निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Laying of HDPE pipeline (OD 280 mm) for high head slurry pump at D.B. Mine for monsoon dewatering work.(DB/MECH/21-22/879) | 13-09-2021 | 18-09-2021 | 18-09-2021 | 18-09-2021 | 04:30 PM | Active | और देखें |
2. | TENDER ENQUIRY IN SINGLE BID SYSTEM FOR TRANSPORT OF EXPLOSIVE DETONATOR FROM PWD ROAD TO CHIKLA MINE MAGAZINE AT CHIKLA MINE(TE-419 DT.13092021) | 13-09-2021 | 20-09-2021 | 20-09-2021 | 20-09-2021 | 04:30 PM | Active | और देखें |
3. | Fabrication of Pneumatic Actuators Valves of Air Pulsating Jig for I.M.B Plant at Balaghat Mine.(AGT/BGT/MECH/IMB/21-22/771) | 11-09-2021 | 06-10-2021 | 06-10-2021 | 06-10-2021 | 04:30 PM | Active | और देखें |
4. | Fabrication of 24Nos. of Wheel Axle Shaft Of G.B. car deployed in underground at Balaghat Mine.(AGT/BGT/MECH/GB-CAR/21-22/770) | 10-09-2021 | 24-09-2021 | 24-09-2021 | 24-09-2021 | 04:30 PM | Active | और देखें |
5. | 10 Mbps Internet Lease Line MOIL LTD Ukwa Mine(BGT/SYS/INTERNET/2020-22/766) | 09-09-2021 | 20-09-2021 | 20-09-2021 | 20-09-2021 | 03:30 PM | Active | और देखें |
6. | Annual repairs to camp quarters at Chikla Mine ( MOIL/21-22/ET/65) | 07-09-2021 | 06-10-2021 | 06-10-2021 | 06-10-2021 | 3:30 PM | Active | और देखें |
7. | Construction of retaining wall, floor and drainage system near new installed screening plant and construction of biomatric attendance room near pit office and BDC at Kandri Mine (MOIL/21-22/ET/66) | 07-09-2021 | 06-10-2021 | 06-10-2021 | 06-10-2021 | 3:30 PM | Active | और देखें |
8. | Drilling of bore with installation of pump, laying pipeline network and construction of pump house for supply of drinking water for dry seperation unit and guest house at Munsar Mine. (MOIL/21-22/ET/67) | 07-09-2021 | 06-10-2021 | 06-10-2021 | 06-10-2021 | 3:30 PM | Active | और देखें |
9. | Annual repairs to camp quarters at Tirodi Mine. (MOIL/21-22/ET/68) | 07-09-2021 | 06-10-2021 | 06-10-2021 | 06-10-2021 | 3:30 PM | Active | और देखें |
10. | Repairing of 80MT Road Weighbridge operating at dongribuzurg mine (MOIL/DB/MECH/2021-2022/830) | 04-09-2021 | 15-09-2021 | 15-09-2021 | 15-09-2021 | 4:30 | Active | और देखें |
11. | PROVIDING SUPPLYING OF RESTRICTED NEUTRAL SYSTEM FOR 800KVA, 3.3KV/433V TRANSFORMERS FOR BALAGHAT MINE (BGT/TE/ELECT/AJGM/21-22/736) | 03-09-2021 | 08-09-2021 | 08-09-2021 | 08-09-2021 | 3:30 PM | Active | और देखें |
12. | Rehandling of Manganese Ore at Railway Siding at Dongri Buzurg Mine. (DB/Mining/2021-22/807 Date 08.08.2021) | 03-09-2021 | 08-09-2021 | 08-09-2021 | 08-09-2021 | 4:30 PM | Active | और देखें |
13. | PROCUREMENT OF RESIN CAST 11 KV GRADE CT 60/5 A AS PER ANNEXURE A(PUR/MOIL/BEL/2021-22/1261) | 02-09-2021 | 10-09-2021 | 10-09-2021 | 10-09-2021 | 04:30 PM | Active | और देखें |
14. | CS WHEEL ASSEMBLY WITH COVER FOR 4 MT GB CAR IN UNDERGROUND AT BALAGHAT MINE(PUR/MOIL/BGT/GB CAR/21-22/732) | 01-09-2021 | 15-09-2021 | 15-09-2021 | 15-09-2021 | 04:30 PM | Active | और देखें |
15. | Supply(PUR/MOIL/CH/C CLASS/Nut and Bolts/21-22/818) | 01-09-2021 | 04-10-2021 | 04-10-2021 | 04-10-2021 | 04:30 PM | Active | और देखें |
16. | OUTSOURCING FOR MONITORING AND OPERATION OF 33KV SUBSTATION FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/731) | 01-09-2021 | 03-09-2021 | 03-09-2021 | 03-09-2021 | 03:30 PM | Active | और देखें |
17. | Pushing and pulling of empty loaded tubs rock tubs in to from cage at pit top and and incline top and tipping the loaded tubs at OCF Gala tipping point(BEL/MIN/2021-22/1272) | 01-09-2021 | 07-09-2021 | 07-09-2021 | 07-09-2021 | 04:30 PM | Active | और देखें |
18. | Purchase of black Gitti for UG concreting at Kandri Mine(KD/MINES/NIT/2021-22/ 1666) | 31-08-2021 | 15-09-2021 | 15-09-2021 | 15-09-2021 | 04:30 PM | Active | और देखें |
19. | Complete Survey, estimation of 3D Subsidence parameter and 3D Numerical Modelling of Subsidence parameters at Beldongri Mine of MOIL over an area of 26.66 Ha. and 12.99 Ha(MOIL/21-22/ET/44) | 30-08-2021 | 30-09-2021 | 30-09-2021 | 30-09-2021 | 03:30 PM | Active | और देखें |
20. | Cutting and cleaning of grass shrub Bushes at Officer Colony Babu line Syndicate Camp and Chandmara Colony at Dongri Buzurg Mine(DB/CIVIL/21-22/1725 dt 26.08.2021) | 29-08-2021 | 07-09-2021 | 07-09-2021 | 07-09-2021 | 04:30 PM | Active | और देखें |
21. | Providing and installation of tyre washer system at Chikla Mine(CIVIL/CH/T.E./21-22/1803) | 28-08-2021 | 13-09-2021 | 13-09-2021 | 13-09-2021 | 04:30 PM | Active | और देखें |
22. | Production of 25 percentMn. SM Grade ore (BGL-523) from U/G old sub grade mineral rejects material at Balaghat Mine(MINING/BGT/LT/AGT/21-22/717 DT. 26.08.2021) | 27-08-2021 | 02-09-2021 | 02-09-2021 | 02-09-2021 | 04:30 PM | Active | और देखें |
23. | REQUEST FOR EXPRESSION OF INTEREST FOR THE TRANSFER OF TECHNOLOGY FOR PRODUCTION OF ELECTROLYTIC MANGANESE METAL EMM AND OR DESIGN AND CONSTRUCTION OF A NEW ELECTROLYTIC MANGANESE METAL EMM PLANT.(SMG/EMM-EOI/21-22/01) | 26-08-2021 | 15-11-2021 | 15-11-2021 | 15-11-2021 | 3:00 PM | Active | और देखें |
24. | INSTALLATION OF ESE TYPE LIGHTING ARRESTOR FOR 33KV OUTDOOR SUBSTATION AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/704) | 25-08-2021 | 31-08-2021 | 31-08-2021 | 31-08-2021 | 03:30 PM | Active | और देखें |
25. | Repair of reduced Ore Shed at EMD Plant at DB Mine(DB/CIVIL/21-22/762 dt 21.08.2021) | 25-08-2021 | 31-08-2021 | 31-08-2021 | 31-08-2021 | 04:30 PM | Active | और देखें |
26. | C clas tender(PUR/MOIL/CH/C CLASS/21-22/783 Dt. 23.08.2021) | 25-08-2021 | 25-09-2021 | 25-09-2021 | 25-09-2021 | 04:30 PM | Active | और देखें |
27. | Collection of Garbage from camp colonies at Balaghat Mine(CIVI/BGT/LT/AGT/21-22/664 DT. 13/08/2021) | 23-08-2021 | 30-08-2021 | 30-08-2021 | 30-08-2021 | 04:30 PM | Active | और देखें |
28. | Cleaning of drain sewer line of camp colonies at Balaghat mine(CIVI/BGT/LT/AGT/21-22/669 DT. 17.08.2021) | 23-08-2021 | 30-08-2021 | 30-08-2021 | 30-08-2021 | 04:30 PM | Active | और देखें |
29. | Cleaning and shorting of surplus underground ROM at Ch 10000 BDC Section of Ukwa Mine(AGT/Min/UK/LT/21-22/ 678 Date 21.08.202) | 23-08-2021 | 01-09-2021 | 01-09-2021 | 01-09-2021 | 04:30 PM | Active | और देखें |
30. | 10 Mbps backup Internet Leased Line at BALAGHAT MINE(BGT/SYS/INTERNET/2021-22/677) | 21-08-2021 | 06-09-2021 | 06-09-2021 | 06-09-2021 | 03:30 PM | Active | और देखें |
31. | Repairing of Grouser shoe of BEML Dozer no-4 operating AT DONGRI BUZURG MINE(DB/MECH/21-22/JGM(MEC)/744) | 20-08-2021 | 27-09-2021 | 27-09-2021 | 27-09-2021 | 04:30 PM | Active | और देखें |
32. | WEBSITE SINGLE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR EIMCO ELECON MAKE SDL LHD UDM MACHINE(PUR/MOIL/C-5/ 27 /E- 53 / 90-M) | 20-08-2021 | 09-09-2021 | 09-09-2021 | 13-09-2021 | 03:30 PM | Active | और देखें |
33. | Construction of Guard Room at Mine Manager Bungalow at Ukwa Mine(Civil/UK/LT/21-22/951 Date- 16.08.2021) | 19-08-2021 | 28-08-2021 | 28-08-2021 | 28-08-2021 | 04:30 PM | Active | और देखें |
34. | Cleaning of accumulated sand form under ground at Kandri Mine(KD/mines/NIT/21-22/1530 dated 17.8.2021) | 18-08-2021 | 27-08-2021 | 27-08-2021 | 27-08-2021 | 04:30 PM | Active | और देखें |
35. | Maintenance and Operation of water Supply Scheme at Ukwa Mine(CIVIL/UK/LT/21-22/943) | 17-08-2021 | 26-08-2021 | 26-08-2021 | 26-08-2021 | 04:30 PM | Active | और देखें |
36. | PURCHASE OF C CLASS FASTENERS MATERIALS FOR KANDRI, MUNSAR, GUMGAON AND BELDONGRI MINE(TE-2 DT.16082021) | 17-08-2021 | 04-09-2021 | 04-09-2021 | 04-09-2021 | 04:30 PM | Active | और देखें |
37. | PURCHASE OF C CLASS MATERIALS FOR KANDRI, MUNSAR, GUMGAON AND BELDONGRI MINE(TE-3 DT.17082021) | 17-08-2021 | 06-09-2021 | 06-09-2021 | 06-09-2021 | 04:30 PM | Active | और देखें |
38. | PURCHASE OF C CLASS PIPE FITTINGS MATERIALS FOR KANDRI, MUNSAR, GUMGAON AND BELDONGRI MINE(TE-1 DT.16082021) | 17-08-2021 | 03-09-2021 | 03-09-2021 | 03-09-2021 | 04:30 PM | Active | और देखें |
39. | Construction of Cycle stand near IInd vertical shaft premises at Chikla Mine(CIVIL/CH/T.E./21-22/1634) | 14-08-2021 | 28-08-2021 | 28-08-2021 | 28-08-2021 | 04:30 PM | Active | और देखें |
40. | Purchasing of plants soil and fertilizer for new Afforestation for the year 2021 22 at Chikla Mine(CIVIL/CH/T.E./21-22/707) | 14-08-2021 | 28-08-2021 | 28-08-2021 | 28-08-2021 | 04:30 PM | Active | और देखें |
41. | Afforestation for the year 2021 22 at green belt jone thickness 7.5 M Width along lease boundary area at Chikla village in chikla mine(CIVIL/CH/T.E./21-22/702) | 14-08-2021 | 28-08-2021 | 28-08-2021 | 28-08-2021 | 04:30 PM | Active | और देखें |
42. | Afforestation for the year 2021 22 at green belt jone thickness 7.5 M Width along lease boundary area at Sitasoangi village in Chikla mine(CIVIL/CH/T.E./21-22/704) | 14-08-2021 | 28-08-2021 | 28-08-2021 | 28-08-2021 | 04:30 PM | Active | और देखें |
43. | Protection and Maintenance of plantation for New plantation 21 22 for three Months of security for plantation area green belt jone thickness 7.5 M Width along lease boundary area at Chikla Mine(CIVIL/CH/T.E./21-22/706) | 14-08-2021 | 28-08-2021 | 28-08-2021 | 28-08-2021 | 04:30 PM | Active | और देखें |
44. | TENDER DOCUMENTS FOR LOWERING OF 3C X 240 SQMM. CU. CABLE FROM 12TH LEVEL TO 13.5TH LEVEL AND 3C X 95 SQMM. CU. CABLE FROM 12TH LEVEL TO 15TH LEVEL AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/651) | 13-08-2021 | 20-08-2021 | 20-08-2021 | 20-08-2021 | 03:30 PM | Active | और देखें |
45. | Construction of Jaw Crusher Foundation in Nagara Plant at Ukwa Mine(AGT/CIVIL/UK/LT/21-22/632) | 12-08-2021 | 19-08-2021 | 19-08-2021 | 19-08-2021 | 04:30 PM | Active | और देखें |
46. | Waterproofing by means of laying torch shield on roof of old B and C type quarters at Kandri Mine.(KAN/CIVIL/NIT/21-22/1459 DT 10.08.2021) | 10-08-2021 | 20-08-2021 | 20-08-2021 | 20-08-2021 | 04:30 PM | Active | और देखें |
47. | Drilling of bore and fixing of Casing pipe for lowering electrical cable from surface to I st level of U/g for operating machinery at Kandri Mine.(KAN/CIVIL/NIT/21-22/1458 DT 10.08.2021) | 10-08-2021 | 20-08-2021 | 20-08-2021 | 30-11--0001 | 04:30 PM | Active | और देखें |
48. | Maintenance of Various gardens at Kandri Mine.(KAN/CIVIL/NIT/21-22/1435 DT 08.08.2021) | 09-08-2021 | 17-08-2021 | 17-08-2021 | 17-08-2021 | 04:30 PM | Active | और देखें |
49. | Operation of Pumps at Beldongri Mine(BL/MECH/21-22/ 1095) | 09-08-2021 | 20-08-2021 | 20-08-2021 | 20-08-2021 | 04:30 PM | Active | और देखें |
50. | Major Repairing of Tata Cummins Engine B5.9 180 20 model of Tata 4018 Trailer Moil Ltd Balaghat mine.(AGENT/BGT/MECH/MG/21-22/622) | 09-08-2021 | 27-08-2021 | 27-08-2021 | 27-08-2021 | 04:30 PM | Active | और देखें |
51. | PROCUREMENT OF OF CARRYING, IMPACT AND RETURN ROLLERS FOR CONVEYOR BELTS AT IMB PLANT OF BALAGHAT MINE.(PUR/MOIL/BGT/IMB/ROL/21-22/624) | 09-08-2021 | 18-08-2021 | 18-08-2021 | 18-08-2021 | 04:30 PM | Active | और देखें |
52. | PROCUREMENT OF COLD VULCANIZING SOLUTION AND HARDENER FOR CONVEYOR BELTS JOINING WORKS AT IMB PLANT BALAGHAT MINE.(PUR/MOIL/BGT/IMB/SOL/21-22/623) | 09-08-2021 | 20-08-2021 | 20-08-2021 | 20-08-2021 | 04:30 PM | Active | और देखें |
53. | FABRICATION OF GRIZZLY SEGEMENTS 8 NOS FOR IMB PLNAT AT DONGRI BUZURG MINE(DB/MECH/21-22/660) | 08-08-2021 | 02-09-2021 | 02-09-2021 | 02-09-2021 | 04:30 PM | Active | और देखें |
54. | Jigging washing and collection of reject ore from IMB Plant at Dongri Buzurg Mine(DB/SUR/21-22/1520) | 07-08-2021 | 14-08-2021 | 14-08-2021 | 14-08-2021 | 03:30 PM | Active | और देखें |
55. | Repairing Bucket Assy-6 nos of PC 450-1 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/21-22/JGM(MECH)/642) | 03-08-2021 | 27-08-2021 | 27-08-2021 | 27-08-2021 | 04:30 PM | Active | और देखें |
56. | Procurement of four numbers of SIEMENS Simatic ET 200SP Interface Modules for Chikla Mine(CH/ELECT/21-22/646) | 03-08-2021 | 14-09-2021 | 14-09-2021 | 14-09-2021 | 04:30 PM | Active | और देखें |
57. | Replacement of 6 mm/8mm/10 mm thick liner plates at 14.5 level loading station of Production shaft at Balaghat Mine(AGT/BGT/MECH/WIN/21-22/601) | 02-08-2021 | 10-08-2021 | 10-08-2021 | 10-08-2021 | 04:30 PM | Active | और देखें |
58. | Fabrication of 2 Nos of Vertical Brake Tie Rod for Holmes shaft Skip Winder at Balaghat Mine(AGENT/BGT/MECH/WIN/21-22/602) | 02-08-2021 | 23-08-2021 | 23-08-2021 | 23-08-2021 | 04:30 PM | Active | और देखें |
59. | Construction of first floor at new Medical Administrative Building along with site development work at MOIL Nagpur(MOIL/21-22/ET/57) | 02-08-2021 | 03-09-2021 | 03-09-2021 | 03-09-2021 | 03:30 PM | Active | और देखें |
60. | Construction of D.G.Set, Chimney foundation, switch and breaker room and shed over D.G.set at Balaghat Mine(MOIL/21-22/ET/56) | 02-08-2021 | 01-09-2021 | 01-09-2021 | 01-09-2021 | 03:30 PM | Active | और देखें |
61. | Laying of HDPE pipeline (OD-280 mm) for high head slurry pump at D.B.Mine for monsoon dewatering(MOIL/DB/MECH/2021-2022/628) | 31-07-2021 | 10-08-2021 | 10-08-2021 | 10-08-2021 | 04:30 PM | Active | और देखें |
62. | Supply of front caliper brake liners for BEML make BH60M dumper no 1 and no 2 Operating at Dongri Buzurg Mine(MOIL/PUR/DB/MECH/2021-2022/629) | 31-07-2021 | 10-08-2021 | 10-08-2021 | 10-08-2021 | 04:30 PM | Active | और देखें |
63. | e-procurement of ERW Steel Pipe(PUR/MOIL/C-1/197/WE-07/ET/64) | 31-07-2021 | 06-08-2021 | 06-08-2021 | 06-08-2021 | 03:30 PM | Active | और देखें |
64. | PURCHASE OF MISCELANEOUS ITEMS, WELDING ACCESSORIES , EMERY TAPE, WHITE CHINDI, GRINDING WHEEL ETC FOR GR-I BALAGHAT MINE(PUR/MOIL/BGT/ C CLASS/21-22/590) | 29-07-2021 | 19-08-2021 | 19-08-2021 | 19-08-2021 | 04:30 PM | Active | और देखें |
65. | Fabrication of Hose Fittings required in Underground at Balaghat Mine(AGT/BGT/MECH/HOSE FITTINGS/21-22/562) | 28-07-2021 | 18-08-2021 | 18-08-2021 | 18-08-2021 | 04:30 PM | Active | और देखें |
66. | PURCHASE OF SPARES FOR EIMCO ELECON MAKE SIDE DISCHARGE LOADER (SDL).(PUR/MOIL/C-5/ 27 /E- 52/ 72-M,Dt.27.07.2021) | 27-07-2021 | 05-08-2021 | 05-08-2021 | 06-08-2021 | 03:30 PM | Active | और देखें |
67. | PURCHASE OF SPARES FOR EIMCO ELECON MAKE SIDE DISCHARGE LOADER (SDL).(PUR/MOIL/C-5/ 27 /E- 52/ 72-M,Dt.27.07.2021) | 27-07-2021 | 05-08-2021 | 05-08-2021 | 06-08-2021 | 03:30 PM | Active | और देखें |
68. | e-Procurement of Diamond Drill Bits and Reamer Shells(PUR/MOIL/C-12/WE-02/ET/63) | 27-07-2021 | 16-08-2021 | 16-08-2021 | 17-08-2021 | 03:30 PM | Active | और देखें |
69. | Purchase of Roller For Conveyor Belt(DB/PUR/JGM/AGT/2021-22/589) | 26-07-2021 | 24-08-2021 | 24-08-2021 | 24-08-2021 | 04:30 PM | Active | और देखें |
70. | Shifting of Main ventilation fan from 160 level to 60 level of Chikla B section at Chikla Mine(CIVIL/CH/T.E./21-22/1439) | 26-07-2021 | 10-08-2021 | 10-08-2021 | 10-08-2021 | 04:30 PM | Active | और देखें |
71. | e-Procurement of Diamond Drilling Accessories(PUR/MOIL/C-12/23/WE-06/ET/62) | 22-07-2021 | 17-08-2021 | 17-08-2021 | 18-08-2021 | 03:30 PM | Active | और देखें |
72. | Cleaning of ROM recovered from North side of 5 No. Pit and Pit No.6 at Sitapatore Sukli Mine(MOIL/21-22/ET/59) | 20-07-2021 | 20-08-2021 | 20-08-2021 | 20-08-2021 | 03:30 PM | Active | और देखें |
73. | Repairing of Bucket Assy 5.6 CuM--4 NOS of Tata Hitachi 1200-3Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/21-22/JGM(MEC)/551) | 19-07-2021 | 27-07-2021 | 27-07-2021 | 27-07-2021 | 04:30 PM | Active | और देखें |
74. | Repairing of Bucket Assy of Tata Hitachi 450-1 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/21-22/JGM(MEC)/550) | 19-07-2021 | 27-07-2021 | 27-07-2021 | 27-07-2021 | 04:30 PM | Active | और देखें |
75. | Renovation of Holmes Shaft by replacing Buntons, Ladders, Platform and Fencing from surface to 12th Level at Balaghat Mine(MOIL/21-22/ET/54) | 19-07-2021 | 19-08-2021 | 19-08-2021 | 19-08-2021 | 03:30 PM | Active | और देखें |
76. | Design , Manufacturing and supply of New Double Helical Gear 1 No for the pinion shaft of Production shaft winding engine at Balaghat Mine.(AGENT/BGT/MECH/PS/21-22/516) | 16-07-2021 | 05-08-2021 | 05-08-2021 | 05-08-2021 | 04:30 PM | Active | और देखें |
77. | Renovation of Production Shaft by replacing Guide Rails at Balaghat Mine(MOIL/21-22/ET/55) | 16-07-2021 | 16-08-2021 | 16-08-2021 | 16-08-2021 | 03:30 PM | Active | और देखें |
78. | Drilling of 1 No. Bore Hole for Drinking Water Supply to Camp quarters near Dump (OCF) at Beldongri Mine(Civil/Bel/2021-22/886) | 15-07-2021 | 21-07-2021 | 21-07-2021 | 21-07-2021 | 04:30 PM | Active | और देखें |
79. | e-procurement of Safety Helmet(PUR/MOIL/C-1/189/WE-05/ET/61) | 15-07-2021 | 16-08-2021 | 16-08-2021 | 17-08-2021 | 03:30 PM | Active | और देखें |
80. | PURCHASE OF ROTATING ASSEMBLY FOR KIRLOSKA60 HP PUMP FOR IMB PLANT AT DONGRI BUZURG MINE(DB/MECH/21-22/MECH/397) | 13-07-2021 | 05-08-2021 | 05-08-2021 | 05-08-2021 | 04:30 PM | Active | और देखें |
81. | Fabrication Casting and Machining of Brass impeller Set of 120HP Mather and Platt multistage pump at Balaghat Mine(AGENT/BGT/MECH/PUMP/21-22/496) | 13-07-2021 | 27-07-2021 | 27-07-2021 | 27-07-2021 | 04:30 PM | Active | और देखें |
82. | Comprehensive Annual Maintenance Contract (CAMC) of Computers, Printers, UPSs installed at Balaghat Mine(BGT/SYSTEM/AMC/2021-22/487) | 12-07-2021 | 26-07-2021 | 26-07-2021 | 26-07-2021 | 04:00 PM | Active | और देखें |
83. | Comprehensive Annual Maintenance Contract of Computers, Printers, UPSs installed at Tirodi and Sitapatore Mine(BGT/SYSTEM/AMC/2021-22/488) | 12-07-2021 | 26-07-2021 | 26-07-2021 | 26-07-2021 | 04:00 PM | Active | और देखें |
84. | Purchase of Pipefitting, Manila Rope, Nylon Rope , Packing etc. for Gr-I Balaghat Mine.(PUR/MOIL/BGT/C CLASS/21-22/471) | 10-07-2021 | 29-07-2021 | 29-07-2021 | 29-07-2021 | 04:30 PM | Active | और देखें |
85. | OPERATION OF PUMPS FOR DRINKING WATER SUPPLY IN CAMP AREA AND OFFICER COLONY AT KANDRI MINE.(KAN/CIVIL/NIT/21-22/1077 DT 07.07.2021) | 09-07-2021 | 17-07-2021 | 17-07-2021 | 17-07-2021 | 04:30 PM | Active | और देखें |
86. | Purchase of Fasteners High Tension Bolts, Mild Steel Bolts, Wire Nails, Rose Nails, Teflon Tape ,M seal, Araldite , Holdite etc. for Gr-I Balaghat Mine(PUR/MOIL/BGT/C CLASS/21-22/470) | 09-07-2021 | 29-07-2021 | 29-07-2021 | 29-07-2021 | 04:30 PM | Active | और देखें |
87. | FABRICATION/PROCUREMENT OF PNEUMATIC CYLINDERS FOR HOLMES SHAFT 100 MT BUNKER GATE 2 NOS. AND FINGER GATE 2 NOS. OF ORE PASS AT BALAGHAT MINE.(PUR/MOIL/BGT/WINDER/21-22/465) | 08-07-2021 | 28-07-2021 | 28-07-2021 | 28-07-2021 | 04:30 PM | Active | और देखें |
88. | Interior and Exterior Painting works in Mine Manager Bungalow at Ukwa Mine(AGT/CIVIL/UK/LT/21-22/434) | 07-07-2021 | 17-07-2021 | 17-07-2021 | 17-07-2021 | 04:30 PM | Active | और देखें |
89. | REGULAR CLEANING UNBLOCKING OF MAIN BUNCKER ORE FLOW IN IMB PLANT AT DONGI BUZURG MINE(DB/MECH/21-22/JGM(MECH)/483) | 05-07-2021 | 10-07-2021 | 10-07-2021 | 10-07-2021 | 04:30 PM | Active | और देखें |
90. | Cons of additional transformer room at Ukwa Mine(Civil/UK/LT/21-22/710 Date 03.07.2021) | 05-07-2021 | 14-07-2021 | 14-07-2021 | 14-07-2021 | 04:30 PM | Active | और देखें |
91. | OUTSOURCING OF MAINTENANCE, DISTRIBUTION AND COLLECTION OF CAPLAMP FOR TWO MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/436) | 05-07-2021 | 12-07-2021 | 12-07-2021 | 12-07-2021 | 03:30 PM | Active | और देखें |
92. | Purchase of Black Gitti for UG concreting at Kandri Mine(KD/MINES/NIT/2021-22/ 1046) | 05-07-2021 | 14-07-2021 | 14-07-2021 | 14-07-2021 | 04:30 PM | Active | और देखें |
93. | Operation and Maintenance of new cells at EMD Plant Dongri Buzurg Mine(MOIL/DB/EMD/AJGM/TE /21-22/442) | 29-06-2021 | 10-07-2021 | 10-07-2021 | 10-07-2021 | 04:30 PM | Active | और देखें |
94. | Cleaning of Crushing Plant ROM By sorting, sizing and stacking at Munsar Mine(Munsar/Mining/LT/2021-22/50 Date 29.06.2021) | 29-06-2021 | 06-07-2021 | 06-07-2021 | 06-07-2021 | 04:30 PM | Active | और देखें |
95. | Comprehensive Annual Maintenance Contract (CAMC) of 127 Nos. of Air-Conditioners of MOIL Ltd Nagpur(MOIL/21-22/ET/52) | 29-06-2021 | 28-07-2021 | 28-07-2021 | 28-07-2021 | 03:30 PM | Active | और देखें |
96. | Purchase of DOLOMITE with Transportation - 4000 MT(MOIL/21-22/ET-04 dt.28.06.2021) | 28-06-2021 | 07-07-2021 | 07-07-2021 | 08-07-2021 | 03:30 PM | Active | और देखें |
97. | Annual repairs to camp quarters at Gumgaon Mine.(MOIL/21-22/ET/28) | 28-06-2021 | 27-07-2021 | 27-07-2021 | 27-07-2021 | 03:30 PM | Active | और देखें |
98. | Engagement of Architect and design engineering firm for Construction of residential quarters at various Mines Phase IV(MOIL/21-22/ET/30) | 28-06-2021 | 27-07-2021 | 27-07-2021 | 27-07-2021 | 03:30 PM | Active | और देखें |
99. | Operation of Pumps for dewatering at both Satak open pit(BEL/MECH/21-22/708) | 25-06-2021 | 05-07-2021 | 05-07-2021 | 05-07-2021 | 04:30 PM | Active | और देखें |
100. | Manufacturing of New Input Pinion shaft 1 No. for the Gear Train Unit in Production shaft winding engine at Balaghat Mine(AGENT/BGT/MECH/PS /21-22/380) | 25-06-2021 | 15-07-2021 | 15-07-2021 | 15-07-2021 | 04:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.5.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2025) वर्ष के निविदाएं देखें |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |