S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Fabrication of STEEL MANWAYS-1.5X0.84M For Ukwa Mine(AJGM/UK/MECH/2024-25/122) 30-04-2024 08-05-2024 08-05-2024 08-05-2024 04:30 PM Active View
2. Drilling of Production holes at 8L North ,9 L North Balaghat Mine(MINING/BGT/LTE/24-25/130 Dt 30.04.2024) 30-04-2024 08-05-2024 08-05-2024 08-05-2024 04:30 PM Active View
3. Making of Artificial pillar of RCC at 12th level north section Balaghat Mine(MINING/BGT/LTE/24-25/396 Dt 30.04.2024) 30-04-2024 08-05-2024 08-05-2024 08-05-2024 04:30 PM Active View
4. Repairing of RH Travelling device of Hydraulic Excavator Tata Hitachi-220 deployed at Balaghat Mine.(AGT/BGT/MECH/EXC/24-25/116) 29-04-2024 07-05-2024 07-05-2024 07-05-0024 04:30 PM Active View
5. Repairing of Bhatera pipe line between Boda and Tawejhari village beside Railway track at Balaghat Mine(CIVIL/BGT/LTE/24-25/114 Dt 29.04.2024) 29-04-2024 07-05-2024 07-05-2024 07-05-2024 04:30 PM Active View
6. Fabrication of steel hopper and mixing chamber for new sand stowing plant at Chikla-B for Chikla.(CH/Mech/24-25/76-30535/231/84) 26-04-2024 02-05-2024 02-05-2024 02-05-2024 04:30 PM Active View
7. OUTSOURCING OF SKILLED MANPOWER ELECTRICIAN FOR MAINTENANCE OF ELECTRICAL INSTALLAION IN UDERGROUND AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/24-25/99) 26-04-2024 07-05-2024 07-05-2024 07-05-2024 03:30 PM Active View
8. Dismantling of major Components, Shifting and Lowering to 7th and 2nd Level Underground assembling and Commissioning of 1 nos. new Load Haul Dump(LHD) Loader each at both Levels of Ukwa Mine(AJGM/UK/MECH/2024-25/102) 25-04-2024 02-05-2024 02-05-2024 02-05-2024 04:30 PM Active View
9. Garbage disposal, drain cleaning,grass cutting and other sanitation work at Tirodi Mine.(MOIL/TRD/pers/24-25/128 DATED 24/04/2024) 24-04-2024 29-04-2024 29-04-2024 29-04-2024 04:00 PM Active View
10. cleaning underground sump drain at munsar mine(MUN/TENDER/24-25/96) 22-04-2024 27-04-2024 27-04-2024 27-04-2024 04:30 PM Active View
11. Providing and Applying weather shield paint, Interior emulsion and oil paint to MOIL VT Center building at Munsar Mine(AGT/GUM/CIVIL/LT/24-25/102) 22-04-2024 29-04-2024 29-04-2024 29-04-2024 04:30 PM Active View
12. Drilling of Muck generation hole for production at -30 Level at Munsar Mine.(AGT/MUN/MIN/LT/24-25/103) 22-04-2024 29-04-2024 29-04-2024 29-04-2024 04:30 PM Active View
13. Recover SM grade Ore Underground sub grade mineral rejects Mn rock at Munsar Mine(AGT/MUN/MIN/NIT/24-25/121) 22-04-2024 29-04-2024 29-04-2024 29-04-2024 04:30 PM Active View
14. Drilling of Bore Hole 110mm(Diameter)5nos (30 Meters each)150RMT at 2nd level(MUN/TENDER/24-25/98) 22-04-2024 27-04-2024 27-04-2024 27-04-2024 04:30 PM Active View
15. Ancillary Works for Crusher Unit installed at BDC Section, Dongribuzurg Mine(DB/CIVIL/NIT/TE/2024-25/47 Date 16.04.24) 18-04-2024 23-04-2024 23-04-2024 23-04-2024 04:30 PM Active View
16. Development Works towards making of approach ramps, drains around Slime Pond near Integrated Manganese Beneficiation Plant, Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2024-25/ Date 16.04.2024) 18-04-2024 26-04-2024 26-04-2024 26-04-2024 04:30 PM Active View
17. Providing and laying 1 GI pipeline for drinking water with accessories as per inset level of 2nd Vertical shaft of Ukwa Mine(AJGM/UK/MECH/2024-25/86) 18-04-2024 25-04-2024 25-04-2024 25-04-2024 04:30 PM Active View
18. Repairing of lubi make 40HP and 15HPN Submersible Pump of Ukwa Mine.(AJGM/UK/MECH/2024-25/85) 18-04-2024 25-04-2024 25-04-2024 25-04-2024 04:30 PM Active View
19. The transportation of sand from Kanhan River to the area near Rest House.(Agent/Gum/Min/24-25/90, date 17.04.2024) 17-04-2024 29-04-2024 29-04-2024 29-04-2024 04:30 PM Active View
20. Formation of base foundation for installation of Chock in underground faces.(Gum/Min/24-25/191, date 17.04.2024) 17-04-2024 27-04-2024 27-04-2024 27-04-2024 04:30 PM Active View
21. Making of garland drain along various waste dumps at Tirodi Mine.(TRD/CIVIL/2023-24/2049 DATED 21/01/2024) 17-04-2024 23-04-2024 23-04-2024 23-04-2024 04:00 PM Active View
22. Construction of stone masonry wall along South and North waste dump at Tirodi Mine.(TRD/CIVIL/2023-24/2048 DATED 21/03/2024) 17-04-2024 23-04-2024 23-04-2024 23-04-2024 04:00 PM Active View
23. Making of garland drain along various waste dumps at Sitapatore Mine.(MOIL/SP/Civil/2023-24/2050 Dated 21/03/2024) 17-04-2024 23-04-2024 23-04-2024 23-04-2024 04:00 PM Active View
24. EXTRA EXCAVATION IN 2ND LEVEL AT MUNSAR MINE(MUN /TENDER/24-25/100) 17-04-2024 24-04-2024 24-04-2024 24-04-2024 04:30 PM Active View
25. PRINTING OF VARIOUS FORMS, FORMATS AND REGISTER FOR CHIKLA MINE.(CH/TE/PERS/24-25/30 DATE-08.04.2024) 16-04-2024 27-04-2024 27-04-2024 27-04-2024 03:30 PM Active View
26. DEVELOPMENT OF GARDEN IN FRONT OF ADMINISTRATIVE BUILDING AT CHIKLA MINE.(CH/CIVIL/NIT/24-25/57 DATE-15.04.2024) 16-04-2024 27-04-2024 27-04-2024 27-04-2024 04:30 PM Active View
27. Cleaning of accumulated sand from -50L at Kandri Mine(KD/MINES/NIT/2024-25/112) 13-04-2024 04-05-2024 04-05-2024 04-05-2024 04:30 PM Active View
28. Cleaning of accumulated sand incline to from -150L at Kandri Mine(KD/MINES/NIT/2024-25/115) 13-04-2024 06-05-2024 06-05-2024 06-05-2024 04:30 PM Active View
29. Supply, Installation, Commissioning of Wired Networking Equipment with necessary accessories/equipment for Re-setup of LAN of Admin Building at Ukwa Mine(AGT/UK/SYS/NETWORK/2024-25/65) 12-04-2024 27-04-2024 27-04-2024 27-04-2024 04:00 PM Active View
30. REPAIR AND REWINDING OF 80V, 7.5KW, 10HP DC SERIES MOTOR OF BALAGHAT MINE 2 NOS.(BGT/TE/ELECT/AJGM/24-25/62) 12-04-2024 02-05-2024 02-05-2024 02-05-2024 03:30 PM Active View
31. Annual repair work of School Bus MH40N3405 of kandri Mine(Mech/KD/24-25/107) 11-04-2024 04-05-2024 04-05-2024 04-05-2024 04:30 PM Active View
32. Dismantling of existing 30lb Tram line of pit top and laying of 60lb Tram line and Fabrication of 60lb rail LH and diamond crossing(Mech/KD/24-25/94) 11-04-2024 30-04-2024 30-04-2024 30-04-2024 04:30 PM Active View
33. Overhauling Centrifugal Pump Kirloskar 150HP second level(Mech/KD/24-25/105) 10-04-2024 01-05-2024 01-05-2024 01-05-2024 04:30 PM Active View
34. Miscellaneous civil works for Slime pond at Nagra plant of Ukwa Mine.(AGT/CIVIL/UK/LT/2024-25/15 DT. 09/04/2024) 09-04-2024 15-04-2024 15-04-2024 15-04-2024 04:30 PM Active View
35. providing, supplying and installing fire fighting system FMP, balaghat mine(TE/MOIL/AGT/FMP/ELECT/24-25/08) 08-04-2024 25-04-2024 25-04-2024 25-04-2024 04:25 PM Active View
36. Purchase of spring Steel Mesh Wire Panel for 6mm and 25mm Vibrating Screen of IMB plant of Balaghat Mine.(PUR/MOIL/BGT/IMB/24-25/16) 08-04-2024 22-04-2024 22-04-2024 22-04-2024 04:30 PM Active View
37. PURCHASE OF SPARES FOR AIR AND WATER COOLED COMPRESSORS FOR KANDRI MINE(PUR/MOIL/KD/MECH/01) 08-04-2024 27-04-2024 27-04-2024 27-04-2024 04:30 PM Active View
38. Hiring of JCB Machine with Tolley Breaker at Tirodi Mine.(MOIL/TRD/MINE/2024/257 dated - 23/03/2024) 08-04-2024 15-04-2024 15-04-2024 15-04-2024 04:00 PM Active View
39. Stripping of ore body, loading of blasted muck and pushing of loaded tubs upto haulage Road and supporting of the stripping Area.(MUN/TENDER/24-25/43) 08-04-2024 15-04-2024 15-04-2024 15-04-2024 04:30 PM Active View
40. Construction of boundary wall for Existing school building at Ukwa Mine.(AGT/CIVIL/UK/LT/2024-25/13 DT. 08/04/2024) 08-04-2024 15-04-2024 15-04-2024 15-04-2024 04:30 PM Active View
41. Construction of ventilation fan room for 2nd vertical shaft of ukwa mine.(AGT/CIVIL/UK/LT/2024-25/14 DT. 08/04/2024) 08-04-2024 15-04-2024 15-04-2024 15-04-2024 04:30 PM Active View
42. Supply of Spears for TR Bearing, 30209 for Tub Trolley maintenance.(CH/MECH/24-25/10009732/14) 08-04-2024 17-04-2024 17-04-2024 17-04-2024 04:30 PM Active View
43. Repairing to Old Gantry wall with stone Masonry at Siding Premises at Kandri Mine(CIVIL/KD/T.E./24-25/24 26.04.2024) 06-04-2024 26-04-2024 26-04-2024 26-04-2024 04:30 PM Active View
44. Requirement of Spares for 150HP Mather and Platt Make Pump Model ET ISO32 0 150X125 500 for BALAGHAT MINE(PUR/BGT/PUMP/24-25/18) 06-04-2024 26-04-2024 26-04-2024 26-04-2024 04:30 PM Active View
45. purchase of Button Bit for FRD DCR 20 DRILL MACHINE for Dongri Buzurg Mine(PUR/MOIL/DB/2024-25/24) 05-04-2024 11-04-2024 11-04-2024 11-04-2024 04:30 PM Active View
46. Flushing of Septic Tanks, Inspection Chambers and conveying pipeline of Sewage System of Chandmara Colony, Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/ 31.03.2024) 05-04-2024 10-04-2024 10-04-2024 10-04-2024 04:30 PM Active View
47. De-silting and cleaning of sump and surrounding area of sump at 13L, 100L, 200L, 300L and 400L.(Agent/Gum/Min/24-25/17, date 03.04.2024) 03-04-2024 15-04-2024 15-04-2024 15-04-2024 04:30 PM Active View
48. Hiring of equipment for removal of waster rock and handeling the same by mechanized means at uderground area,south section with drilling and blasting at Tirodi Mine.(MOIL/TRD/MINE/2024/211/2067 DATED 10/03/2024) 02-04-2024 09-04-2024 09-04-2024 09-04-2024 04:00 PM Active View
49. Repairing and servicing of Air After cooler and Oil cooler of IR Compressor and Godrej compressor.(CH/Mech/23-24/76-30097/1924) 02-04-2024 09-04-2024 09-04-2024 09-04-2024 04:30 PM Active View
50. Major Overhaul of Engine of L and T make Loader at Chikla Mine.(CH/Mech/23-24/76-30443/1928) 02-04-2024 09-04-2024 09-04-2024 09-04-2024 04:30 PM Active View
51. Repairing of 4 Stage Hydraulic Pump and feed motor of Universal Drill Machine operating at 4TH Level(CH/MECH/23-24/76-30072/1925) 02-04-2024 16-04-2024 16-04-2024 16-04-2024 04:30 PM Active View
52. LANDSCAPE WORKS COMPRISING OF LAYING OF TURF TOWARDS DEVELOPMENT OF LAWN SPACE INSIDE AGENTS BUNGALOW CHIKLA MINE.(CH/CIVIL/NIT/23-24/04 DATE-01.04.2024) 02-04-2024 16-04-2024 16-04-2024 16-04-2024 04:30 PM Active View
53. Purchase of Spares for TATA make Tipper of Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2023-24/1910) 01-04-2024 23-04-2024 23-04-2023 23-04-2023 04:30 PM Active View
54. Purchase of Spares for TATA make Tipper of Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2023-24/1910) 01-04-2024 23-04-2024 23-04-2024 23-04-2024 04:30 PM Active View
55. Pro and fit RVA and Seat Belt reminder with human voice of Excavator Dumper and Tipper at TRD Mine(MOIL/TRD/ME/GEN/2024/139/2093 DT-28.03.2024) 01-04-2024 10-04-2024 10-04-2024 10-04-2024 03:30 PM Active View
56. Maintenance and repair of L.T and H.T. overhead line at Chikla Mine.(AGENT/GR-II/ELECT/23-24/1929) 01-04-2024 15-04-2024 15-04-2024 15-04-2024 04:30 PM Active View
57. Providing supplying and installation of 79 Mtr. radius Lightening Arrester.(AGENT/GR-II/ELECT/23-24/1936) 01-04-2024 15-04-2024 15-04-2024 15-04-2024 04:30 PM Active View
58. Fabrication of Pump Spares by Pattern Making, Casting and Machining work for 240 HP Kirloskar Make Multistage Pump of Balaghat Mine.(AGT/BGT/MECH/PUMP/23-24/2107) 30-03-2024 22-04-2024 22-04-2024 22-04-2024 04:30 PM Active View
59. Ultrasonic and Magnetic Particle NDT Testing of CSG Components of all Winders for one year at Balaghat Mine.(AGT/BGT/MECH/WINDER/23-24/2108) 30-03-2024 22-04-2024 22-04-2024 22-04-2024 04:30 PM Active View
60. Underground Sump cleaning including drain at Chikla Mine.(Mining/CH/T.E./23-24/1912) 30-03-2024 06-04-2024 06-04-2024 06-04-2024 04:30 PM Active View
61. Hiring front end loader to draw back the sub grade mineral reject within7.5 meters of mine lease boundary at Balaghat Mine(MINING/BGT/LTE/23-24/2095 Dt 29.03.2024) 29-03-2024 05-04-2024 05-04-2024 05-04-2024 04:30 PM Active View
62. SPARES FOR INDUS ROCK TOOL MAKE DRILL MACHINE IRB 400 FOR TIRODI MINE(MOIL/HO/MECH/GEN/2024/134/2081 DT- 27.03.2024) 29-03-2024 05-04-2024 05-04-2024 05-04-2024 03:30 PM Active View
63. Proposal for Major repairing of bucket PC450 AND TATA220 Hyd Excavator at Tirodi Mine(MOIL/TD01/ME/GEN/2024/139/2092 DT-28.03.2024) 29-03-2024 06-04-2024 06-04-2024 06-04-2024 03:30 PM Active View
64. Misc works for firefighting arrangement in 33 KV substation at Balaghat Mine(CIVIL/BGT/LTE/23-24/2100 Dt 29.03.2024) 29-03-2024 05-04-2024 05-04-2024 05-04-2024 04:30 PM Active View
65. Replacement of sand filter of water filtration plant at Balaghat Mine(CIVIL/BGT/LTE/23-24/2103 Dt 29.03.2024) 29-03-2024 05-04-2024 05-04-2024 05-04-2024 04:30 PM Active View
66. Transportation of Unloading of ROM/Rock tubs at Beldongri Mine.(AGT/MINE/BEL/2023-24/1995 Dt.27.03.2024) 28-03-2024 04-04-2024 04-04-2024 04-04-2024 04:30 PM Active View
67. Purchase of Rotating assy DSM5 for Kirloskar make DSM80/36 (60HP) Centrifugal pump of IMB plant of D.B.Mine.(PUR/MOIL/DB/23-24/1911) 28-03-2024 18-04-2024 18-04-2024 18-04-2024 04:30 PM Active View
68. Providing and fitting of safety device in HEMM/vehicles of Ukwa Mine(AJGM/UK/MECH/2023-24/2082) 28-03-2024 03-04-2024 03-04-2024 03-04-2024 04:30 PM Active View
69. Providing and laying 2 GI pipeline with sockets as per ground level from 4300 CH section to vertical for operation of Niagra Plant at Ukwa Mine(AJGM/UK/MECH/2023-24/2083) 28-03-2024 03-04-2024 03-04-2024 03-04-2024 04:30 PM Active View
70. Exploratory drill at various places of mine area,Tirodi Mine.(TRD/CIVIL/2023-24/2018 DATED 18/03/2024) 28-03-2024 04-04-2024 04-04-2024 04-04-2024 04:00 PM Active View
71. Fabrication and erection of conveyor belt structure, shifting and installation of 30Hp Haulage at 12000Ch section Underground at Ukwa Mine.(AJGM/UK/MECH/2023-24/2063) 28-03-2024 04-04-2024 04-04-2024 04-04-2024 04:30 PM Active View
72. Purchase of AVTEC 6610M Transmission filters for BEML make BH60 M dumpers.(PUR/MOIL/DB/2023-24/1914) 28-03-2024 17-04-2024 17-04-2024 17-04-2024 04:30 PM Active View
73. Repairing of Scrubber Fan assembly at EMD Plant, Dongri Buzurg Mine(MOIL/DB/EMD/ADGM/23-24/1899) 28-03-2024 10-04-2024 10-04-2024 10-04-2024 04:30 PM Active View
74. Miscellaneous works at Administrative Building,Security quarter and Meeting Hall at Sitapatore Mine.(TRD/CIVIL/2023-24/2017 DATED 18/03/2024) 27-03-2024 03-04-2024 03-04-2024 03-04-2024 04:00 PM Active View
75. Providing, fabricating and fixing box ladies ladies urinal in mine area at Tirodi Mine.(TRD/CIVIL/2023-24/2016 DATED 18/03/2024) 27-03-2024 03-04-2024 03-04-2024 03-04-2024 04:00 PM Active View
76. Construction of Panel room at south bed at Tirodi Mine.(TRD/CIVIL/2023-24/2015 DATED 18/03/2024) 27-03-2024 03-04-2024 03-04-2024 03-04-2024 04:00 PM Active View
77. Removal of suppressed muck from Ch. 25 to Ch 40 at 10th L North Balaghat Mine(MINING/BGT/LTE/23-24/2080 Dt 27.03.2024) 27-03-2024 04-04-2024 04-04-2024 04-04-2024 04:30 PM Active View
78. WATER PROOFING BY MEANS OF LAYING TORCH SHIELD ON OLD RCC ROOF OF KHOSLA COMPRESSOR, CAP LAMP ROOM AND PANEL ROOM AT 1ST AND 2ND VERTICAL SHAFT PREMISES AT CHIKLA MINE.(CH/CIVIL/NIT/23-24/1891 DATE-24.03.2024) 26-03-2024 06-04-2024 06-04-2024 06-04-2024 04:30 PM Active View
79. Procurement of 385 Cu. Mtrs. of Dissolved Acetylene Gas Cylinders for the Balaghat Mine.(PUR/BGT/DA-CYL/23-24/2060) 25-03-2024 01-04-2024 01-04-2024 01-04-2024 04:30 PM Active View
80. PROVIDING, SUPPLYING, STRINGING PAVING OF ACSR CONDUCTOR OF 33KV OVERHEAD LINE(BGT/TE/ELECT/AJGM/23-24/2057) 25-03-2024 05-04-2024 05-04-2024 05-04-2024 03:30 PM Active View
81. Fabrication of Bearing Plates of Roof Bolts for the year 2024 for Balaghat Mine.(AGT/BGT/MECH/RB/23-24/2062) 25-03-2024 15-04-2024 15-04-2024 15-04-2024 04:30 PM Active View
82. Overhauling of Hydraulic Pump and Charging Pump of LHD Machine of Balaghat Mine(AGT/MECH/LHD-PUMP/23-24/2061) 25-03-2024 15-04-2024 15-04-2024 15-04-2024 04:30 PM Active View
83. Comprehensive Annual Maintenance Contract (CAMC) of computer hardware and peripherals(ADGM/Grp3/Sys/AMC/2023-24/1975) 23-03-2024 03-04-2024 03-04-2024 03-04-2024 04:00 PM Active View
84. Laying of Alternate Line in between Septic Tanks and Sewage Treatment Plant, Cleaning Works and allied civil works for STP of Chandmara Colony, Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/ Date 22.03.2024) 22-03-2024 30-03-2024 30-03-2024 30-03-2024 04:30 PM Active View
85. Drain beside Septic Tanks to facilitate overflow for Sewage Treatment Plant, STP of Chandmara Colony Dongribuzurg Mine.(DB/CIVI/NIT/TE/2023-24/ Date 22.03.24) 22-03-2024 30-03-2024 30-03-2024 30-03-2024 04:30 PM Active View
86. Cleaning and uprooting unwanted weeds, repair barbed wire fencing and allied Civil works at Magazine at Dongri-Buzurg Mine(DB/CIVIL/NIT/TE/2023-24/ 20.03.2024) 21-03-2024 30-03-2024 30-03-2024 30-03-2024 04:30 PM Active View
87. Waterproofing work of Toilet and Bathroom Portion of A Type Staff Quarters at Syndicate Colony and Chandmara Colony at Dongri-Buzurg Mine.(DB/CIVIL/NIT/TE/2023-24/ Dt 20.03.2024) 21-03-2024 30-03-2024 30-03-2024 30-03-2024 04:30 PM Active View
88. Distribution, collection, maintenance and cleaning of cap.(AGENT/GR-II/ELECT/23-24/1868) 21-03-2024 23-03-2024 23-03-2024 23-03-2024 04:30 PM Active View
89. Providing and fixing of Aluminium Sliding windows and ventilations in Existing school building at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/2024 DT. 20.03.2024) 20-03-2024 23-03-2024 23-03-2024 23-03-2024 04:30 PM Active View
90. Landscaping and beautification work at Existing School Building at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/2025 DT. 19.03.2024) 19-03-2024 23-03-2024 23-03-2024 23-03-2024 04:30 PM Active View
91. Construction of Bituminous Tar Road from Gate No 1 to Canteen and from Mine Entrance Gate via DAV Public School towards Katangi Highway at Chikla Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/3) 19-03-2024 25-04-2024 25-04-2024 25-04-2024 04:00 PM Active View
92. Construction of 1,00,000 litres and 30,000 Litres capacity Ground Storage industrial Effluent collection Tank along with pipe line Network at EMD Plant, Dongri Buzurg Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/2) 19-03-2024 18-04-2024 18-04-2024 18-04-2024 04:00 PM Active View
93. Maintenance and operation of water supply scheme at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/2027 DT. 19.03.2024) 19-03-2024 23-03-2024 23-03-2024 23-03-2024 05:30 PM Active View
94. Renovation of existing old Administrative Building at Chikla Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/1) 19-03-2024 25-04-2024 25-04-2024 25-04-2024 04:00 PM Active View
95. Purchase of Filters of CAT C13 ENGINE of FRD DCR 20 Drilling Machine operating at Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2023-24/1852) 18-03-2024 26-03-2024 26-03-2024 26-03-2024 04:30 PM Active View
96. PURCHASE OF FURNITURE FOR REST HOUSE of Gumgaon MINE(PUR/GUM/PER/23-24/ 1946) 18-03-2024 28-03-2024 28-03-2024 28-03-2024 04:30 PM Active View
97. Tub transportation from all level inset (U/g) to surface at 2nd vertical shaft.(AGT/MINING/UK/LT/2023-24/2023 DT. 18.03.202) 18-03-2024 23-03-2024 23-03-2024 23-03-2024 04:30 PM Active View
98. ALLIED WORKS AND LANDSCAPING WORKS FOR DEVELOPING CHILDREN PARK IN OFFICERS COLONY, CHIKLA MINE.(CH/Civil/NIT/23-24/1861 Date- 18.03.2024) 18-03-2024 01-04-2024 01-04-2024 01-04-2024 04:30 PM Active View
99. HIRING OF SERVICES OF ARCHITECT AND DESIGN ENGINEERS CONSULTANT FOR CONSTRUCTION OF NEW C TYPE QUARTERS - 16 UNITS AT CHIKLA MINE.(CH/Civil/NIT/23-24/1841 Date-14.03.2024) 18-03-2024 01-04-2024 01-04-2024 01-04-2024 04:30 PM Active View
100. Purchase of SHELL CORENA S3 R46 OIL FOR FRD DCR20 Drilling Machine of Dongri Buzurg Mine(PUR/MOIL/AGT/DB/2023-24/1812) 14-03-2024 20-03-2024 20-03-2024 20-03-2024 04:00 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.