निविदा संग्रह

Tender-Archive-2018

खोज के लिए शीर्षक निविदा जारी करने की तिथि निविदा जारी करने की अंतिम तिथि
क्रमांक शीर्षक अंक प्रारंभ दिनांक अंक अंतिम तिथी प्रस्तुत करने की अंतिम तिथि खुलने की तिथि खुलने का समय स्थिति और देखें
1. Additional excavation in Mangeniferous rock between Ch.33 to Ch.35 at 300 Level at Gumgaon Mine(MOIL/18-19/ET/374) 31-12-2018 31-01-2019 31-01-2019 31-01-2019 03:30 PM Active और देखें
2. Picking and collection of 20 percent SM Grade ore CHL 535 from cleaning of sub-grade mineral reject from ROM at Magazine Dump West side section of Chikla Mine(MOIL/18-19/ET/375) 31-12-2018 31-01-2019 31-01-2019 31-01-2019 03:30 PM Active और देखें
3. Transportation of sand from Kalaphata Ghat to Beldongri Mine(MOIL/18-19/ET/373) 31-12-2018 11-02-2019 11-02-2019 11-02-2019 03:30 PM Active और देखें
4. WASHING OF BOTTOM EMD AT EMD PLANT DONGRI BUZURG MINE(MOIL/EMD/CH/SDGM/18-19/527) 29-12-2018 08-01-2019 08-01-2019 09-01-2019 10:30 AM Active और देखें
5. Recovery of Reduced ore and EMD powder(MOIL/EMD/CH/SDGM/18-19/528) 29-12-2018 08-01-2019 08-01-2019 09-01-2019 10:30 AM Active और देखें
6. Supply, Fabrication, Erection, Installation and Commissioning of belt Conveyor Charging System at Ferro Manganese Plant, Balaghat Mine.(MOIL/18-19/ET/364) 27-12-2018 25-01-2019 25-01-2019 25-01-2019 03:30 PM Active और देखें
7. Removal of waste rock in the H W benches from Ch.39 to Ch.50 and handling the same by mechanized means at Dongri Buzurg Mine( MOIL/18-19/ET/369) 27-12-2018 28-01-2019 28-01-2019 28-01-2019 03:30 PM Active और देखें
8. Construction of stone pitching and RCC Ramp for Diesel Pump at Munsar Mine( MUN/CIVIL/NIT/18-19/144 DT 25.12.2018) 25-12-2018 05-01-2019 05-01-2019 05-01-2019 04:30 PM Active और देखें
9. Hiring of Excavator for cleaning of fines pond Niagara plant at Ukwa Mine( 16/Mining/UM/18-19/1991) 24-12-2018 09-01-2019 09-01-2019 09-01-2019 04:30 PM Active और देखें
10. Drilling of Borehole with casing pipe at Ukwa camp Ukwa Mine(16/Civil/UM/18-19/1981 Date 23-12-2018) 24-12-2018 09-01-2019 09-01-2019 09-01-2019 04:30 PM Active और देखें
11. Recovery of 1.5 mm Chilly grade ore from fines of mobile screening plant through trammel at Ukwa Mine(16/Mining/UM/18-19/1987) 24-12-2018 09-01-2019 09-01-2019 09-01-2019 04:30 PM Active और देखें
12. Providing, Fabrication, Erection and Commissioning of 6 Nos Charging bins at Ferro Manganese Plant, Balaghat mine(MOIL/18-19/ET/355) 24-12-2018 21-01-2019 21-01-2019 21-01-2019 03:30 PM Active और देखें
13. FABRICATION OF STEEL ORE PASSES FOR BALAGHAT MINE(AGENT/BGT/MECH/18-19/1244 dtd 21.12.2018) 22-12-2018 04-01-2019 04-01-2019 04-01-2019 04:30 PM Active और देखें
14. Upgradation and renovation of 20 A type quarters at Munsar Mine(MOIL/18-19/ET/370) 21-12-2018 21-01-2019 21-01-2019 21-01-2019 03:30 PM Active और देखें
15. A Construction of boundry wall at FMP B Construction of Re wall on hilly side of FMP, C) Construction of drain network at FMP at Balaghat Mine( MOIL/18-19/ET/360) 21-12-2018 21-01-2019 21-01-2019 21-01-2019 03:30 PM Active और देखें
16. A New administrative building B Office for ferrow manganese plant C Vocational training center and D Gradute trainees hostel at Balaghat Mine(MOIL/18-19/ET/359) 21-12-2018 28-02-2019 28-02-2019 28-02-2019 03:30 PM Active और देखें
17. Providing ,Supplying and erection of 11KV D.P. Structure Near 50-52 Substation Tirodi Mine.(TRD/ELE/18-19/7400002555/3088) 20-12-2018 28-12-2018 28-12-2018 28-12-2018 03:30 PM Active और देखें
18. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR FUEL DISPENSING AND CONSUMPTION MONITORING SYSTEM AT DONGRI BUZURG MINE.(PUR/MOIL/C-5/23/E-59/854-M Dt. 20/12/2018) 20-12-2018 11-01-2019 11-01-2019 11-01-2019 03:30 PM Active और देखें
19. Repairing and Relining of MSRL Electrolytic Cell Tanks of EMD Plant, Dongri Buzurg Mine(MOIL/18-19/ET/354) 20-12-2018 16-01-2019 16-01-2019 16-01-2019 03:30 PM Active और देखें
20. Purchase of HYDRATED LIME POWDER- 60 MT(WE-122 e-tender No.MOIL/18-19/ET-372, Dt.19.12.18) 19-12-2018 16-01-2019 16-01-2019 17-01-2019 03:30 PM Active और देखें
21. PURCHASE OF GEAR MOTOR FOR TIPPLER AT MUNSAR MINE(ASDGM(Mines)/GrpIII/18-19/662) 19-12-2018 02-01-2019 02-01-2019 02-01-2019 03:30 PM Active और देखें
22. PURCHASE OF ADOBE ACROBAT PRO LATEST VER(PUR/MOIL/C-4/138/E-60/860-M Dt. 19/12/2018) 19-12-2018 07-01-2019 07-01-2019 07-01-2019 03:30 PM Active और देखें
23. Construction of drain in village Tighai Distt Nagpur under CSR(MOIL/18-19/ET/365) 19-12-2018 18-01-2019 18-01-2019 18-01-2019 03:30 PM Active और देखें
24. Construction of cement concrete approch road and toilet block at Fetri under CSR(MOIL/18-19/ET/366) 19-12-2018 18-01-2019 18-01-2019 18-01-2019 03:30 PM Active और देखें
25. Purchase of SULPHURIC ACID with Transportation-250 MT(WE-120 e-tender No.MOIL/18-19/ET-371, Dt.19.12.18) 19-12-2018 09-01-2019 09-01-2019 10-01-2019 03:30 PM Active और देखें
26. Collection of fines from different areas at Kandri Mine(MOIL/18-19/ET/363) 17-12-2018 17-01-2019 17-01-2019 17-01-2019 03:30 PM Active और देखें
27. Underground concreting work RCC for stope preparation at 70 Level, -30 Level and -230 Level at Munsar Mine(MOIL/18-19/ET/362) 17-12-2018 17-01-2019 17-01-2019 17-01-2019 03:30 PM Active और देखें
28. Horizontal development at -70 Level of Chikla B incline section of Chikla Mine(MOIL/18-19/ET/361) 17-12-2018 17-01-2019 17-01-2019 17-01-2019 03:30 PM Active और देखें
29. Extra excavation in Mangeniferous rock at pluse 160 Level of Chikla B section of Chikla Mine(MOIL/18-19/ET/368) 17-12-2018 18-01-2019 18-01-2019 18-01-2019 03:30 PM Active और देखें
30. Loading AND transportation of Mill Tailing from Malajkhand mine of M s Hindustan Copper Limited to Ukwa Mine for stowing(MOIL/18-19/ET/367) 17-12-2018 18-01-2019 18-01-2019 18-01-2019 03:30 PM Active और देखें
31. Cleaning of Spillage Material Under and Around all the Equipment at I.M.B Plant at Balaghat Mine( MOIL/18-19/ET/353) 17-12-2018 16-01-2019 16-01-2019 16-01-2019 03:30 PM Active और देखें
32. Electrical heating system for electrolyte, in place of steam boiler heating system at new 500MT EMD Plant at Dongri Buzurg(MOIL/18-19/ET/352) 15-12-2018 15-01-2019 15-01-2019 15-01-2019 03:30 PM Active और देखें
33. Excavation, Cutting and Dressing Works towards development of approach road near Second Vertical Shaft at Munsar Mine.( MUN/CIVIL/NIT/18-19/134 Date 11.12.2018) 14-12-2018 17-12-2018 17-12-2018 17-12-2018 04:30 PM Active और देखें
34. PURCHASE OFGEARED MOTOR FOR 14.5 LEVEL CONVEYOR BELT AT BALAGHAT MINE(PUR/MOIL/BGT/18-19/1191 Dt. 10.12.2018) 14-12-2018 26-12-2018 26-12-2018 26-12-2018 04:30 PM Active और देखें
35. Fabrication of steel ore-pass and manways for Underground Mines i.e Balaghat, Ukwa Chikla Beldongri Munsar Kandri and Gumgaon Mine( MOIL/18-19/ET/351) 14-12-2018 14-01-2019 14-01-2019 14-01-2019 03:30 PM Active और देखें
36. PURCHASE OF STEEL WIRE ROPE - 12 MM (USHA MARTIN MAKE)(PUR/MOIL/C-3/23/E-40/588-M DT.13/12/2018) 13-12-2018 17-01-2019 17-01-2019 17-01-2019 03:30 PM Active और देखें
37. PURCHASE OF CONTROL VALVE FOR CTH141F FOR SANDVIK MAKE JUMBO DRILL MACHINE PN-77793404 AT BALAGHAT MINE( PUR/MOIL/BGT/18-19/1190 dtd 10.12.2018) 13-12-2018 07-01-2019 07-01-2019 07-01-2019 04:30 PM Active और देखें
38. Providing contractual manpower in IMB Plant for smooth operation of Plant at Dongri Buzurg Mine(MOIL/18-19/ET/356) 11-12-2018 10-01-2019 10-01-2019 10-01-2019 03:30 PM Active और देखें
39. Making a Retaining Wall on entry of IMB Plant at Balaghat Mine(Civil/BGT/T.E./2018-19/5372) 10-12-2018 19-12-2018 19-12-2018 19-12-2018 04:30 PM Active और देखें
40. Making of hume Pipe Culvert on Junction of Entry of Entry of IMB Plant at Balaghat Mine( Civil/BGT/T.E./2018-19/5386) 10-12-2018 19-12-2018 19-12-2018 19-12-2018 04:30 PM Active और देखें
41. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HAMMER MILL( PUR/MOIL/C-11/23/E-54/836-M Dt. 10-12-2018) 10-12-2018 02-01-2019 02-01-2019 02-01-2019 03:30 PM Active और देखें
42. Renewal of Environmental Clearance in respect of Three Sand Mining leases i.e. Rajna, Ramdongri (Gumgaon), Kalaphata (Kandri) and Pathri (Chikla) of MOIL Ltd.(MOIL/18-19/ET/349) 07-12-2018 21-12-2018 21-12-2018 21-12-2018 03:30 PM Active और देखें
43. Hiring of 50 MT Capacity 2 Nos. Mobile Crane with 360 Degree revolving Telescopic Extended Boom for unloading and assembling of BH 60M Dumper 3 Nos. at Dongri Buzurg Mine(MOIL/18-19/ET/350) 07-12-2018 21-12-2018 21-12-2018 21-12-2018 05:30 PM Active और देखें
44. Obtaining Environmental Clearance for Ferro Alloy Plant (Metallurgical Ferrous and Non Ferrous Industry) at Gumgaon Mine (Maharashtra)(MOIL/18-19/ET/357) 07-12-2018 21-12-2018 21-12-2018 21-12-2018 03:30 PM Active और देखें
45. Construction of GSR for newly constructed A and C type Qtrs at Balaghat Mine(MOIL/18-19/ET/336) 07-12-2018 07-01-2019 07-01-2019 07-01-2019 03:30 PM Active और देखें
46. Maintenance of garden at Various places at Dongri Buzurg Mine(MOIL/18-19/ET/337) 07-12-2018 07-01-2019 07-01-2019 07-01-2019 03:30 PM Active और देखें
47. Maintenance and opration of water supply scheme at Dongri Buzurg Mine(MOIL/18-19/ET/338) 07-12-2018 07-01-2019 07-01-2019 07-01-2019 03:30 PM Active और देखें
48. Cleaning of sanitary pipe line drain chambers and removal of garbage from MOIL Premises Nagpur(MOIL/18-19/ET/339) 07-12-2018 07-01-2019 07-01-2019 07-01-2019 03:30 PM Active और देखें
49. Construction of Bituminous Tar road including widening of existing concrete road from village Mouli to kalaphata sand ghat tehsil Ramtek Distt Nagpur Under CSR(MOIL/18-19/ET/340) 07-12-2018 07-01-2019 07-01-2019 07-01-2019 03:30 PM Active और देखें
50. Strengthening of Foundation of 132 kw in IMB Plant at Balaghat Mine(Civil/BGT/T.E./2018-19/5332) 06-12-2018 14-12-2018 14-12-2018 14-12-2018 04:30 PM Active और देखें
51. Repairing of Roads from Arjun colony to Manegaon Mine Magazine and Agent Bungalaow to Service Magine at Balaghat Mine(Mining/BGT/T.E./18-19/5335) 06-12-2018 14-12-2018 14-12-2018 14-12-2018 04:30 PM Active और देखें
52. Purchase of Main PLC Control Panel with HMI for Operation of IMB Plant, Balaghat Mine(M.P) - 1 Set (1 Lot) (Only Through e-procurement)(WE-121 DT.05/12/2018 (MOIL/18-19/ET/358)) 05-12-2018 01-01-2019 01-01-2019 02-01-2019 03:30 PM Active और देखें
53. PURCHASE OF HIGH ENERGY EFFICIENT AXIAL FLOW FRP FAN BLADE - 2 SETS FOR NORTH AND SOUTH VENTILATION FAN AT BALAGHAT MINE(M.P) (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/148/E-56/827-M DT.03/12/2018) 03-12-2018 02-01-2019 02-01-2019 02-01-2019 03:30 PM Active और देखें
54. Purchase of Steel RAILS 50 LBS/YARD for Vertical Shaft( WE-107 DT.01.12.2018(e-TenderNo. MOIL/18-19/ET/348) 01-12-2018 26-12-2018 26-12-2018 27-12-2018 03:30 PM Active और देखें
55. Purchase of Electrically Operated Air Cooled Screw Air Compressor with VFD, Capacity-1000 CFM - 2 Nos. (1 No.each for Gumgaon and Kandri Mine)(1 Lot.) (Only Through e-procurement)( WE-101 DT.30/11/2018 (MOIL/18-19/ET/347)) 30-11-2018 14-01-2019 14-01-2019 15-01-2019 03:30 PM Active और देखें
56. Purchase of Pneumatically operated Double Diaphragm Pumps for Various Mines - 11 Nos.(2 Lots) (Only Through e-procurement)(WE-119 DT.30/11/2018 (MOIL/18-19/ET/346)) 30-11-2018 31-12-2018 31-12-2018 01-01-2019 03:30 PM Active और देखें
57. Transportation of Coal to EMD Plant Dongri Buzurg Mine- 4800 MT(WE-114 e-tender No.MOIL/18-19/ET-345, Dt.29.11.18) 29-11-2018 11-12-2018 11-12-2018 12-12-2018 03:30 PM Active और देखें
58. Providing internet connectivity at Kandri., Munsar, Beldongri, Gumgaon, Ukwa Mines and and Nagpur Office(MOIL/18-19/ET/318) 29-11-2018 12-12-2018 12-12-2018 12-12-2018 03:30 PM Active और देखें
59. Transportation of Coal to EMD Plant Dongri Buzurg Mine- 4800 MT(WE-114 e-tender No.MOIL/18-19/ET-345, Dt.29.11.18) 29-11-2018 11-12-2018 11-12-2018 12-12-2018 03:30 PM Active और देखें
60. Providing internet connectivity at Kandri., Munsar, Beldongri, Gumgaon, Ukwa Mines and and Nagpur Office(MOIL/18-19/ET/318) 29-11-2018 12-12-2018 12-12-2018 12-12-2018 03:30 PM Active और देखें
61. Miscellaneous Contract Works to be carried out at Ferro Manganese Plant, Balaghat Mine(MOIL/18-19/ET/316) 28-11-2018 28-12-2018 28-12-2018 28-12-2018 03:30 PM Active और देखें
62. Collection of canteen food items Collection of canteen food items and servicing it to mine employees at Chikla Mine through outside agency(MOIL/18-19/ET/335) 28-11-2018 28-12-2018 28-12-2018 28-12-2018 03:30 PM Active और देखें
63. Collection of canteen food items and servicing it to mine employees at Tirodi Mine through outside agency(MOIL/18-19/ET/334) 28-11-2018 28-12-2018 28-12-2018 28-12-2018 03:30 PM Active और देखें
64. Cleaning and sorting of ROM recovered from Pit No.6 at Sitapatore Mine(MOIL/18-19/ET/332) 28-11-2018 28-12-2018 28-12-2018 28-12-2018 03:30 PM Active और देखें
65. Trench cutting in ore stacks at Kandri Mine(MOIL/18-19/ET/331) 27-11-2018 27-12-2018 27-12-2018 27-12-2018 03:30 PM Active और देखें
66. Purchase of Sand for Sand Stowing Plant at Gumgaon Mine(MOIL/18-19/ET/329) 27-11-2018 27-12-2018 27-12-2018 27-12-2018 03:30 PM Active और देखें
67. Purchase of Sand for Sand Stowing Plant at Kandri Munsar and Beldongri Mine(MOIL/18-19/ET/328) 27-11-2018 27-12-2018 27-12-2018 27-12-2018 03:30 PM Active और देखें
68. Loading of Slag at Ferro Manganese Plant, Balaghat Mine( MOIL/18-19/ET/315) 27-11-2018 26-12-2018 26-12-2018 26-12-2018 03:30 PM Active और देखें
69. Purchase of HIGH DENSITY POLY ETHYLENE-HDPE WOOVEN SACKS - 30150 NOS.(WE-108 e-tender No.MOIL/18-19/ET-344, Dt.27.11.18) 27-11-2018 01-01-2019 01-01-2019 02-01-2019 03:30 PM Active और देखें
70. Extra excavation in Mangeniferous rock at 5th Level of vertical shaft section of Chikla Mine(MOIL/18-19/ET/330) 26-11-2018 10-12-2018 10-12-2018 10-12-2018 03:30 PM Active और देखें
71. Extra excavation in Mangeniferous rock at 70 Level of Chikla B section of Chikla Mine(MOIL/18-19/ET/333) 26-11-2018 10-12-2018 10-12-2018 10-12-2018 03:30 PM Active और देखें
72. PURCHASE OF MOTOR REDUCER (TRACK DRIVE GEAR BOX) (MAKE - SANDVIK ASIA PVT.LTD.) - 1 NO.FOR BALAGHAT MINE(M.P) (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/240/E-55/794-M DT.26/11/2018) 26-11-2018 21-12-2018 21-12-2018 21-12-2018 03:30 PM Active और देखें
73. REPAIRING OF AIR CONDITIONING UNIT OF HEAVY EARTH MOVING MACHINERIES AT DONGRI BUZURG MINE.(DB/MECH/EXC/18-19/482) 26-11-2018 07-12-2018 07-12-2018 07-12-2018 04:30 PM Active और देखें
74. REPAIRING OF TRACK ROLLERS OF BEML DOZER BD155 NO.3 OF DONGRI BUZURG MINE.(DB/MECH/EXC/18-19/483) 26-11-2018 07-12-2018 07-12-2018 07-12-2018 04:30 PM Active और देखें
75. REPAIRING OF BOOM CYLINDER OF TATAT HITACHI 450 HYDRAULIC EXCAVATOR OPERTING AT DONGRI BUZURG MINE.(DB/MECH/EXC/18-19/481) 26-11-2018 07-12-2018 07-12-2018 07-12-2018 04:30 PM Active और देखें
76. Drilling of 57 mm dia holes apremining support for installing cabel bolt in Manginifferous rock in between ch 07 to 11 Level at Balaghat Mine( Mining/BGT/T.E./18-19/5214) 26-11-2018 04-12-2018 04-12-2018 04-12-2018 04:30 PM Active और देखें
77. PURCHASE OF HDPE PIPES 140 MM FOR BALAGHAT MINE(PUR/MOIL/BGT/HDPE/18-19/1091 dtd 22/11/2018) 23-11-2018 12-12-2018 12-12-2018 12-12-2018 04:30 PM Active और देखें
78. PURCHASE OF HDPE PIPES 140 MM FOR BALAGHAT MINE(PUR/MOIL/BGT/HDPE/18-19/1091 dtd 22/11/2018) 23-11-2018 12-12-2018 12-12-2018 12-12-2018 04:30 PM Active और देखें
79. PURCHASE OF HDPE PIPES 140 MM FOR BALAGHAT MINE( PUR/MOIL/BGT/HDPE/18-19/1091 dtd 22/11/2018) 23-11-2018 03-12-2018 03-12-2018 03-12-2018 04:30 PM Active और देखें
80. Annual Rate Contract for supply of Cement Capsules - 446700 Nos.(WE-109 DT.22.11.2018(e-TenderNo. MOIL/18-19/ET/342) 22-11-2018 13-12-2018 13-12-2018 14-12-2018 03:30 PM Active और देखें
81. Designing, Engineering, Supplying, Installation, Commissioning and Testing of 2 X 1600KVA, 11KV/433V Indoor Substation for Second Vertical Shaft Project at Ukwa Mine(MOIL/18-19/ET/307) 22-11-2018 28-12-2018 28-12-2018 28-12-2018 03:30 PM Active और देखें
82. Diamond Drill Bits and Accessories- 7 Items.(WE-105 DT.22.11.2018 (e-TenderNo.MOIL/18-19/ET/343) 22-11-2018 24-01-2019 24-01-2019 25-01-2019 03:30 PM Active और देखें
83. DUST MASK, EAR PLUGS, EAR MUFF(PUR-MOIL-C-1 190-WE-103-ET-327 dt. 20/11/2018) 20-11-2018 17-12-2018 17-12-2018 18-12-2018 03:30 PM Active और देखें
84. C. I. SHEAVE WHEEL 2800mm DIA(PUR-MOIL-C-12-50-WE-113-ET-326 dt. 19-11-2018) 19-11-2018 10-12-2018 10-12-2018 11-12-2018 03:30 PM Active और देखें
85. Purchase of Jaw Plates for Sayaji Make Jaw Crushers(WE-110 e-tender No.MOIL/18-19/ET-325, Dt.19.11.18) 19-11-2018 11-12-2018 11-12-2018 12-12-2018 03:30 PM Active और देखें
86. Purchase of Jaw Plates for Sayaji Make Jaw Crushers(WE-110 e-tender No.MOIL/18-19/ET-325, Dt.19.11.18) 19-11-2018 11-12-2018 11-12-2018 12-12-2018 03:30 PM Active और देखें
87. Extension of existing old metering room at Kandri Mine.(KAN/Civil/NIT/2018-19/2624 Dated 17.11.2018) 19-11-2018 26-11-2018 26-11-2018 26-11-2018 04:30 PM Active और देखें
88. Printing of Company Diary 2019(PUR-MOIL-C-12-26-WE-111-ET-323 dt.16/11/2018) 17-11-2018 05-12-2018 05-12-2018 06-12-2018 03:30 PM Active और देखें
89. Renovation of Vertical Shaft by replacement of Guide Rails, Buntons, Sollars, Laaders and Fencing at Chikla Mine( MOIL/18-19/ET/303) 17-11-2018 17-12-2018 17-12-2018 17-12-2018 03:30 PM Active और देखें
90. Providing, Supplying, Installation and Commissioning of heavy duty centrifugal pump with drive and operating valves at Chikla Mine(MOIL/18-19/ET/306) 17-11-2018 17-12-2018 17-12-2018 17-12-2018 03:30 PM Active और देखें
91. Purchase of Steel Cages for Munsar Mine - 3 Nos.(1 Lot) (Only Through e-procurement)( WE-112 DT.17/11/2018 (MOIL/18-19/ET/324)) 17-11-2018 17-12-2018 17-12-2018 18-12-2018 03:30 PM Active और देखें
92. Construction of Rest Shelter Near Screening Plant, near Siding Region at Munsar Mine(MOIL/18-19/ET/313) 16-11-2018 17-12-2018 17-12-2018 17-12-2018 03:30 PM Active और देखें
93. Construction of collection tank and circulation network for sewage treatment plant at Munsar Mine(MOIL/18-19/ET/312) 16-11-2018 17-12-2018 17-12-2018 17-12-2018 03:30 PM Active और देखें
94. Replacement of old damage steel doors and windows with new steel doors and windows for camp quarters at UKWA mine(MOIL/18-19/ET/308) 16-11-2018 17-12-2018 17-12-2018 17-12-2018 03:30 PM Active और देखें
95. Civil House Keeping Works to Industrial and Alliied Building inside Mine premises for upcoming Safety Week at Balaghat Mine(Civil/BGT/T.E./2018-19/4959) 16-11-2018 23-11-2018 23-11-2018 23-11-2018 04:30 PM Active और देखें
96. Construction of foundation and extended platform for Elevated feeding hopper of Mobile Crusher at Munsar Mine(MOIL/18-19/ET/311) 16-11-2018 17-12-2018 17-12-2018 17-12-2018 03:30 PM Active और देखें
97. Construction and installation of bio toilet for underground in Kandri Mine(KAN/CIVIL/NIT/2018-19/2544 Date 10.11.2018) 16-11-2018 17-11-2018 17-11-2018 17-11-2018 04:30 PM Active और देखें
98. COMPANY CALENDAR(PUR/MOIL/C-12/26/E-52/781-M dt. 16/11/2018) 16-11-2018 30-11-2018 30-11-2018 30-11-2018 03:30 PM Active और देखें
99. Construction of Durga Stage including other amenities at Football ground at Kandri Mine(MOIL/18-19/ET/310) 16-11-2018 17-12-2018 17-12-2018 17-12-2018 03:30 PM Active और देखें
100. Providing and fixing of paving blocks in rest house at Chikla Mine.(TE/CH/CIVIL/18-19/432 date 25/10/2018) 15-11-2018 21-11-2018 21-11-2018 21-11-2018 03:30 PM Active और देखें

निविदाएं अधिक जानकारी

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

(2204) वर्ष के निविदाएं देखें
(2024) वर्ष के निविदाएं देखें
(2023) वर्ष के निविदाएं देखें
(2022) वर्ष के निविदाएं देखें
(2021) वर्ष के निविदाएं देखें
(2020) वर्ष के निविदाएं देखें
(2019) वर्ष के निविदाएं देखें
(2018) वर्ष के निविदाएं देखें
(2017) वर्ष के निविदाएं देखें
(2016) वर्ष के निविदाएं देखें
(2015) वर्ष के निविदाएं देखें
(2014) वर्ष के निविदाएं देखें
(2013) वर्ष के निविदाएं देखें
(2012) वर्ष के निविदाएं देखें
(24) वर्ष के निविदाएं देखें
पूर्ण निविदा पुरालेख देखें
सभी मॉयल निविदाएं देखें