIL/19-20/ET/288) | 01-11-2019 | 02-12-2019 | 02-12-2019 | 02-12-2019 | 3:30 PM | Active | और देखें |
79. | Trench cutting in ore stacks at Tirodi Mine (MOIL/19-20/ET/294) | 01-11-2019 | 02-12-2019 | 02-12-2019 | 02-12-2019 | 3:30 PM | Active | और देखें |
80. | Purchase of Cross Bit, 57mm dia suitable for ATLAS COPCO Make Cable Bolting Machine. (WE-68 e -Tender No. MOIL/19-20/ET-302 Dt.01.11.19) | 01-11-2019 | 10-12-2019 | 10-12-2019 | 11-12-2019 | 3:30 PM | Active | और देखें |
81. | Security Guards for Diamond Drilling Site at Balaghat Mine (MOIL/19-20/ET/282) | 31-10-2019 | 21-11-2019 | 21-11-2019 | 21-11-2019 | 3:30 PM | Active | और देखें |
82. | Purchase of Electrically Operated Centrifugal Pumps for Various Mines - 27 Nos.(14 Lots) (Only Through e-procurement) (WE-63(ET-246) DT.31.10.2019) | 31-10-2019 | 25-11-2019 | 25-11-2019 | 26-11-2019 | 3:30 PM | Active | और देखें |
83. | Purchase of Crawler Mounted, Diesel Engine Operated Hydraulic Excavator with Backhoe Rock Bucket Having Bucket Capacity Min. 0.90 Cu.M. - 2 Nos.(2 Lots) (WE-66(ET-301) DT.31.10.2019) | 31-10-2019 | 02-12-2019 | 02-12-2019 | 03-12-2019 | 3:30 PM | Active | और देखें |
84. | Painting works to industrial building to celebrate the safety week at Munsar Mine (MUN/CIVIL/NIT/19-20/139Date 25.10.2019) | 30-10-2019 | 01-11-2019 | 01-11-2019 | 01-11-2019 | 4:30 PM | Active | और देखें |
85. | Purchase of LT PANEL - 13 Lots for Various Mines (Only Through e-procurement) (WE-77(ET-299) DT.30.10.2019 ) | 30-10-2019 | 25-11-2019 | 25-11-2019 | 26-11-2019 | 3:30 PM | Active | और देखें |
86. | Procurement 90W LED Street Light fittings for Balaghat Mine (BGT/ELECT/19-20/3531) | 30-10-2019 | 15-11-2019 | 15-11-2019 | 15-11-2019 | 4:30 PM | Active | और देखें |
87. | Purchase of Tilting Tubs for Various MS and MP Mines - 385 Nos.(3 Lots) (24 CFT Tubs, TRB Type - 350 Nos. and 16 CFT Tubs, TRB Type - 35 Nos.) (Only Through e-procurement) (WE-74(ET-300) DT.30.10.2019) | 30-10-2019 | 21-11-2019 | 21-11-2019 | 22-11-2019 | 3:30 PM | Active | और देखें |
88. | Collection of Garbage and dump in to barren /abounded land at Balaghat Mine (Civil/BGT/LT/19-20/740) | 28-10-2019 | 04-11-2019 | 04-11-2019 | 04-11-2019 | 4:30 PM | Active | और देखें |
89. | Civil house keeping works to Industrial and allied Building inside Mine Premises for upcoming Safety Week at Balaghat Mine (Civil/BGT/LT/19-20/738) | 28-10-2019 | 04-11-2019 | 04-11-2019 | 04-11-2019 | 4:30 PM | Active | और देखें |
90. | Fabrication of Ore Measuring frames size 16 cft 50 nos (DB/MECH/19-20/459) | 28-10-2019 | 05-11-2019 | 05-11-2019 | 05-11-2019 | 4:30 PM | Active | और देखें |
91. | Purchase of Hyd.Backhoe Excavator, Bucket Cap.5.5 CM for Dongri Buzurg Mine(M.S) - 2 Nos.(2 Lots) (Only Through e-procurement) (WE-76(ET-298) DT.28.10.2019 ) | 28-10-2019 | 26-11-2019 | 26-11-2019 | 27-11-2019 | 3:30 PM | Active | और देखें |
92. | Outsourcing of Industrial Pumping Operation in Underground Mine at Gumgaon Mine for period of 12(Twelve) Months(MOIL/19-20/ET/278) | 25-10-2019 | 04-12-2019 | 04-12-2019 | 04-12-2019 | 03:30 PM | Active | और देखें |
93. | Transporting of one no LnT Komatsu PC450 LC model Hydraulic Excavator from Tirodi Mine to Dongri Buzurg Mine through Truck Trailer. (DB/MECH/19-20/JGM(MECH)/457) | 24-10-2019 | 01-11-2019 | 01-11-2019 | 01-11-2019 | 4:30 PM | Active | और देखें |
94. | Cleaning of Workshop and Workshop premises of Dongri Buzurg Mine. (DB/MECH/19-20/JGM(MECH)/458) | 24-10-2019 | 05-11-2019 | 05-11-2019 | 05-11-2019 | 4:30 PM | Active | और देखें |
95. | Purchase of SULPHURIC ACID with Transportation-250 MT (WE-57 e -Tender No. MOIL/19-20/ET-297 Dt.24.10.19) | 24-10-2019 | 14-11-2019 | 15-11-2019 | 15-11-2019 | 3:30 PM | Active | और देखें |
96. | Laying of 6 inch and 4 inch G I Pipe Lines for Compressed Air supply in underground levels 7th 8th and 9th level at Balaghat Mine (AGT/BGT/MECH/PIPE/19-20/731) | 24-10-2019 | 16-11-2019 | 16-11-2019 | 16-11-2019 | 4:30 PM | Active | और देखें |
97. | PURCHASE OF MINER SAFETY CAP LAMP WITH LI-ION BATTERY FOR CHIKLA MINE (TE-08 DT.23102019) | 23-10-2019 | 06-11-2019 | 06-11-2019 | 06-11-2019 | 4:30 PM | Active | और देखें |
98. | Repairing and Rewinding of 2 nos. 35 HP submersible pumps (BGT/ELECT/19-20/720) | 23-10-2019 | 12-11-2019 | 12-11-2019 | 12-11-2019 | 4:30 PM | Active | और देखें |
99. | Pushing and unloading of tubs ug and on surface at Vertical section at Ukwa Mine(AGT/MIN/UK/LT/19-20/712 DATE 22.10.2019) | 22-10-2019 | 28-10-2019 | 28-10-2019 | 28-10-2019 | 4:30 PM | Active | और देखें |
100. | Development Works for area adjacent to 33kV Electrical Substation Building and Proposed Electrical Switchyard Munsar Mine (Mun/Civil/NIT/LT/2019-20/133 Dt 20.10.2019) | 21-10-2019 | 28-10-2019 | 28-10-2019 | 28-10-2019 | 4:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2025) वर्ष के निविदाएं देखें |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(205) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |